[R.O. 1993 § 705.010; Code 1972 § 30-14; CC 1988 § 27-36]
Any trunk line constructed and connected into the City sanitation system shall become the property of the City and a part of the City sanitation system, and shall be maintained by the City. Before any trunk line is accepted, it shall meet all the requirements stated in this Article.
[R.O. 1993 § 705.020; Code 1972 § 30-15; CC 1988 § 27-37]
Future sewer extensions by the City shall, of necessity, be regulated by the funds available and appropriated by the City Council. Where City extensions are constructed by the City, priority shall be given to residences where no City sewer service was available prior to July 1, 1969.
[R.O. 1993 § 705.030; Code 1972 § 30-16; CC 1988 § 27-38]
A. 
Sewer extensions outside the City shall be regulated by contract, the nature and form of which shall be approved by the City Council, and shall be standard for all connections and extensions outside of the City.
B. 
The contract shall contain a provision that all land served by the sewer will be developed according to all applicable subdivision and building regulations of the City and a statement that the provision shall apply to present and all future owners of the land.
[R.O. 1993 § 705.040; Code 1972 § 30-19; CC 1988 § 27-39]
There will be no City participation in the cost of construction of sewer extensions outside of the City.
[R.O. 1993 § 705.050; Code 1972 § 30-20; CC 1988 § 27-40]
A. 
It shall be unlawful to place any pipe or conduit which carries or is intended to carry sewage in the same trench or ditch with a pipe or conduit which carries, or is intended to carry, a potable water supply. In every case where a water and sewer line are parallel, the water line shall be at least ten (10) feet horizontally from and at a higher elevation than the sewer line.
B. 
Where it is not possible to meet the above conditions, or where for any reason unusual circumstances present a potential or actual hazard to a potable water supply, the Missouri Department of Natural Resources must be notified in writing and plans submitted showing the precautions which are to be taken to minimize the hazard to the potable water supply. In no case shall the work proceed until the plans for protecting the water supply have been approved in writing by the Missouri Department of Natural Resources.
[R.O. 1993 § 705.060; Code 1972 § 30-22; CC 1988 § 27-41]
No sewer line less than six (6) inches in diameter located in the public right-of-way shall be maintained by the City Sewer Department.
[R.O. 1993 § 705.070; Code 1972 § 30-23; CC 1988 § 27-42; Ord. No. 2003-2537 § 1, 3-25-2003]
Each residential structure shall have its own private lateral tapped into the City sewer. No two (2) separate structures shall share the same lateral or sewer tap. All new and renovated sewer laterals shall be equipped with an approved backflow prevention device.
[R.O. 1993 § 705.080; Ord. No. 99-2405 § 1, 10-26-1999]
A. 
Quality Assurance.
1. 
Testing Laboratory.
a. 
Soil compaction testing and other required testing will be performed by a testing laboratory selected by the owner.
b. 
Frequency of testing and location of tests shall be determined by the owner's representative and testing laboratory personnel to assure compliance with specification requirements.
2. 
Standards. Tests shall comply with the latest revisions:
a. 
ASTM C136: Sieve or screen analysis of fine and coarse aggregates.
b. 
ASTM D2922: Density of soil in place and soil aggregate in place by nuclear methods.
c. 
ASTM D2167: Density of soil in place by the rubber balloon method.
d. 
ASTM D698: Moisture density relations of soils and soil-aggregate mixtures using a five-and-one-half-pound rammer and eighteen-inch drop.
e. 
ASTM D2487: Classification of soils for engineering purposes.
3. 
Compliance. Contractor shall correct all deficiencies disclosed by test results promptly upon being notified of deficiencies.
B. 
Fill And Pipe Embedment Material.
1. 
Embedment Material.
a. 
Material shall be clean river gravel or sound crushed limestone, free of cementitious, shaly or flat and flaky particles in an amount which would cause the material to cake or pack or otherwise form an unyielding support for the pipe. Gradation shall be:
(1) 
Three-fourths-inch square mesh sieve: one hundred percent (100%) passing.
(2) 
One-half-inch square mesh sieve: ninety percent (90%) to one hundred percent (100%) passing.
(3) 
No. 4 square mesh sieve: zero percent (0%) to fifteen percent (15%) passing.
(4) 
No. 8 square mesh sieve: zero percent (0%) to five percent (5%) passing.
b. 
Where bedding rock is not required, bedding material shall be same as fill material.
2. 
Fill Material. Backfill material shall be selected earth or granular fill material, free from sod, sticks and roots over one-half (1/2) inch in diameter, and free from hard lumps, clods or rock in such quantity or concentration as to interfere with the specified compaction. Material shall be of proper moisture content for specified compaction.
C. 
Execution — General.
1. 
Trenching work shall be performed in a safe and proper manner, with suitable precautions being taken against hazards of every kind. Trenching shall provide adequate working space and clearances for the work to be performed therein.
2. 
Trenching and backfilling during freezing weather shall not be done except by permission of the engineer. No backfill materials shall be installed on frozen surfaces nor shall frozen materials, snow or ice be placed in any backfill.
3. 
When operating on pavements or walks all equipment shall be rubber tired, except for excavation equipment. Excavating equipment, in such cases, shall not have grousers, cleats or lugs on the tracks. The contractor shall take all precautions necessary to protect the existing pavements and walks.
4. 
No classification of excavated materials will be made. Trenching and trenching work shall include the removal and subsequent handling of all materials excavated or otherwise removed in performance of the contract work, regardless of the type, character, composition or condition thereof.
5. 
Pipe lines and other existing underground installations and structures in the vicinity of the work to be done hereunder are indicated on the plans according to the best information available to the owner. The owner does not guarantee the accuracy of such information. The contractor shall make every effort to locate all underground pipe lines, conduits and structures by contacting owners of underground utilities and by prospecting in advance of trench excavation. Damage to any existing underground installation caused by the contractor's operation shall be repaired at the contractor's expense.
6. 
Any delays or extra cost to the contractor caused by pipe lines or other underground structures or obstructions not shown by the plans, or found in locations different than those indicated, shall not constitute a claim for extra work, additional payment or damages.
7. 
Erosion control of disturbed areas will be required during the construction period through the use of check dams, siltation pools, mulching, etc.
8. 
Operation.
a. 
Use all means necessary to control dust or mud that may interfere with operation.
b. 
Maintain all streets and driveways free of dirt and materials from contractor's operation.
9. 
Protection.
a. 
Use all means necessary to protect material and preserve specification requirements.
b. 
Replace all damaged material or material that has lost specification requirements.
D. 
Trench Excavation.
1. 
General.
a. 
The contractor shall not open more trench in advance of pipe laying than is necessary to expedite the work. One (1) block or four hundred (400) feet (whichever is the shorter) shall be the maximum length of open trench permitted on any line under construction.
b. 
Except where tunneling is permitted by the engineer or called for on the plans, all trench excavation shall be open cut from the surface.
c. 
Trench walls shall be vertical, and braced where necessary, in streets or improved area unless otherwise authorized by the engineer.
2. 
Alignment And Grade.
a. 
Sewer And Storm Sewer Lines. The alignment and grade or elevation of each pipe line shall be fixed and determined by means of offset stakes. Vertical and horizontal alignment of pipes and the maximum joint deflection used in connection therewith shall be in conformity with the requirements of the specification covering the installation of the pipe being laid in each case.
b. 
Water Lines. Trenches shall be carefully excavated so that the minimum cover over top of pipe will be forty-two (42) inches to existing street or ground surface, or to future surface when indicated. Greater cover at some locations along the line may be required due to street or ground profile and clearance of culverts, structures, utility lines, etc.
3. 
Minimum Trench Widths And Pipe Clearances.
a. 
Trenches shall be excavated to a width which will provide adequate working space and pipe clearances for proper pipe installation, jointing and embedment.
b. 
Below an elevation of twelve (12) inches from ground level to the top of the installed pipe, the trench width shall be maintained as narrow as possible.
c. 
Where necessary to reduce the earth load on trench banks to prevent sliding and caving, the banks may be cut back on slopes which shall not extend lower than one (1) foot above the top of the pipe.
4. 
Mechanical Excavation.
a. 
The use of mechanical equipment will not be permitted in locations where its operation would cause damage to buildings, culverts, or other existing property, utilities, or structures above or below ground; in all such locations, hand excavating tools and methods shall be used.
b. 
Mechanical equipment used for trench excavation shall be of a type, design and construction and shall be so operated, that the rough trench excavation bottom elevation can be controlled, that uniform trench widths and vertical side walls are obtained at least from an elevation one (1) foot above the top of the installed pipe to the bottom of the trench, and that the trench alignment is such that the pipe when accurately laid to specified alignment will be centered in the trench with adequate clearance between the pipe and side walls of the trench. Undercutting of the trench side wall to obtain clearance will not be permitted.
5. 
Excavation Below Pipe Subgrade. Except where otherwise required, pipe trenches shall be excavated below pipe subgrade elevations to provide for the installation of granular fill pipe foundation material.
6. 
Unauthorized Trench Widths. Where the width of the lower portion of the trench as excavated at any point exceeds the maximum permitted, either pipe of adequate strength, classification or gage, special pipe embedment, or Class A concrete arch encasement (for concrete pipe only), as required by loading conditions and as determined by the engineer, shall be furnished and installed by and at the expense of the contractor.
