A.
The VESCP plan approving authority will be responsible for the enforcement of this chapter and will direct the on-site inspection of each project.
(1)
The VESCP plan approving authority shall periodically inspect the land-disturbing activity in accordance with 9VAC25-840-60 of the Virginia Erosion and Sediment Control Regulations to ensure compliance with the approved plan and to determine whether the measures required in the plan are effective in controlling erosion and sedimentation. The owner, permittee, or person responsible for carrying out the plan shall be given notice of the inspection.
(2)
The responsible land disturber, as provided by § 62.1-44.15:52, shall be in charge of and responsible for carrying out the land-disturbing activity and provide for periodic inspections of the land-disturbing activity. The VESCP plan approving authority may require the person responsible for carrying out the plan to monitor and maintain the land-disturbing activity. The person responsible for carrying out the plan will maintain records of these inspections and maintenance, to ensure compliance with the approved plan and to determine whether the measures required in the plan are effective in controlling erosion and sedimentation.
(3)
The VESCP plan approving authority will be responsible for developing and maintaining a monitoring system for all land-disturbing projects. The system shall contain a record of each inspection, date of inspection, date land-disturbing activities commenced and comments concerning compliance or noncompliance. The VESCP plan approving authority may require monitoring and reports from the person responsible for carrying out the plan.
B.
If the VESCP plan approving authority determines that there is a failure to comply with the plan, notice shall be served upon the permittee or person responsible for carrying out the plan by mailing with confirmation of delivery to the address specified in the permit application or in the plan certification, or by delivery at the site of the land-disturbing activities to the agent or employee supervising such activities. The notice shall specify the measures needed to comply with the plan and shall specify the time within which such measures shall be completed. Upon failure to comply within the specified time, the permit may be revoked and the permittee or person responsible for carrying out the plan shall be shall be subject to the penalties provided by this chapter.