The SWM site plan shall consist of a general description of the project, including calculations, maps, and plans. A note on the maps shall refer to the associated computations and erosion and sediment (E&S) control plan by title and date. The cover sheet of the computations and E&S control plan shall refer to the associated maps by title and date. All SWM site plan materials shall be submitted to the municipality in a format that is clear, concise, legible, neat, and well organized; otherwise, the municipality may not accept the SWM site plan for review. The following items shall be included in the SWM site plan:
A. 
General.
(1) 
General description of the project.
(2) 
All stormwater management facilities must be located on a plan and detailed description of proposed stormwater management techniques, including drainage and construction specifications of the materials to be used for the stormwater management facilities.
(3) 
Complete hydrologic, hydraulic, and structural computations for all stormwater management facilities.
(4) 
An erosion and sediment control plan. The applicant is required to obtain a letter of approval or adequacy from the conservation district for the erosion and sediment control plan.
(5) 
A general description of proposed nonpoint source pollution controls.
(6) 
The SWM site plan application and completed fee schedule form and associated fee.
(7) 
The SWM site plan checklist.
B. 
Maps. Prepare an existing resource and site analysis map (ERSAM) showing environmentally sensitive areas including, but not limited to, steep slopes, ponds, lakes, streams, wetlands, hydric soils, vernal pools, stream buffers, floodplains, hydrologic soil groups, closed topographic depressions and recharge areas. Land development, existing recharge areas, and any other requirements specifically outlined in the municipal SALDO also shall be included. Map(s) of the project area shall be submitted on twenty-four-inch-by-thirty-six-inch sheets and/or shall be prepared in a form that meets the requirements for recording at the offices of the Recorder of Deeds of Montgomery County. If the SALDO has more stringent criteria than this chapter, then the more stringent criteria shall apply. The contents of the map(s) shall include, but not be limited to:
(1) 
The location of the project relative to highways, municipal boundaries, or other identifiable landmarks.
(2) 
Existing contours at intervals of two feet or less. In areas of slopes greater than 10%, five-foot contour intervals may be used.
(3) 
Existing streams, lakes, ponds, or other waters of the commonwealth within the project area.
(4) 
Other physical features including flood hazard boundaries, stream buffers, existing drainage courses, areas of natural vegetation to be preserved, and the total extent of the upstream area draining through the site.
(5) 
The locations of all existing and proposed utilities, sanitary sewers, and water lines within 50 feet of property lines.
(6) 
A map, which may be done as an overlay, showing soil names and boundaries.
(7) 
Limits of earth disturbance, including the type and amount of impervious area that is proposed.
(8) 
Proposed structures, roads, paved areas, and buildings.
(9) 
Final contours at intervals of two feet or less. In areas of steep slopes (greater than 10%), five-foot contour intervals may be used.
(10) 
The name of the development, the name and address of the owner of the property, and the name of the individual or firm preparing the plan.
(11) 
The date of submission.
(12) 
A graphic and written scale of one inch equals no more than 50 feet; for tracts of 20 acres or more, the scale shall be one inch equals no more than 100 feet.
(13) 
A North arrow.
(14) 
The total tract boundary and size with distances marked to the nearest foot and bearings to the nearest degree.
(15) 
Existing and proposed land use(s).
(16) 
A key map showing all existing man-made features beyond the property boundary that would be affected by the project.
(17) 
Location of all open channels.
(18) 
Overland drainage patterns and swales.
(19) 
A fifteen-foot-wide access easement around all stormwater management facilities to provide ingress to and egress from a public right-of-way, where necessary, or appropriate at discretion of the municipality.
(20) 
The location of all erosion and sediment control facilities.
(21) 
A note on the plan indicating the location and responsibility for maintenance of stormwater management facilities that would be located off site. All off-site facilities shall meet the performance standards and design criteria specified in this chapter located within this municipality.
(22) 
A statement, signed by the applicant, acknowledging that any revision to the approved drainage plan must be approved by the municipality, and that a revised erosion and sediment control plan must be submitted to the municipality and County Conservation District for approval.
(23) 
The following signature block for the design engineer:
"I, (Design Engineer), on this date (date of signature); hereby certify that this drainage plan meets all requirements of the Department of Environmental Protection's (DEP's) regulations and this Ordinance."
C. 
Supplemental information to be submitted to the municipality.
(1) 
The following information shall be submitted by the applicant and shall include:
(a) 
The overall stormwater management concept for the project designed.
(b) 
Stormwater runoff computations required by this chapter.
(c) 
Stormwater management techniques to be applied both during and after development.
(d) 
Expected project time schedule.
(e) 
Development stages or project phases, if so proposed.
(f) 
An operations and maintenance (O&M) plan in accordance with § 291-702 of this chapter.
(2) 
A description of the effect of the project (in terms of runoff volumes and peak flows) on adjacent properties and on any existing municipal stormwater collection system that may receive runoff from the project site.
(3) 
An approved highway occupancy permit from the Pennsylvania Department of Transportation (PennDOT) District office when drainage towards PennDOT property is proposed.
D. 
Stormwater management facilities.
(1) 
When infiltration measures such as seepage pits, beds, or trenches are used, the locations of existing and proposed septic tank infiltration areas and wells must be shown.
(2) 
All calculations, assumptions, and criteria used in the design of the stormwater management facilities must be shown.
The municipality requires submission of a complete SWM site plan, as specified in this chapter.
A. 
Proof of application or documentation of required permit(s) or approvals for the programs listed below shall be part of the plan:
(1) 
National Pollutant Discharge Elimination System (NPDES) permit for stormwater discharges from construction activities, when required.
(2) 
Any other permit under applicable state or federal regulations.
B. 
Six copies of the SWM site plan shall be submitted and distributed as follows:
(1) 
Three copies to the municipality accompanied by the requisite fees, as specified in this chapter.
(2) 
Two copies to the County Conservation District.
(3) 
The Montgomery County Planning Commission will be notified by letter regarding submission of the SWM plan to the municipality and MCCD, and that no SWM plan need be submitted to MCPC.
C. 
If any submissions to the agencies listed above are found to be incomplete, the municipalities have the option of notifying the applicant and requesting specific information missing from the submission. The application review clock will not start until the municipality has determined that the submission is complete.
D. 
Additional copies shall be submitted as requested by the municipality, County Conservation District, or DEP.
A. 
The SWM site plan must be consistent with this chapter. If any submissions are found to be incomplete, the municipalities have the option of notifying the applicant and requesting specific information missing from the submission. The application review clock will not start until the municipality has determined that the submission is complete.
B. 
The municipality will notify the applicant in writing within 45 days whether the SWM site plan is approved or disapproved. If the SWM site plan involves a subdivision and land development plan, the notification period is 120 days. If a longer notification period is provided by other statute, regulation, or ordinance, the applicant will be so notified by the municipality. If the municipality disapproves the SWM site plan, the municipality shall cite the reasons for disapproval in writing.
A modification to a submitted SWM site plan that involves a change in BMPs or techniques, or that involves the relocation or redesign of BMPs, or that is necessary because soil or other conditions are not as stated on the SWM site plan as determined by the municipality shall require modification and resubmission of the SWM site plan in accordance with this article.
A disapproved SWM site plan may be resubmitted, with the revisions addressing the municipality's concerns, to the municipality in accordance with this article. The applicable review fees must accompany a resubmission of a disapproved SWM site plan.