7. 
Grubbing. Grub out live roots for a distance of at least six (6) inches below and eight (8) inches on sides of outside surface of pipe.
8. 
Bell Holes. Bell holes shall provide adequate clearance for the tools and methods used in installing the pipe. No part of any bell or coupling shall be in contact with the trench bottom, trench walls, or the granular fill when the pipe is jointed.
9. 
Cutting Concrete Pavement And Walks.
a. 
Cuts in concrete and asphalt pavements shall be no larger than necessary to provide adequate working space for proper installation of pipe and pipe line appurtenances. Cutting shall be started with a concrete saw (or by other cutting method approved by the engineer) and in a manner which will provide a clean groove at least one and one-half (1 1/2) inches deep along each side of the trench and along the perimeter of cuts for structures.
b. 
Pavement and base pavement over trenches excavated for pipe lines shall be removed so that a shoulder not less than six (6) inches in width at any point is left between the cut edge of the pavement and the top edge of the trench. The trench width at the bottom shall not be greater than at the top and no undercutting will be permitted. Pavement cuts shall be made to and between straight or accurately marked curved lines which, unless otherwise required, shall be parallel to the center line of the trench.
E. 
Sheeting And Shoring. Except where banks may be cut back on a stable slope, excavation for trenches shall be properly and substantially sheeted, braced and shored, as necessary, to prevent caving or sliding, to provide protection for the workmen and the work, and to provide protection for existing structures and facilities. Sheeting, bracing and shoring shall be designed and built to withstand all loads that might be caused by earth movement or pressure, and shall be rigid, maintaining its shape and position under all circumstances.
F. 
Stabilization — General.
1. 
Trench bottoms shall be firm, dense and thoroughly compacted and consolidated; shall be free from mud and muck; and shall be sufficiently stable to remain firm and intact under the feet of the workmen.
2. 
Trench bottoms which are otherwise solid, but which become mucky on top due to construction operations, shall be reinforced with one (1) or more layers of granular fill material or other crushed stone or gravel embedded therein. Not more than one-half-inch depth of mud or muck shall be allowed to remain on stabilized trench bottoms when the pipe bedding material is placed thereon. The finished elevation of stabilized subgrades for concrete structures shall not be above the subgrade elevations.
3. 
All stabilization work hereunder shall be performed by and at the expense of the contractor.
4. 
If the subgrade for pipe can be stabilized with a thickness of granular fill of twelve (12) inches or less below bottom of pipe, or subgrade of structure, such stabilization will be at the contractor's expense.
G. 
Blasting.
1. 
Blasting will not be allowed, unless approved by the owner.
2. 
The contractor shall comply with all laws, ordinances, applicable safety code requirements, and regulations relative to the handling, storage, and use of explosive and the protection of life and property. He/she shall be responsible for all damage caused by his/her blasting operations.
3. 
Suitable weighted plank covering or mattresses shall be provided to confine all materials, lifted by blasting, within the limits of the excavation or trench.
4. 
All rock which cannot be handled and compacted as earth shall be kept separate from other excavated materials and shall not be mixed with other backfill or embankment materials except as specified or directed.
H. 
Removal Of Water. The contractor shall provide and maintain adequate dewatering equipment to remove and dispose of all surface and ground water entering excavations, trenches, or other part of the work. Each excavation shall be kept dry during subgrade preparation and continually thereafter until the structure to be built, or the pipe line to be installed, therein is completed to the extent that no damage from hydrostatic pressure, flotation, or other causes will result.
I. 
Standard Compaction And Field Density Tests.
1. 
General. Wherever the terms, "_____% of Maximum Density" or "Optimum Moisture," are used, Maximum Density and Optimum Moisture shall be determined by the standard compaction test described below.
2. 
Standard Compaction Test.
a. 
The standard compaction test shall be in accordance with AASHTO Desig. T99, except as modified below.
b. 
For samples containing no material retained on the No. 4 sieve, use Method A or B. When the plasticity index of the soil is greater than twenty-five (25) (heavy clays), the soil shall be placed in the mold in four (4) layers, each compacted as outlined in the test method used.
c. 
For samples containing material retained on the No. 4 sieve, use Method D, preferably, or Method C. The amount retained on the three-fourths-inch sieve shall be weighed and discarded. To prepare the sample for the compaction test, the same amount of three-fourths-inch to No. 4 sieve material shall be substituted for the portion discarded.
3. 
Field Density Test. Field density shall be obtained using the sand cone method (AASHTO Desig. T-147), by the balloon method, or by use of any satisfactory materials or equipment suitable to the conditions prevailing in the material being tested. The calculated density obtained in this test is divided by the maximum density as determined by the Standard Compaction Test to determine the percent compaction obtained.
4. 
Rock Correction. When the amount of material retained on the No. 4 sieve is different in the field density tests than that in the sample used in the Standard Compaction Test, the actual degree of compaction shall be determined by applying a correction factor to the apparent percent compaction. This correction factor may be arrived at by any well established engineering procedure or by the recommendations of the State Highway Commission, Geology and Soils Manuals, said recommendations being made a part of this contract by reference.
5. 
Comparison With Surrounding Soil Density. It will be assumed that undisturbed surrounding soil in its natural state will have a field density of eighty-seven percent (87%) of maximum density. On this basis, where ninety percent (90%) of maximum density is specified, the required density will be one hundred three and one-half percent (103.5%) of density of the surrounding soil. Where ninety-five percent (95%) of maximum density is specified, the required density will be one hundred nine percent (109%) of the density of the surrounding soil.
J. 
Pipe Embedment.
1. 
General. Place pipe embedment material on a suitably prepared subgrade in lifts not exceeding six (6) inches and bring up evenly on both sides of pipe. Do not dump over side of trench in any manner that will bring earth into the embedment material or displace the pipe. Compact, vibrate, or slice with a shovel, in such manner that material fill will take its final compaction and provide uniform and solid bearing under the pipe and its haunches.
2. 
Sewer And Storm Pipe Bedding.
a. 
Class B bedding shall be used on all piping, except for locations noted on the plans where Class A bedding is required.
b. 
All granular bedding is to be omitted in a five-foot section of trench immediately upstream of each manhole. The trench bottom is to be shaped to fit the pipe bottom with hand compaction of earth around the sides and to a point two (2) feet above the pipe. If earth is unsuitable for pipe support or backfill, over excavate and replace with suitable material. Earth in the five-foot section of trench length shall be compacted to at least ninety percent (90%) of optimum density.
c. 
Placement And Compaction. All granular fill material beneath the pipe shall be spread and the surface graded to provide a uniform and continuous support beneath the pipe at all points between bell holes or pipe joints. It will be permissible to slightly disturb the finished subgrade surface by the withdrawal of pipe slings or other lifting tackle.
d. 
After each pipe has been graded, aligned and placed in final position on the bedding material, and shoved home, sufficient pipe embedment material shall be deposited and compacted around each side of the pipe and back of the bell or end thereof to firmly hold and maintain the pipe in proper position and alignment during subsequent pipe jointing, embedment and backfilling operations.
e. 
Embedment material shall be deposited and compacted uniformly and simultaneously on each side of the pipe to prevent lateral displacement of the pipe and brought to a minimum height of six (6) inches above top of pipe.
3. 
Water Line Pipe Bedding.
a. 
Where rock has been excavated, selected earth or granular material shall be placed under the sides and around the pipe to a point six (6) inches above the top of the pipe. Embedment material shall be deposited simultaneously on each side of the pipe to prevent lateral displacement of the pipe.
b. 
When not in rock excavation, all buried pipe shall be installed under laying condition Type 2 as described in AWWA C150/A21.50, latest edition. This condition calls for flat-bottom trench with backfill lightly consolidated to the center line of the pipe.
K. 
Trench Backfill Compaction. All trench backfill above pipe embedment shall conform to one (1) of the following specifications:
1. 
All county and City gravel surface roads shall be backfilled entirely with approved crushed rock or river gravel. The disposal of unsuitable material excavated will be the responsibility of the contractor.
2. 
Ninety-Percent Compacted Backfill. Under streets, drives or State or county highways surfaced with gravel, crushed stone, blacktop or other low- or intermediate-type surfacing. In street, road, highway, railway or alley rights-of-way. In traveled ways. In established lawns. Any line within five (5) feet of back of curb or five (5) feet of street surfacing if no curb, either perpendicular to or parallel to the street shall be considered as under the street surfacing, and ninety-percent compaction shall apply.
3. 
Ninety-Five-Percent Compacted Backfill. Under concrete, asphaltic concrete, brick, concrete structures or other high-type pavements. Under concrete walks, curbs, gutters and culverts. Under all types of street surfacing where trench cut is approximately at right angle to roadway.
4. 
In areas not listed above, backfill shall be compacted to a density equal to the surrounding ground.
5. 
Six (6) inches of topsoil shall be placed in the top of trenches that are to be covered with sod or to be seeded.
6. 
If specified density cannot be obtained with available earth, the contractor shall furnish and haul granular fill material or suitable earth at his/her expense. Unsuitable earth shall be disposed of at the contractor's expense.
