[Ord. 263, 11/6/1969, § 9]
Upon the neglect of any proper owner to construct, reconstruct or repair any sidewalk and/or curb, following notice so to do as provided in § 401 or § 402 of this Part, the Borough may, after notice cause the said work to be done at the cost of such owner, and may collect the cost of such work, with an additional amount of 10% from such owner in default. The Borough shall further have authority, in the case of construction, reconstruction or repair of sidewalk and/or curb otherwise than in strict conformity with the requirements of this Part, and/or of any notice given pursuant thereto, to notify such property owner to correct or rectify such defective or unlawful work and, if such property owner shall not have corrected or rectified the same within the time specified in such notice, the Borough may cause such work of correction or rectification to be done and may collect the cost thereof with an additional amount of 10% from such property owner in default.