A. 
For subdivisions and land developments, the applicant shall provide a financial guarantee to the Borough for the timely installation and proper construction of all stormwater management (SWM) facilities. The guarantee shall be solely determined by the Borough and based upon either:
(1) 
Requirements of the approved SWM site plan and equal to or greater than the full construction cost of the required controls; or
(2) 
The amount and method of payment provided for in the Borough's Subdivision and Land Development Ordinance.[1]
[1]
Editor's Note: See Ch. 347, Subdivision and Land Development.
B. 
For other regulated activities, the Borough shall solely determine whether or not a financial guarantee is required from the applicant and the amount of the guarantee.
A. 
The owner of any land upon which stormwater facilities and BMPs will be placed, constructed, or implemented, as described in the stormwater facility and BMP O&M plan, shall record the following documents in the office of the Recorder of Deeds for Montgomery County, within 30 days of approval of the stormwater facility and BMP O&M plan by the Borough:
(1) 
The O&M plan, or a summary thereof;
(2) 
O&M agreements under § 338-34; and
(3) 
Easements under § 338-35.
B. 
The Borough may suspend or revoke any approvals granted for the project site upon discovery of failure on the part of the owner to comply with this section.
C. 
The following items shall be included in the stormwater facility and BMP O&M plan:
(1) 
Map(s) of the project area, in a form that meets the requirements for recording at the offices of the Recorder of Deeds of Montgomery County, and shall be submitted on twenty-four-inch by thirty-six-inch sheets, unless a small size is approved by the Borough. The contents of the maps(s) shall include, but not be limited to:
(a) 
Clear identification of the location and nature of stormwater facilities and BMPs;
(b) 
The location of the project site relative to highways, municipal boundaries or other identifiable landmarks;
(c) 
Existing and final contours at intervals of two feet, or others as appropriate;
(d) 
Existing streams, lakes, ponds, or other bodies of water within the project site area;
(e) 
Other physical features, including flood hazard boundaries, sinkholes, streams, existing drainage courses, and areas of natural vegetation to be preserved;
(f) 
The locations of all existing and proposed utilities, sanitary sewers, and water lines on site and within 50 feet of property lines of the project site;
(g) 
Proposed final changes to the land surface and vegetative cover, including the type and amount of impervious area that would be added;
(h) 
Proposed final structures, roads, paved areas, and buildings; and
(i) 
A twenty-foot-wide access easement around all stormwater facilities and BMPs that would provide ingress to and egress from a public right-of-way;
(2) 
A description of how each stormwater facility and BMP will be operated and maintained, and the identity and contact information associated with the person(s) responsible for O&M;
(3) 
The name of the project site, the name and address of the owner of the property, and the name of the individual or firm preparing the plan; and
(4) 
A statement, signed by the facility owner, acknowledging that the stormwater facilities and BMPs are fixtures that can be altered or removed only after approval by the Borough.
D. 
The stormwater facility and BMP O&M plan for the project site shall establish responsibilities for the continuing O&M of all stormwater facilities and BMPs, as follows:
(1) 
If a plan includes structures or lots which are to be separately owned and in which streets, sewers and other public improvements are to be dedicated to the Borough, stormwater facilities and BMPs may also be offered for dedication to and maintained by the Borough.
(2) 
If a plan includes O&M by single ownership, or if sewers and other public improvements are to be privately owned and maintained, the O&M of stormwater facilities and BMPs shall be the responsibility of the owner or private management entity.
E. 
The Borough shall make the final determination on the continuing O&M responsibilities. The Borough reserves the right to accept or reject the O&M responsibility for any or all of the stormwater facilities and BMPs.
F. 
Facilities, areas, or structures used as BMPs shall be enumerated as permanent real estate appurtenances and recorded as deed restrictions or conservation easements that run with the land.
G. 
The O&M plan shall be recorded as a restrictive deed covenant that runs with the land.
H. 
The Borough may take enforcement actions against an owner for any failure to satisfy the provisions of this article and this chapter.
A. 
The Borough shall review the stormwater facilities and BMP O&M plan for consistency with the purposes and requirements of this chapter, and any permits issued by PADEP.
B. 
The Borough shall notify the applicant in writing whether the stormwater facility and BMP O&M plan is approved.
C. 
The Borough shall require a record drawing of all stormwater facilities and BMPs.
A. 
The owner shall sign an O&M agreement with the Borough covering all stormwater facilities and BMPs that are to be privately owned. The O&M agreement shall be transferred with transfer of ownership. The agreement shall be substantially the same as the sample agreement in Appendix A of this chapter.
B. 
Other items may be included in the O&M agreement where determined necessary to guarantee the satisfactory O&M of all stormwater controls and BMPs. The O&M agreement shall be subject to the review and approval of the Borough.
C. 
The owner is responsible for the O&M of the SWM BMPs. If the owner fails to adhere to the O&M agreement, the Borough may perform the services required and charge the owner appropriate fees. Nonpayment of fees may result in a lien against the property.
A. 
The owner must obtain all necessary real estate rights to install, operate, and maintain all stormwater facilities in the SWM site plan or small project SWM site plan.
B. 
The owner must provide the municipal easements, or other appropriate real estate rights, to perform inspections and maintenance for the preservation of stormwater runoff conveyance, infiltration, and detention areas.
Stormwater facilities or BMPs identified in a small project SWM site plan must properly operate and maintain stormwater facilities or BMPs, but are exempt from the requirements of §§ 338-31 through 338-35 of this chapter.