7. 
The engineer will call for density tests to be made whenever deemed necessary. The specified density will be the minimum allowed and the obtainment thereof will be entirely the contractor's responsibility.
8. 
Thickness of backfill layers will be determined by the coordination of test results with field performance and equipment used. The contractor will be expected to maintain established procedures except where unusual conditions arise. If greater than twelve-inch-thick compacted layers are used, the contractor shall hand excavate to the test level as directed by the engineer and then refill the test excavation with compacted backfill to the specified density.
9. 
All completed lines shall be returned, in the opinion of the engineer, as nearly as possible to original condition, including reseeding, resodding or repaving.
L. 
Drainage Maintenance. Trenches across roadways, driveways, walks, or other trafficways adjacent to drainage ditches or watercourses shall not be backfilled prior to completion of backfilling the trench on the upstream side of the trafficway, to prevent impounding water after the pipe has been laid. Bridges and other temporary structures required to maintain traffic across such unfilled trenches shall be constructed and maintained by the contractor. Backfilling shall be done so that water will not accumulate in unfilled or partially filled trenches. All material deposited in roadway ditches or other watercourses crossed by the line of trench shall be removed immediately after backfilling is completed and the section, grades, and contours of ditches or watercourses shall be restored to their original condition. Surface drainage shall not be obstructed longer than necessary.
M. 
Final Grading And Disposal Of Excess Excavated Materials.
1. 
General.
a. 
Except as otherwise indicated, all excess excavated materials shall be disposed of by the contractor away from the site of the work.
b. 
Pavement and pavement base material, excavated rock in excess of the amount permitted to be and actually installed in trench backfill, junk and debris encountered in excavation work, and other similar waste materials shall be disposed of away from the site of the work.
c. 
The disposal of waste and excess excavated materials, including hauling, handling, leveling and surfacing, shall be at the contractor's expense.
2. 
Uncompacted Backfill. Where uncompacted backfill is specified, excess earth from excavations, over and above that displaced by the pipe, shall be mounded directly over the pipe trench, in such manner that the earth will settle into the trench as natural consolidation occurs. Openings for natural drainage shall be provided. The mounded earth shall be graded to a smooth, uniform surface. That portion of the earth displaced by the pipe shall be uniformly and smoothly graded adjacent to the trench.
3. 
Other Types Of Backfill. For all types of backfill other than uncompacted, the contractor shall dispose of excess excavated material above the surface of the ground or subgrade of pavement walks, etc., unless otherwise directed. Where directed, the contractor shall leave all or a portion of the excess earth and grade smoothly along and adjacent to the trench in the manner prescribed by the engineer. If directed, he/she shall grade excess earth into adjacent low areas, fine grading and sloping to drain.
4. 
Final Grading.
a. 
Just prior to completion and acceptance of the project, the contractor shall final grade over all pipe trenches and around structures, filling in any places that may have settled during the period between construction of each line and the completion of the entire contract. Finished surface shall be bladed and aligned to a neat and uniform appearance.
b. 
Improved yards and lawns. Fine grade, suitable for seeding or sodding. Hand rake earth off grass in established lawn areas, unless directed to leave excess earth as outlined above.
5. 
Deficiency Of Backfill. Wherever there is a deficiency of material required to backfill to the specified surface or subgrade, the contractor shall furnish the necessary amount of suitable earth at his/her expense.
6. 
Restoration Of Disturbed Earth. The contractor shall restore all earth areas disturbed from the original condition by his/her operations. Restoration will be by seeding, fertilizing and mulching or by appropriate pavement and street repair.
N. 
Responsibility Of Contractor For Backfill Settlement.
1. 
The contractor shall be responsible financially and otherwise for:
a. 
All settlement of trench and other backfill which may occur from time of original backfilling until the expiration of one (1) year after the date of final payment for the entire contract under which the backfilling work was performed.
b. 
The refilling and repair of all backfill settlement and the repair or replacement to the original or a better condition of all pavement, top surfacings, driveways, walks, surface structures, utilities, drainage facilities and sod which may have been damaged as a result of backfill settlement or which have been removed or destroyed in connection with backfill replacement operations.
c. 
All damage claims or court actions against the owner for any damage directly or indirectly caused by backfill settlement.
2. 
The contractor shall make all necessary backfill replacements and repairs, or replacements appurtenant thereto, within thirty (30) days after notification by the owner or engineer. Upon the contractor's failure to do so, the owner may do, or have done, the necessary work and charge the cost to the contractor.
O. 
Barricades And Lights.
1. 
All streets, roads, highways and other public thoroughfares which are closed to traffic shall be protected by means of effective barricades on which shall be placed acceptable warning signs. Barricades shall be located at the nearest intersecting public highway or street on each side of the blocked section.
2. 
All open trenches and other excavations shall be provided with suitable barriers, signs, and lights to the extent that adequate protection is provided to the public. Obstructions such as material piles and equipment shall be provided with similar warning signs and lights.
3. 
All barricades and obstructions shall be illuminated by means of warning lights at night. All lights used for this purpose shall be kept on from sunset to sunrise. Materials stored shall be so placed, and the work at all times shall be so conducted, as to cause the minimum obstruction and inconvenience to the public.
4. 
All barricades, signs, lights and other protective devices shall be installed and maintained in conformity with applicable statutory requirements, and where within highway rights-of-way, as required by the authority having jurisdiction hereover.
P. 
Maintenance Of Traffic. The contractor shall conduct his/her work so as to interfere as little as possible with public travel, whether vehicular or pedestrian; whenever it is necessary to cross, obstruct, or close roads, driveways, and walks, whether public or private, the contractor shall at his/her own expense provide and maintain suitable and safe bridges, detours, or other temporary expedients for the accommodation of public and private travel and shall give reasonable notice to owners of private drives before interfering with them; provided, however, that such maintenance of traffic will not be required at any point where the contractor has obtained permission from the owner and tenant of private property, or from the authority having jurisdiction over the public property involved, to obstruct traffic at any designated point thereon and for the duration of whatever period of time as may be agreed upon.
[R.O. 1993 § 705.090; Ord. No. 99-2405 § 1, 10-26-1999]
A. 
Quality Control.
1. 
Supervision. Provide full-time superintendent on the project who is qualified and experienced in testing procedures. Superintendent shall direct all work in connection with the testing.
2. 
Codes And Standards. Testing shall comply with AWWA C600-77 Section 4 - Hydrostatic Testing.
B. 
Submittals.
1. 
Test reports. Submit certified copies of test reports on each section of pipe tested.
C. 
Execution — General.
1. 
The contractor shall provide all necessary piping connections, pumping equipment, pressure gauges, flow meters, and other equipment as necessary for the required test.
2. 
The owner will furnish at the nearest available source all water required for filling the lines and making the required test. The pipe shall be filled with water at a velocity not to exceed one (1) foot per second. Air shall be expelled from pipeline during filling.
3. 
Where practical, pipelines shall be tested in lengths of not more than one thousand five hundred (1,500) feet.
4. 
All pipe, fittings and other materials found to be defective shall be removed and replaced with new materials by the contractor.
5. 
All lines that fail to meet tests shall be repaired and retested as necessary until test requirements are complied with.
6. 
During the contract or one (1) year guarantee period, testing before backfilling in no way relieves the contractor of the responsibility of repairing leaks which become evident after the main is put into service.
D. 
Testing After Backfill.
1. 
If the contractor chooses to test after backfilling, he/she shall comply with all requirements shown for testing before backfilling, except that the duration of the test shall be for four (4) hours. All surface indications of leaks shall be immediately corrected even though the total leakage is less than allowed.
2. 
In the event the leakage is more than permissible, the system shall be corrected as found necessary to bring it within the allowed limits. It shall be subject to as many two-hour tests as necessary to obtain the desired result. If a section of pipe fails the two-hour test, then a four-hour test may be required by the project engineer.
E. 
Testing Before Backfill.
1. 
All backup blocks and anchors shall have been in place at least forty-eight (48) hours prior to testing.
2. 
The test pressure shall be maintained for two (2) hours or longer as is necessary for time to inspect the pipeline for visible leaks and as is required to obtain a reasonable time for leakage measurement.
3. 
Pressure testing prior to backfill is discouraged due to safety concerns.
F. 
Pressure Test.
1. 
Test Pressure.
a. 
All newly installed piping shall be hydrostatic pressure tested at fifty (50) psi or two and one-half (2 1/2) times the working pressure of the system.
b. 
Pressure shall not vary by more than plus or minus five (5) psi.
c. 
Pressurization. Each valved section of pipe shall be filled with water slowly and the specified test pressure, based on the elevation of the lowest point of the line or section under test and corrected to the elevation of the test gage, shall be applied by means of a pump connected to the pipe. Test shall begin after pipe is filled with water and the air expelled.
2. 
Air Removal. Before applying the specified test pressure, air shall be expelled completely from the pipe, valves, and hydrants. If permanent air vents are not located at all high points, the contractor shall install corporation cocks at such points so that the air can be expelled as the line is filled with water. After all the air has been expelled, the corporation cocks shall be closed and the test pressure applied. At the conclusion of the pressure test, the corporation cocks shall be removed and plugged, or left in place at the discretion of the owner.
