The master plan shall remain vested as long as it can be proven,
to the satisfaction of the Planning Board, that work is proceeding
on either the approval stages or on the construction of the development
as shown in the approved master plan documents. Master plan vesting
shall include the zoning requirements, conceptual layout and all conditions
shown on the approved master plan drawings and supporting materials.