[Ord. 3-2016, 10/13/2016]
The Township of Canton may require the submittal of a letter of credit or cash bond prior to issuance of a permit in order to insure that the stormwater practices are installed by the permit holder as required by the approved stormwater management plan. The amount of the installation performance security shall be the total estimated construction cost of the stormwater management practices approved under the permit, plus 10%. The performance security shall contain forfeiture provisions for failure to complete work specified in the stormwater management plan. The installation performance security shall be released in full only upon submission of as-built plans and written certification by a registered professional engineer that the stormwater practice has been installed in accordance with the approved plan and other applicable provisions of this chapter. The Township of Canton will make a final inspection of the stormwater practice to ensure that it is in compliance with the approved plan and the provisions of this chapter. Provisions for a partial pro-rata release of the performance security based on the completion of various development stages can be done by the Township of Canton.