3. 
Examination. All exposed pipe, fittings, valves, hydrants, and joints shall be examined carefully during the test. Any damage or defective pipe, fittings, valves, or hydrants that are discovered following the pressure test shall be repaired or replaced with sound material, and the test shall be repeated until it is satisfactory to the owner.
G. 
Leakage Test.
1. 
General. A leakage test shall be conducted concurrently with the pressure test.
2. 
Leakage Defined. "Leakage" shall be defined as the quantity of water that must be supplied into the newly laid pipe, or any valved section thereof, to maintain pressure within five (5) psi of the specified test pressure after the air in the pipeline has been expelled and the pipe has been filled with water.
3. 
Allowable Leakage.
a. 
No pipe installation will be accepted if the leakage is greater than that determined by the following formula:
L
=
SD(p)1/2
133,200
in which L is the allowable leakage, in gallons per hour; S is the number of pipelines tested in feet; D is the nominal diameter of the pipe, in inches; and P is the average test pressure during the leakage test, in pounds per square inch gage.
b. 
When testing against closed metal-seated valves, an additional leakage per closed valve of 0.00078 gallons per hour per inch of nominal valve size shall be allowed.
c. 
All visible leaks shall be repaired regardless of the amount of leakage.
4. 
Acceptance Of Installation. Acceptance shall be determined on the basis of allowable leakage. If any test of pipe laid discloses leakage greater than that specified, the contractor shall, at his/her own expense, locate and repair the defective material until the leakage is within the specified allowance.
[R.O. 1993 § 705.100; Ord. No. 99-2405 § 1, 10-26-1999]
A. 
Quality Assurance. Compliance with specifications:
1. 
Furnish proof acceptable to the owner, when called for during construction, that all sewer pipe installed equal or exceed all requirements specified for this work.
2. 
If such proof is not submitted or is unacceptable, replace all such items to conform to the specifications, and repair any damage, all at no cost to the owner.
B. 
Submittals.
1. 
Shop Drawings. Submit shop drawings to the engineer within thirty (30) days after award of contract in accordance with Section 01340, showing all materials to be furnished and installed.
2. 
As-Built Drawings. During progress of the work, maintain an accurate record of all changes made in the sewer pipe installation from the layout and materials shown on the approved shop drawings.
C. 
Products.
1. 
Pipe Material.
a. 
Pipe material used on the project is designated on the plans as ductile iron or sewer pipe. "Sewer pipe" is defined as including vitrified clay pipe, ABS plastic sewer pipe, PVC gravity sewer pipe, PVC pressure sewer pipe, ductile iron pipe, or concrete pipe.
b. 
Sewer pipe which is fifteen (15) inches in diameter or smaller may be vitrified clay pipe (VCP), ABS plastic sewer pipe, or PVC gravity sewer pipe as specified. The four-inch house service lines may be VCP, PVC, or ABS pipe.
c. 
Bidders shall designate pipe material to be used on the proposal form.
d. 
The force main pipe shall be PVC or DIP as detailed.
2. 
Pipe Joints.
a. 
Pipe joints on new construction shall be standard joints for pipe material used. Where joining new pipe to existing old pipe twelve-inch diameter and smaller at various sewer replacements, and joining pipes of different material, rubber couplings shall be used. Couplings shall be heavy duty rubber with two (2) stainless steel clamps and one (1) stainless steel shear ring. Transition bushings of proper size shall be used for joining DIP to VCP or PVC pipe.
b. 
For joining old to new pipe in sizes larger than twelve-inch diameter, where rubber couplings described above are not available, use standard concrete collar as detailed.
3. 
Sewer Pipe.
a. 
Vitrified Clay Pipe.
(1) 
Pipe and fittings shall be in accordance with the following standard specifications:
(a) 
Standard Strength: ASTM C13.
(b) 
Extra Strength: ASTM C200 or ASTM C700.
(c) 
Testing: ASTM C301.
(2) 
Vitrified clay pipe shall be plain end pipe conforming to dimensional and strength requirements of ASTM C200, latest revision. Pipes shall be joined using a compression sleeve manufactured to conform to ASTM specification, C425-86, Type B, latest revision.
b. 
Plastic Gravity Sewer Pipe (PVC).
(1) 
PVC sewer pipe and fittings shall meet the requirements of ASTM specification D3034 (SDR 35), Type PSM polyvinyl chloride (PVC) sewer pipe and fittings.
(2) 
All pipe and fittings shall be made from PVC components as defined and described in ASTM D1784 for rigid polyvinyl chloride compounds and chlorinated poly compounds.
(3) 
Gaskets shall meet the requirements of ASTM F477.
c. 
Force Main Pipe (PVC Pressure Pipe).
(1) 
PVC pipe shall conform to all requirements of commercial standard CS-256-63, ASTM D2241-84, latest revision, and be pressure rated at one hundred sixty (160) psi with standard dimension ratio (SDR) of 26 for barrel, bell or coupling. Pipe shall bear the National Sanitation Foundation seal of approval and will comply with the requirements for Type 1, Grade 1 (PVC 1120) of ASTM D1784-68, latest revision. Certificate of compliance shall be furnished with material.
(2) 
Joints. All joints of both pipe and fittings shall comply with ASTM specification D3139, Joints for Plastic Pressure Pipes Using Flexible Elastomeric Seals. Joint bells shall be formed integrally with the pipe or fitting and shall have a raceway or groove which is specially formed to accept and retain the gasket. Pipe spigots shall be beveled and shall have insertion stop marks. Qualification tests of the joint design shall result in no leakage under various laboratory test conditions of joint alignment and pressure at two and one-half (2 1/2) times rated pressure.
(3) 
Gaskets. Gaskets shall be molded from a high-grade, properly vulcanized, elastomeric compound consisting of either a basic natural or synthetic rubber. Gaskets shall be marked to show IPS for pressure-rated pipe, nominal pipe size, manufacturer's identification, and year of manufacture. Gaskets shall be color striped on the side of the gasket that faces the open bell to facilitate proper installation. Gaskets shall comply with the requirements of ASTM specification F477, Elastomeric Seals (Gaskets) for Joining Plastic Pipes.
(4) 
Lubricant. Lubricant shall be suitable for use at temperatures from five degrees Fahrenheit (5° F.) to one hundred twenty degrees Fahrenheit (120° F.) [minus fifteen degrees Celsius (-15° C.) to fifty degrees Celsius (50° C.)]. It shall have no deteriorating effect on the gasket or pipe material. It shall be non-toxic and not support the growth of bacteria and shall be water soluble. Containers shall be labeled with the manufacturer's name and identified as PVC pipe joint lubricant. Each lubricant container shall have printed instructions for usage and joint assembly.
(5) 
Fittings. Fittings four (4) inches and smaller shall be PVC with push-on joints. Fittings six (6) inches and larger shall be cast iron with mechanical joint ends conforming to ANSI 21.11 except gaskets shall be duck tip transition type.
d. 
Ductile Iron Pipe.
(1) 
Ductile iron pipe shall be manufactured and tested in accordance with ASA specification A21.51-1976. Iron shall be 60/42/10.
(2) 
Pipe for sewers and force mains shall be bituminous coated inside and outside with no cement lining unless otherwise approved by the engineer in writing.
(3) 
Thickness class shall be Class 50 unless noted otherwise on the plans.
(4) 
Pipe joints shall be boltless gasketed type, American "Fastite," Clow "Bell-Tite," U.S. "Tyton" or equal.
(5) 
Fittings shall be short body mechanical joint cast iron, unless shown otherwise on the plans. Manufacturing and testing shall be in accordance with ASA specification A21.10. Iron shall be in accordance with ASTM A48. Thickness shall be in accordance with AWWA C100, Class D. Fittings shall be bituminous coated inside and out.
e. 
ABS Pipe.
(1) 
ABS composite pipe shall be made from virgin Acrylonitrile Butadiene-Styrene material. This material shall be Type I, Grade I, Type I, Grade II, Type IV, Grade I and shall conform to ASTM specification 1788-62-T. ABS composite pipe shall consist of two (2) concentric thermoplastic tubes integrally braced across the annulus with resultant annular space filled to provide continuous support between inner and outer tubes. The component between the ABS shall be of Portland cement lightweight concrete, other inert filler exhibiting the same degree of performance which essentially fills the truss annulus to form a composite pipe to meet the requirements of this specification.
(2) 
Size, physical requirements, the dimensions, the method of test, the length, the testing procedures and marking procedures for this pipe shall conform with ASTM specification D2680-68T.
(3) 
Couplings shall be of solid-wall sleeve type for chemical weld to the truss pipe.
(4) 
The ends of each section of pipe shall be sealed to prevent water saturation.
f. 
PVC Ribbed Gravity Sewer Pipe. Pipe and fittings shall be Contech A-2000 PVC sewer pipe conforming to ASTM F949 or Ultra-Rib PVC sewer pipe conforming to ASTM F794. Pipe material shall be PVC having a cell classification of 12454-B, 12454-C, or 13364-B as defined in ASTM D1784. Pipe and fittings shall have a smooth interior. Pipe joints shall be an integral bell and spigot with rubber sealing gasket.
g. 
Reinforced Concrete Sewer Pipe.
