[Ord. No. 865 § 1, 12-20-2010]
The standards referenced and adopted in this Article shall apply
to site design for any project which includes alteration of site drainage
or floodplain areas, connection to storm sewer systems or open stormwater
channels, and all land disturbance projects encompassing more than
one (1) acre.
[Ord. No. 865 § 1, 12-20-2010]
All private and public projects to which this Article is applicable
must be reviewed and approved for stormwater issues by the Metropolitan
St. Louis Sewer District (MSD) in accord with the rules, regulations,
standards and procedures of that body prior to the issuance of any
permits for land disturbance or construction.
[Ord. No. 865 § 1, 12-20-2010]
Applicants for any development, redevelopment, land disturbance,
construction or other undertaking to which this Article is applicable
shall be required to provide any and all information necessary to
enable the Metropolitan St. Louis Sewer District, the City and City
Plan review personnel to assess and apply the principles promulgated
by MSD, entitled "Site Design Guidance — Tools for Incorporating
Post-Construction Stormwater Quality Protection Into Concept Plans
and Land Disturbance Permitting," as revised on April 17, 2009, as
such standards and criteria may be promulgated by MSD from time to
time.