[Ord. 468, 5/20/1996; as amended by Ord. 585, 9/12/2011]
1. No unauthorized person shall uncover, make any connections with or
opening into, use, alter or disturb any public sewer or appurtenance
thereof without first obtaining a written permit from the Borough.
2. There shall be three classes of permits for connections to the Borough's
wastewater facilities: residential, commercial and industrial. In
all cases, the owner shall make application for a permit to connect
to the Borough's wastewater facilities on a special form furnished
by the Borough. The permit application shall be supplemented by wastewater
information including plans and specifications and other information
considered by the Borough pertinent to the administration of this
Part. The permit and inspection fee may be amended from time to time
by Borough Council and shall be paid to the Borough at the time the
application is filed.
[Ord. 468, 5/20/1996]
All costs and expenses incidental to the installation and connection
of the building sewer shall be borne by the owner(s). The owner(s)
shall indemnify the Borough and Authority from any loss or damage
that may directly or indirectly be occasioned by the installation
of the building sewer.
[Ord. 468, 5/20/1996; as amended by Ord. 585, 9/12/2011]
A separate and independent building sewer shall be provided
for every building, except where one building stands at the rear of
another on an interior lot and no private sewer is available or can
be constructed to the rear building through an adjoining alley, court,
yard or driveway. In such a case, the building sewer serving the front
building may be extended to the rear building and the whole considered
as one building sewer. The Borough and Authority assumes no obligation
or responsibility for damage by or resulting from any single connection
aforementioned. For any subdivision of property in which there is
a common sewer lateral, there shall be a separation of the building
sewers prior to approval of such subdivision. A sewer tap shall be
created for the divided property and utility easements shall be indicated
on subdivision plat.
[Ord. 468, 5/20/1996]
Existing building sewers may be used for connection of new buildings
only when they are found, on examination and tested by the Borough,
to meet the requirements of this Part.
[Ord. 468, 5/20/1996]
The size, slope, alignment, materials of construction of a building
sewer, and the methods used in excavating, placing of pipe, jointing,
testing and backfilling the trench, shall all conform to applicable
rules and regulations of the Borough or Authority. In the absence
of specific provisions the Borough shall provide such requirements.
Service lines will not be installed when the service line passes over
or through premises which at the time may be the property of persons
other than the owner of the premises to be supplied, unless the owner
of the premises supplied assumes all liability and furnishes a right-of-way
agreement in a form satisfactory to the Council or its duly authorized
representative.
[Ord. 468, 5/20/1996; as amended by Ord. 585, 9/12/2011]
Whenever possible, the building sewer shall be brought to the
building at an elevation below the basement floor. In all buildings
in which any building drain is too low to permit gravity flow to the
public sewer, wastewater carried by such building drain shall be lifted
by an approved means and discharged to a building sewer draining to
the Borough sewer.
[Ord. 468, 5/20/1996; as amended by Ord. 585, 9/12/2011]
No person shall make connection of roof downspouts, foundation
drains, sump pumps, areaway drains or other sources of surface runoff
or groundwater to a building sewer.
[Ord. 468, 5/20/1996; as amended by Ord. 585, 9/12/2011]
The connection of the building sewer into public sewer shall
conform to the requirement of the Uniform Construction Code (UCC)
or other applicable rules and regulations of the Borough, Authority
or the procedures set forth in appropriate specification of the ASTM.
All such connections shall be made gastight and watertight and verified
by the Borough. Any deviation from the prescribed procedures and materials
must be approved by the Borough before installation.
[Ord. 468, 5/20/1996]
The applicant for the building sewer permit shall notify the
Borough when the building sewer is ready for inspection prior to its
connection to the public sewer. The connection and testing shall be
made subject to the approval of appropriate Borough officials. The
Borough reserves the right to inspect the plumbing on any premises
and, if it shall be found not in conformity with the rules of the
Borough, to refuse water service until the objectionable or improper
work is corrected.
[Ord. 468, 5/20/1996]
All excavation for building sewer installation shall be adequately
guarded with barricades and lights so as to protect the public from
hazard. Streets, sidewalks, parkways, and other public property disturbed
in the course of the work shall be restored in a manner satisfactory
to the Borough.
[Ord. 468, 5/20/1996]
The Borough shall not issue a permit for any class of connection
to the Borough wastewater sewers or wastewater treatment facilities
unless there is sufficient capacity, both hydraulically and/or organically
(as determined by the Borough), not legally committed to other users,
in the wastewater sewers and treatment facilities to convey and adequately
treat the quantity of wastewater which the requested connection will
add to the system. The Borough may permit such connection if there
are legally binding commitments to provide the needed capacity.
[Ord. 468, 5/20/1996; as amended by Ord. 545, 2/26/2007,
§ 18-152]
1. The customer shall be responsible for the maintenance and repair
of the service line from the main, to and including the customer's
premises. All breaks or blockages in the sewer lateral must be repaired
promptly by the proper owner. The service lateral installed by the
consumer shall not be less in size and quality than prescribed by
the Borough and shall be laid not less than the required depth below
the surface as specified by the Borough and shall not be covered until
the lateral is inspected by the Borough. If defects in workmanship
or material are found, water service shall not be turned on until
such defects are remedied. All plumbing connections shall be installed
in accordance with the ICC Plumbing Code in force at the time of the
installation of the service line.
2. The service line from the main to the premises shall be kept in good
condition by the customer under penalty of discontinuance of service
by the Borough.
[Ord. 468, 5/20/1996; as amended by Ord. 545, 2/26/2007,
§ 18-153]
All abandoned sanitary sewer laterals shall be immediately disconnected
at the property line and properly blocked by the property owner to
prevent water infiltration into the system at his own expense and
he shall be liable for all damages that may arise by reason of any
abandoned service lateral remaining attached to the sanitary sewer
main in front of his property or wherever the same may be. It shall
be the responsibility of the contractor to disconnect sewers and plug
according to Borough specs.
[Ord. 468, 5/20/1996; as added by Ord. 545, 2/26/2007, § 18-154]
See Part
1, "Sewer Connections," of this chapter.
[Ord. 468, 5/20/1996; as added by Ord. 545, 2/26/2007, § 18-155;
and amended by Ord. 585, 9/12/2011]
1. All new and replacement plumbing installations connected to the Borough
of Edinboro sewer system shall comply with the applicable version
of the IPC as referenced by the PA UCC Act 45 of 1999. The following
sections are amended to read:
A. 708.3.5 Building drain and building sewer junction. There shall be
a cleanout near the junction of the building drain and the building
sewer. The cleanout shall be located outside the building wall and
shall be brought up to finished ground level. An approved cleanout
shall be used at the location to serve as a required cleanout for
both the building drain and building sewer. The termination of the
cleanout shall be perpendicular to the ground from which it is concealed.
(See drawing in appendix).
B. 1002.6 Building traps shall be provided with a cleanout and a relief
vent or fresh air intake on the inlet side of the trap. The size of
the relief vent or fresh air intake shall not be less than 1/2 the
diameter of the drain to which the relief vent or air intake connects.
Such relief vent or fresh air intake shall be carried above grade
and shall be terminated in an outlet located outside the building.