(1) 
Concrete sewer pipe shall comply with the ASTM C76 latest edition. Wall thickness shall not be less than Wall B, Class IV or V.
(2) 
Material.
(a) 
Fine Aggregate: Clean natural sand, ASTM C33. Artificial or manufactured sand will not be acceptable.
(b) 
Cement: ASTM C150, containing not more than five percent (5%) triacalcium aluminate.
(c) 
Gaskets: ASTM C361, Sections 6.9.1 except polymer shall be synthetic rubber. Natural rubber will not be acceptable.
(3) 
Reinforcement.
(a) 
Circumferential reinforcement shall be full-circle type. Elliptical or part-circle reinforcement will not be acceptable.
(b) 
Longitudinal steel shall be spaced uniformly around the pipe and shall consist of at least eight (8) continuous or lap-spliced wires or bars in each cage.
(c) 
All reinforcing shall have at least a one-inch concrete cover (no minus tolerance). Pipe with less than one-inch cover at any point shall be rejected.
(d) 
Minimum length of lap splices of welded wire fabric shall conform to ASTM C76 latest edition.
(e) 
Extra joint reinforcement shall be provided as required due to the design joint load as shown in this specification. The end circumferential bar shall be placed one (1) inch minimum from the face of the joint.
(4) 
Proof Of Design Tests.
(a) 
The design of each class of concrete pipe shall be verified by tests conducted on representative specimens. Test shall be performed on pipe manufactured for this project. Certified test reports shall be submitted.
(b) 
The proof of design tests shall be:
THREE EDGE BEARING: Each three edge bearing test shall determine the load required to produce:
(c) 
Incipient cracking (first visible crack).
(d) 
First 0.01 inch crack.
(e) 
Ultimate destruction of the pipe.
(f) 
Conduct of three (3) edge bearing tests shall be as specified in ASTM C497.
(5) 
Delivery. No concrete sewer pipe shall be delivered to the site of work until concrete control cylinders representing such pipe have attained a compressive strength of at least eighty percent (80%) of the specified minimum twenty-eight-day strength.
4. 
Valves.
a. 
Gate Valve.
(1) 
Gate valves shall be AWWA C509 with cast iron body, bronze trim, "0" ring packed, resilient seat, non-rising stem valves for two hundred (200) psi.
(2) 
Valves two (2) inches and smaller shall be solid brass.
(3) 
Buried valves shall be furnished with two-inch square operating nut and cast iron, two-piece valve box with cover to finished grade.
b. 
Plug Valve.
(1) 
Plug valve shall be Dezurik Eccentric, Series 100 or equal. Plug valves shall have ends of standard mechanical joints conforming to ASA specification A21.11.
(2) 
Materials shall be:
(a) 
Body: semisteel.
(b) 
Plug: rubber faced.
(c) 
Bearing: stainless steel.
(d) 
Packing: (Buna Vee).
(3) 
Actuators. Operating nut actuators with floor boxes shall be furnished with tee wrench.
c. 
Air Release Valve.
(1) 
Air release valves shall be APCO Series 400, five-sixteenths-inch orifice.
(2) 
Combination sewage air and vacuum valve shall be APCO Series 400 SAVV Model 401, two-inch inlet and one-inch outlet.
d. 
Check Valve.
(1) 
Check valves in sewage force main shall be (Dresser) M & H or equal spring-loaded, swinging-disc-type with cast iron body and disc, bronze mounted, rubber faced. Valves shall be rated for one hundred seventy-five (175) psi working pressure.
(2) 
Buried Check Valves. Buried check valves in sewage force main shall be (Dresser) M & H or equal standard swinging-disc-type with cast iron body, bronze mounted, rubber-faced full opening. Valves shall be rated for one hundred seventy-five (175) psi working pressure.
5. 
Locator Wire. No. 12, single-strand, insulated copper wire is to be installed in the trench with the main and looped around all valves. Reference the project plans for a detail of atypical locator wire steel riser post.
D. 
Execution.
1. 
Handling.
a. 
Pipe and accessories shall be handled in a manner that will ensure their installation in the work in sound, undamaged condition. Equipment, tools and methods used in unloading, reloading, hauling and laying pipe and fittings shall be such that they are not damaged. Hooks inserted in ends of pipe shall have broad, well -padded contact surfaces.
b. 
Pipe having premolded joint rings shall be handled in such a manner that no weight, including the weight of the pipe itself, will bear on or be supported by the spigot rings at any time. Care shall be taken to avoid dragging the spigot ring on the ground or allowing it to come in contact with gravel, crushed stone, rocks, or other hard objects. Joint rings which have been damaged in any way will not be accepted and shall not be incorporated in the work.
2. 
Laying Pipe.
a. 
Pipe shall be protected from lateral displacement by means of pipe embedment material installed as provided in trench backfill specification. Under no circumstances shall pipe be laid in water, and no pipe shall be laid under unsuitable weather or trench conditions.
b. 
When jointed in the trench, the pipe shall form a true and smooth line. Pipe shall not be trimmed except for closures, and pipe not making a good fit shall be removed. Permissible defects shall be placed in the top of the pipe.
c. 
Unless otherwise approved by the engineer, the laying of pipe shall begin at the lowest point, and the pipe shall be installed so that the spigot ends point in the direction of flow.
d. 
Pipe which is a part of a gravity sewer line shall be aligned and constructed to grades as shown on the plans.
e. 
Pipelines or runs intended to be straight shall be laid straight.
f. 
During installation each pipe and fitting shall be inspected for defects. All defective, damaged, or unsound pipe and fittings shall be rejected and removed from the site of the work.
3. 
Alignment And Grade. All pipe shall be laid straight between changes in alignment and at a uniform grade between changes in grade. All lines shall be laid so that each section between manholes will lamp.
4. 
Jointing.
a. 
Factory-Molded Plastic Joints. All instructions and recommendations of the pipe manufacturer shall be observed and followed. All joint surfaces shall be lubricated with the lubricant furnished by the pipe manufacturer immediately before the joint is completed.
b. 
Boltless Gasketed Joints. All instructions and recommendations of the pipe manufacturer, relative to gasket installation and other jointing operations, shall be observed and followed by the contractor. All joint surfaces shall be lubricated with heavy vegetable soap solution immediately before the joint is completed.
c. 
Mechanical Joints. Mechanical joints shall be carefully assembled in accordance with the manufacturer's recommendations. If effective sealing is not obtained, the joint shall be disassembled, thoroughly cleaned and reassembled. Overtightening bolts to compensate for poor installation practice will not be permitted.
d. 
Coupling Pipe. Couplings shall be chemically welded to the pipe with one (1) end, factory applied. The coupling and pipe end to be chemically welded in the trench shall be thoroughly cleaned after it is in the trench and a primer and cement shall be applied to both the coupling and the end of the pipe. This shall be done in accordance with the manufacturer's instructions. The pipe shall be thoroughly shoved into the coupling and then turned within the coupling one-fourth (1/4) turn to ensure complete contact between cement, pipe, and coupling.
e. 
Concrete Pipe Joints.
(1) 
Joints for reinforced concrete pipe shall be rubber and concrete. Rubber and concrete joints shall be formed entirely of concrete, with the spigot grooved to receive an O-ring-type rubber gasket. Joints shall conform to Section 8 of ASTM C361.
(2) 
Each joint shall be designed and reinforced to withstand the gasket compression, plus a differential load across the joint equal to four thousand (4,000) pounds per foot of internal diameter. In resisting gasket compression, the concrete in the bell shall not be stressed higher than one hundred fifty (150) psi by the combined tension and diagonal tension stresses. The end of the last circumferential reinforcing rod in both the bell and the spigot ends shall be welded to form a full circle.
(3) 
In computing the stresses in the bell, a gasket pressure of one hundred fifty (150) pounds per linear inch shall be used. The gasket size, compression, and stretch shall be selected to limit the gasket pressure to one hundred fifty (150) pounds per linear inch with a gasket hardness of forty-five (45).
(4) 
Joint design details shall be submitted for acceptance together with data or test results verifying the adequacy of joint design and gasket. Historical test reports will be adequate for proof-of-design.
(5) 
Rubber gaskets shall conform to the requirements of Section 5.9.1 of ASTM C361, shall have a circular cross section, and shall have a hardness when measured by ASTM D2240, Type A Durometer of plus forty (40) or minus five (5).
5. 
Cutting Pipe. Cutting of pipe shall be done in a neat manner, without damage to the pipe or to the lining therein. Pipe cuts shall be smooth, straight and at right angles to the pipe axis. All cutting of pipe shall be done with mechanical pipe cutters of an approved type except that in locations where the use of mechanical cutters would be difficult or impracticable, existing pipe may be cut with diamond point chisels, saws, or other tools which will cut the pipe without damaging impact or shock.
6. 
Cleaning.
a. 
The interior of all pipe shall be cleaned of all foreign matter before being installed and shall be kept clean until the work has been accepted. All lumps, blisters and excess coating shall be removed from exterior spigot and interior bell surfaces. Such surfaces shall be wire brushed and wiped clean, dry, and free from oil and grease before placing the spigot in the bell. All joint contact surfaces shall be kept clean until the jointing is completed.
b. 
Every precaution shall be taken to prevent foreign material from entering the pipe while it is being installed. No debris, tools, clothing, or other materials shall be placed in the pipe.
c. 
Whenever pipe laying is stopped, the open end of the line shall be sealed with a watertight plug.
7. 
Testing — Sewer Force Main And Pressure Piping.
a. 
General.
(1) 
The contractor shall provide all necessary piping connections, pumping equipment, pressure gauges, flow meters, and other equipment as necessary for the required test.
(2) 
All pipe, fittings and other materials found to be defective shall be removed and replaced with new materials by the contractor.
(3) 
All lines that fail to meet tests shall be repaired and retested as necessary until test requirements are complied with.
(4) 
During the contract or one-year guarantee period, testing before backfilling in no way relieves the contractor of the responsibility of repairing leaks which become evident after the main is put into service.
b. 
Testing After Backfill.
(1) 
If the contractor chooses to test after backfilling, he/she shall comply with all requirements shown for testing before backfilling, except that the duration of the test shall be for twenty-four (24) hours. All surface indications of leaks shall be immediately corrected even though the total leakage is less than allowed.
(2) 
In the event the leakage is more than permissible, the system shall be corrected as found necessary to bring it within the allowed limits. It shall be subject to as many twenty-four-hour tests as necessary to obtain the desired result.
c. 
Testing Before Backfill.
(1) 
All backup blocks and anchors shall have been in place at least forty-eight (48) hours prior to testing.
(2) 
The test pressure shall be maintained for two (2) hours or longer as is necessary for time to inspect the pipe line for visible leaks and as is required to obtain a reasonable time for leakage measurement.
d. 
Hydrostatic Leakage Test. (Warning: The testing methods described in this Section are specific for water pressure testing. These procedures should not be applied for air pressure testing because of the serious safety hazards involved.)
(1) 
Test Restrictions.
(a) 
Test pressure shall not be less than one and one-fourth (1 1/4) times the working pressure at the highest point along the test section. If pump is part of system, then pump shutoff head should be considered.
(b) 
Test pressure shall not exceed pipe or thrust-restraint design pressures.
(c) 
The hydrostatic test shall be of at least two-hours' duration.
(d) 
Test pressure shall notary by more than ± 5 psi (34.5 kPa) for the duration of the test.
(e) 
Valves shall not be operated in either direction at a differential pressure exceeding the rated valve working pressure. Use of a test pressure greater than the rated valves pressure can result in trapped test pressure between the gates of a double-disc gate valve. For tests at these pressures, the test setup should include a provision, independent of the valve, to reduce the line pressure to the rated valve pressure on completion of the test. The valve can then be opened enough to equalize the trapped pressure with the line pressure, or fully opened if desired.
(f) 
The test pressure shall not exceed the rated pressure of the valves when the pressure boundary of the test section includes closed, resilient-seated gate valves or butterfly valves.
(2) 
Pressurization. After the pipe has been laid, all newly laid pipe or any valved section thereof shall be subjected to a hydrostatic pressure of at least one and one-half (1 1/2) times the working pressure at the point of testing. Each valved section of pipe shall be slowly filled with water, and the specified test pressure (based on the elevation of the lowest point of the line or section under test and corrected to the elevation of the test gauge) shall be applied by means of a pump connected to the pipe. Valves shall not be operated in either the opening or closing direction at differential pressures above the rated pressure. It is good practice to allow the system to stabilize at the test pressure before conducting the leakage test.
(3) 
Air Removal. Before applying the specified test pressure, air shall be expelled completely from the section of piping under test. If permanent air vents are not located at all high points, corporation cocks shall be installed at such points so that the air can be expelled as the line is filled with water. After all the air has been expelled, the corporation cocks shall be closed and the test pressure applied. At the conclusion of the pressure test, the corporation cocks shall be removed and plugged or left in place as required by the specifications.
(4) 
Examination. All exposed pipe, fittings, valves, hydrants and joints shall be examined carefully during the test. Any damage or defective pipe, fittings, valves, hydrants, or joints that are discovered following the pressure test shall be repaired or replaced with sound material, and the test shall be repeated until satisfactory results are obtained.
(5) 
Leakage Defined. "Leakage" shall be defined as the quantity of water that must be supplied into the newly laid pipe or any valved section thereof to maintain pressure within five (5) psi (34.5 kPa) of the specified test pressure after the pipe has been filled with water and the air has been expelled. Leakage shall not be measured by a drop in pressure in a test section over a period of time.
(6) 
Allowable Leakage. No pipe installation will be accepted if the leakage is greater than that determined by the following formula:
In inch-pound units,
L
=
SD√P
133,200
Where:
L
=
allowable leakage, in gallons per hour
S
=
length of pipe tested, in feet
D
=
nominal diameter of the pipe, in inches
P
=
average test pressure during the leakage test, in pounds per square inch (gauge)[1]
[1]
Editor's Note: The Nominal Pipe Diameter Table is included as an attachment to this Chapter.
(7) 
Acceptance Of Installation. Acceptance shall be determined on the basis of allowable leakage. If any test of pipe laid discloses leakage greater than that specified, the contractor shall, at his/her own expense, locate and repair the defective material until the leakage is within the specified allowance.
8. 
Deflection Text PVC Pipe (Gravity Sewer Pipe).
a. 
Deflection tests shall be performed on all flexible pipe. The tests shall be run not less than thirty (30) days after final backfill has been placed. No pipe deflection shall exceed five percent (5%).
b. 
The deflection test shall be run using a rigid ball or mandrel with a diameter equal to ninety-five percent (95%) of the inside diameter of the pipe.
c. 
The contractor is responsible for providing the personnel and equipment necessary to run the tests. The project representative or inspector shall observe test and record testing information in the permanent record.
9. 
Wye Branches And Stub Lines.
a. 
At locations designated during construction, the contractor shall install four-inch wyes and riser pipes or stub lines. Wye branches shall be so installed that the lower lip of the branch is no more than two (2) inches below the outside top of the pipe.
b. 
Stub lines shall be the same size and type of pipe as the wye branch or tee. The end of the stub line shall be closed by means of a suitable stopper held in place by joint sealing compound.
c. 
The stub lines shall be laid to the line and grade set by the engineer or construction representative. The stub lines on this project shall extend to the property line of the house being served.
d. 
The ends of the stub lines shall be marked by a one-inch-by-two-inch wooden strip extending from the end of the pipe to within one (1) foot of the top of the surface of the ground. Markers shall be securely anchored and maintained in proper position until backfill has been completed. Markers shall be referenced to at least three (3) points of permanent reference and tie distances recorded. If markers are not referenced at the time of installation and records maintained by the contractor, he/she shall uncover markers and provide references.
e. 
Wyes and fittings shall be installed in lines in accordance with pipe manufacturer recommendations.
f. 
Saddle connection will be considered. Written approval from the engineer is required.
10. 
Pipe Embedment And Trench Backfill. All pipe embedment and trench backfill material shall be as specified in Section 02221 and the construction plans.
11. 
Pipe Connection To Manhole — General.
a. 
Connection at manhole walls shall be made by O-ring-type couplings set in the wall and having a manhole water stop assembly between the coupling and the manhole wall. The exact type of O-ring seal shall be as recommended by the pipe manufacturer.
b. 
Connection of pipe to an existing manhole shall be done with a flexible pipe to manhole connector. The connection shall be Inserta-Lok connector as manufactured by A-Lok Products, Inc., Tullytown, Pennsylvania, or other approved equal.
12. 
Water Main Location — Avoidance Of Possible Contamination — MoDNR.
a. 
Water Mains Near Sewers.
(1) 
Horizontal Separation. A water main shall be laid at least ten (10) feet horizontally from any existing or proposed drain or sewer line. Should local conditions prevent a lateral separation of ten (10) feet, a water main may be laid closer than ten (10) feet to a storm or sanitary sewer line, provided that the water main is laid in a separate trench or on an undisturbed earth shelf located on one (1) side of the sewer line and at such an elevation that the bottom of the water main is at least eighteen (18) inches above the top of the sewer line.
(2) 
Vertical Separation. Where water mains must cross over sewers, storm drains, or sanitary sewers, the water main must be laid at such an elevation that the bottom of the water main is at least eighteen (18) inches above the top of the sewer, and a full length of water main pipe must be centered over the sewer to be crossed so that the joints will be equally distant from the sewer and as remote therefrom as possible. This vertical separation must be maintained for that portion of the water main located within ten (10) feet horizontally of any sewer or sewer lines that it crosses, said ten (10) feet to be measured as the normal distance from the water main to the sewer.
(3) 
Special Conditions. Where conditions prevent the minimum vertical separation as set forth above from being maintained or where it is necessary for the water main to pass under a sewer line, the water main must be encased with the same type of pressure pipe, which must extend on each side of the crossing until the normal distance from the water main to the sewer is at least ten (10) feet. In making such crossings, a full length of pipe must be centered over or under the sewer to be crossed so that the joints will be equally distant from the sewer and as remote therefrom as possible.
13. 
Sewers In Relation To Streams. Location of sewers on streams:
a. 
Cover Depth. The top of all sewers entering or crossing streams shall be at a sufficient depth below the natural bottom of the stream bed to protect the sewer line. In general, the following cover requirements must be met: One (1) foot of cover is required where the sewer is located in rock; three (3) feet of cover is required in other material. Less cover will be approved only if the proposed sewer crossing will not interfere with the future improvements to the stream channel.
b. 
Aerial Crossing. Support shall be provided for all joints in pipes utilized for aerial crossings. The supports shall be designed to prevent frost heave, overturning and settlement. The bottom of the pipe should be placed no lower than the elevation of the fifty-year flood.
[R.O. 1993 § 705.110; CC 1988 § 27-49]
A. 
All highway and railroad crossings shall be at the locations shown on the plans. The contractor shall be required to pay all fees and obtain all permits required in conjunction with the crossing. The contractor shall comply with all requirements and specifications of the agency involved.
B. 
Highway and railroad crossings shall consist of the carrier pipe or conduit, encasement, boring, bracing, sheeting, etc., as may be required for a complete installation.
C. 
Should open cutting of the trench be allowed, the contractor shall still be required to comply with the requirements and specifications of the affected agency.
[R.O. 1993 § 705.120; CC 1988 § 27-50]
The contractor shall furnish all necessary equipment and labor to provide for removal of water, ice or snow which could interfere with the progress of work. Should a leak or spring be encountered, the contractor shall take any steps as deemed necessary by the City or designated City Official to remedy the problem.
[R.O. 1993 § 705.130; CC 1988 § 27-51]
A. 
All existing facilities (roadways, utilities, foundations, etc.) which are adjacent to the new construction shall be protected and preserved. Should damage occur to an existing facility, it shall be promptly repaired.
B. 
Where new construction interferes with the operation of an existing facility, the contractor shall make provisions for maintaining continuous service. All provisions shall be subject to approval by the City or designated City Official.
C. 
The contractor shall give reasonable notice to any utility company or to owners of property when it appears damage is possible by the execution of work.
[R.O. 1993 § 705.140; CC 1988 § 27-52]
The contractor shall be responsible (whether directly or indirectly) for all construction staking. Stakes shall be set at regular intervals [generally twenty-five (25) feet], and to any convenient offset from the center line of pipe. Except in unusual circumstances, the offset shall not exceed ten (10) feet and shall be subject to the approval by the City or designated City Official.
[R.O. 1993 § 705.150; CC 1988 § 27-53]
A. 
Pipe shall be laid true to grade using a laser beam or a grade rod with an iron heel for the invert.
B. 
Should the grade rod be used, a minimum of three (3) batter boards shall be set at the necessary offset. A line shall be drawn taut over the batter boards and the rod shall have a means for measuring from the line to the invert.
C. 
The alignment of all pipes between manholes shall be true to line and grade and shall reflect the full bore of the pipe. Each pipe section shall be centered into the adjacent pipe section at each joint.
D. 
The pipe bell shall not rest on the bedding material. The bedding material shall be excavated at each bell such that the weight of the pipe is distributed evenly along the entire length of the pipe barrel.
E. 
A service connection shall be provided for each house or vacant lot along the sewer line. Each service connection shall be four (4) inches in diameter (minimum) and the exact location from the downstream manhole shall be recorded. A copy of the service connection locations shall be given to the City or designated City Official. Should the City or designated City Official deem it necessary, the contractor shall furnish and install additional service connections at the locations designated by the City or designated City Official.
F. 
The service lateral shall extend from the sewer line to the street right-of-way line or to the utility easement line and shall be capped or plugged. The depth of the lateral lines shall be such that a minimum slope of one-fourth (1/4) inch per twelve (12) inches can be maintained from the dwelling or connection.
G. 
A two-inch-by-six-inch wood plank shall extend from the cap of the service lateral vertical to within six (6) inches of grade.
[R.O. 1993 § 705.160; Ord. No. 99-2405 § 1, 10-26-1999]
A. 
Workmanship.
1. 
Supervision. Provide full-time supervisor trained and familiar with the work to be undertaken.
2. 
Workmen. Provide workmen qualified with every phase of work to be undertaken, including concrete reinforcement, placement, and finish.
B. 
Product Handling.
1. 
Protection. Use all means necessary to protect material prior to, during and after installation.
2. 
Replacement. Replace all material damaged during course of project.
C. 
Products.
1. 
Manhole Materials Of Construction.
a. 
General. At the option of the contractor, standard manholes may be constructed with cast-in-place concrete bases or precast concrete (developed) bases.
b. 
Materials.
(1) 
Cast-In-Place Concrete. Materials, handling, forms, finishing, curing, and other work as specified in the concrete section.
(2) 
Precast Concrete. Circular, uniform outside diameter; ASTM C478, with a minimum wall thickness of five (5) inches. Minimum access diameter shall be twenty-two (22) inches.
(3) 
Precast Concrete Adjusting Rings. Circular, ASTM C478, with Shear Keys.
(4) 
Non-Shrink Grout. Gifford-Hill "Supreme," L & M "Crystex," Master Builder Masterflow 713 Grout, or U.S. Grout "Five Star" or equal.
(5) 
Resilient Manhole Pipe Connectors. A-LOK manhole pipe connector or approved equal to be used on connections up to ten degrees (10°) on seventeen and one-half percent (17.5%). For connection with grades greater than ten degrees (10°) or seventeen and one-half percent (17.5%), a Z-LOK manhole pipe connector or approved equal is to be used.
(6) 
A flexible gasket shall be used between each section ring of the manhole and cover, such as RAM-NEK preformed plastic gasket, as manufactured by K.T. Snyder Company of Houston, TX, or equal.
c. 
Manhole Frames And Covers. Type I and Type II manhole frames and covers shall be as approved by the City from time to time.
d. 
Manhole Steps. Step shall be ASTM C478 Plastic Steps, M. A. Industries Polypropylene Plastic Steps No. PS-2-PF, or equal.
2. 
Sewage Air Release Valves.
a. 
Sewage air release valves shall have an elongated body and be designed to operate (open) while pressurized allowing entrained air in a sewage force main line, sewage pump, or waste water system to escape thru the air release orifice without spillage or spurt. After entrained air escapes through the air release orifice, the valve orifice shall be closed by a needle mounted on compound lever mechanism, energized by a concave float and prevent media from escaping. The air release orifice will then remain closed until more air accumulates and the opening cycle repeats automatically. The internal compound lever mechanism shall be stainless steel to prevent corrosion.
b. 
The internal linkage shall be fitted with a stem having a stainless steel concave float threaded onto the opposite end. The concave float shall hang inside the valve body, slightly above the inlet thirteen (13) inches from the lever mechanism, thereby maintaining an air gap between the mechanism and the waste media. The valve body and float shall withstand five hundred (500) psi shell test pressure. The valve inlet shall be two (2) inches, N.P.T. APCO Model 400, or approved equal.
3. 
Waterproofing.
a. 
Waterproofing shall be Anchor Tite Uniseal 1600 Non-fibered Coating or equal.
b. 
Total thickness shall be one-eighth (1/8) inch wet film.
4. 
Air Release Valve Structure.
a. 
Structure shall be standard precast concrete sewer pipe meeting ASTM C-76.
b. 
Cover shall be cast iron manhole ring and cover Deeter Foundry or equal No. 1170.
D. 
Execution — General.
1. 
Standard manholes and special manholes shall be constructed complete with covers in accordance with the details shown on the drawings. Standard manholes above the foundations, unless otherwise required by the plans, shall be constructed of precast concrete sections specially cast for use in manholes. Special manholes shall be constructed of monolithic concrete as shown on the plans. Concrete and reinforcing steel shall conform to the specifications for concrete, Section 03300. Precast concrete sections shall be in compliance with ASTM C478 specifications, with joints filled with mastic compound.
2. 
Manhole inverts shall be carefully constructed to maintain the proper velocities through the manhole, and in no case shall the invert sections through the manhole be greater than that of the outgoing pipe. The shape of the invert shall conform exactly to the lower half of the pipe it connects. Side branches shall be connected with as large radius of curve as practicable. All inverts shall be troweled to a smooth clean surface.
3. 
The main sewer shall be carried through manholes by split pipe wherever practicable. Concrete filling between the sewer invert and walls of manholes shall be flush with the top edges of the invert and shall slope up from the invert at the rate of two (2) inches per foot. The sewer should be laid continuously through manhole locations wherever grade and alignment permit, and the manhole built later. In such cases, the foundation shall be laid and carried up approximately to the center of the pipe with the specified surface slope.
After the manhole is built, the upper half of the pipe shall be cut out and the bottom finished.
Where it is not practicable to use a split pipe through manholes, due to breaks in grade or elevation of incoming sewers, the sewer invert shall be made of concrete deposited between forms.
4. 
Drop manholes and other special structures shall be built in accordance with the drawings. All fittings, connections, drops, concrete drop encasement, and all other sewer pipe appurtenances built into wall shall be provided for drop manholes and other special structures.
5. 
A drop pipe should be provided for a sewer entering a manhole at an elevation of twenty-four (24) inches or more above the manhole invert. Where the difference in elevation between the incoming sewer and the manhole invert is less than twenty-four (24) inches, the invert should be filleted to prevent solids deposition.
6. 
In streets, highway shoulders, and in yard areas, manhole tops shall match adjoining surface elevations with final adjustment with precast concrete adjusting rings at top of manhole. Contractor shall allow for two (2) four-inch high adjusting rings when determining manhole heights when precast manholes are used to permit adjustment downward if needed. At other locations, manhole tops shall be constructed to elevations as shown on plans.
E. 
Jointing Circular Precast Riser Sections.
1. 
The bell section shall be "buttered" with mastic compound and the next section set in place. Excess mastic inside the manhole shall be struck-off and any void places filled. On the exterior all void places shall be filled.
2. 
Mastic compound shall be a sewer joint compound meeting the approval of the engineer. Preformed flexible plastic gaskets with removable paper will be acceptable.
F. 
Flexible Watertight Pipe Entrance.
1. 
The all rubber gasket shall be permanently cast in place in the manhole opening for the entry pipe.
2. 
The design of the joint will be such that when fully assembled the entering pipe can be deflected a minimum of nine degrees (9°) and withstand an internal hydrostatic pressure equivalent to thirty (30) feet head pressure or thirteen (13) psi for ten (10) minutes without leakage. Moisture or beads of water appearing on the surface of the joint will not be considered leakage.
3. 
Installation shall be accomplished in accordance with the gasket manufacturer's instructions. Joints shall be in accordance with the above specification.
G. 
Manhole Base.
1. 
Precast manholes may be furnished with developed base or base may be constructed in the field at the contractor's option.
2. 
If cast-in-place concrete bases are used, concrete shall be placed on undisturbed earth in accordance with applicable requirements of the concrete section.
3. 
If precast concrete (developed) bases are used, the subgrade materials shall be excavated to undisturbed earth and to a uniform elevation which will permit at least four (4) inches of granular embedment material, as specified in the earthwork section. The surface of the granular material shall be compacted and carefully graded to provide proper grade and alignment of the base section. The base section shall be accurately set so that connecting pipes will be on proper line and grade. No wedging or blocking under precast concrete bases will be permitted.
H. 
Manhole Steps. Steel reinforced plastic steps shall be plant-installed, driven into prepared holes or vibrated into green concrete in accordance with the recommendations of the step manufacture.
I. 
Connecting Piping.
1. 
The space between connecting pipes and the wall of precast sections shall be furnished with a flexible pipe to manhole connector provided.
2. 
When resilient connectors are used, the connecting pipe shall be carefully adjusted to proper line and grade. The pipe shall be installed in the resilient connector prior to backfilling outside the manhole and shall be resealed after completion of the manhole and backfill. All visible leakage shall be eliminated.
3. 
The connecting pipe for installation with resilient connectors shall be plain end, square-cut spigots and shall not protrude more than one-inch inside the manhole wall. A clear distance of at least one (1) inch from the end of each connecting pipe and around the pipe shall be provided when the concrete invert fill is installed. After completion of the manhole, the boxout shall be filled with mastic filler material, completely filling the space beneath the pipe and extending to at least the springline. The filler material shall provide a smooth, uniform surface between the inside diameter of the pipe and the manhole invert.
J. 
Stubs. Stubs for future connections shall be provided in manholes at the locations indicated on the drawings. Stubs shall be not less than 3E-0" or more than 4E-0" long, unless otherwise noted on the drawings, and shall terminate in a bell and plug.
K. 
Waterproofing Manholes.
1. 
Surface shall be prepared by manufacturer.
2. 
The exterior of all manholes shall be coated with a heavy coat of coal-tar paint as required by manufacturer's instructions.
3. 
Reinforced concrete pipe manholes or circular precast concrete section manholes shall be waterproofed.
4. 
Coating damaged during construction shall be recoated and allowed to cure prior to backfilling.
L. 
Vacuum Testing Manholes.
1. 
Each manhole shall be tested immediately after assembly.
2. 
All lift holes shall be plugged with an approved non-shrink grout.
3. 
All pipes entering the manhole shall be plugged, taking care to securely brace the plug from being drawn into the manhole.
4. 
The test head shall be placed on the top of the manhole cover frame and the seal inflated in accordance with the manufacturer's recommendations.
5. 
A vacuum of ten (10) inches of mercury shall be drawn and the vacuum pump shut off. With the valves closed, the time shall be measured for the vacuum to drop to nine (9) inches. The manhole shall pass if the time is greater than sixty (60) seconds for forty-eight-inch diameter, seventy-five (75) seconds for sixty (60) inches, and ninety (90) seconds for seventy-two-inch-diameter manholes.
6. 
If the manhole fails the initial test, necessary repairs shall be made with a non-shrink grout. Retesting shall proceed until a satisfactory test is obtained.
[R.O. 1993 § 705.215]
705-215 top.tif
705-215 bottom.tif
[R.O. 1993 § 705.220]
705-220-1 Left.tif
705-220-1 Right.tif
705-220-2 Left.tif
705-220-2 Right.tif
705-220-3.tif
705-220-4.tif
705-220-5 Left.tif
705-220-5 Right.tif
705-220-6.tif
[R.O. 1993 § 705.250; CC 1988 § 27-66]
A. 
Storm sewers shall be of the types specified and fifteen (15) inches in diameter or larger.
B. 
Culvert pipes shall be a minimum of twelve (12) inches in diameter and of the types specified.
C. 
All pipes, whether sewer or culvert, that are located beneath the normal driving surface, shall be designed for an H15 highway load.
[R.O. 1993 § 705.260; CC 1988 § 27-67]
A. 
Materials used in the construction or extension of storm sewers shall conform to the following specifications:
1. 
Plastic Pipe. Shall be polyvinyl chloride (PVC) meeting the requirements of ASTM F794 or high density polyethylene (HDPE) meeting the requirements of ASTM D1248. Joints shall be as follows:
a. 
For PVC pipe, all joints shall be the integral-bell gasketed type and shall be in accordance with ASTM D3212.
b. 
For HDPE pipe, joints shall be rubber gaskets complying with the requirements of ASTM C443.
2. 
Concrete Pipe. Shall be reinforced concrete pipe, spun or cast type with a smooth finished interior surface. Concrete strength of the pipe shall be in accordance with ASTM specifications C31 and C39. All pipe shall pass a three-edge bearing test as prescribed by ASTM C76. Joints shall be O-ring gasket type which will meet all the requirements of ASTM C443.
3. 
Corrugated Metal Pipe. Shall be fabricated from iron or steel sheets meeting the requirements of ASTM specifications A444. This specification shall cover all fabricated pipe, pipe arches and structural plate. Couplers shall be corrugated bands of the same material and configuration as the pipe. The couplers shall also meet the requirements of ASTM A444.
4. 
Manholes, Junction Boxes And Inlets.
a. 
Manholes, junction boxes and inlets shall be precast, reinforced concrete sections manufactured to the requirements of ASTM C478 (latest revision), or cast-in-place concrete. All units shall be designed for an H15 highway load.
b. 
All castings shall be made of clean, even grain, tough gray cast iron. The casting shall be smooth, true to pattern, and free from projections, sand holes, warp and other defects which would interfere with the use of or impair the serviceability of the casting. All castings shall be well-cleaned before enamel coating is applied. The iron used for these castings shall conform to ASTM A48, latest revision, for Class 30 gray iron. The B test bar [one and two-tenths (1.2) inches diameter by twenty-one (21) inches long] shall be used to prove the quality of iron used.
c. 
Curb inlets shall be heavy-duty two-piece construction, conforming to the shape of the concrete curb and gutter. Grate shall be removable to provide access to the junction box. Minimum size of frame opening shall be twenty-four (24) inches square. Total weight of frame and grate shall be eight hundred (800) pounds minimum.
d. 
Drop inlets shall be heavy-duty two-piece construction. Grate shall be removable to provide access to the junction box. Minimum size of frame opening shall be twenty-four (24) inches.
e. 
All grates shall be rated bicycle safe.
[R.O. 1993 § 705.270; CC 1988 § 27-74]
A. 
The pipe shall be laid true to grade using a laser beam or a grade rod with an iron heel for the invert.
B. 
Should the grade rod be used, a minimum of three (3) batter boards shall be set at the necessary offset. A line shall be drawn taut over the batter boards, and the rod shall have a means for measuring from the line to the invert.
C. 
The alignment of all pipes between manholes or junction boxes shall be true to line and grade, and shall reflect the full bore of the pipe. Each pipe section shall be centered into the adjacent pipe section at each joint.
D. 
The pipe bell shall not rest on the bedding material. The bedding material shall be excavated at each bell such that the weight of the pipe is distributed evenly along the entire length of the pipe barrel.
[R.O. 1993 § 705.280; CC 1988 § 27-75]
A. 
All units shall be set plumb and true to grade. If cast-in-place concrete is used, inverts shall be formed such that it is smooth and flows evenly from inlet to outlet.
B. 
Should precast units be used, the area shall be over excavated a minimum of twelve (12) inches. The excavation shall be brought back to grade with neat concrete. The unit shall be set to true line and grade while the concrete is still pliable enough to fill any voids under the base.
C. 
All castings shall be set to true line and grade in a full bed of mortar. Frames and covers shall have a true bearing surface such that they will seat firmly without rocking or shifting.