[HISTORY: Adopted by the Town Board of the Town of Albion 10-2-2017 by L.L. No. 3-2017. Amendments noted where applicable.]
GENERAL REFERENCES
Zoning — See Ch. 103.
This chapter shall be referred to as "Local Law No. 3 of 2017 Adding Chapter 105 to the Albion Town Code Concerning Solar Energy Systems and Solar Energy Farms."
This chapter is adopted pursuant to the legislative authority in Municipal Home Rule Law § 10, Town Law §§ 261 through 264, General Municipal Law § 96-a and § 119-dd and Public Service Law, Article 10.
The Town of Albion (hereinafter referred to as "Albion") finds that solar energy, as properly regulated, is clean, readily available and a renewable energy source beneficial to Albion, its residents and the general public. Among other things, solar energy can potentially take advantage of a safe, abundant, renewable and nonpolluting energy resource and can also decrease the cost of energy to commercial and residential properties. Solar energy can increase employment and business development in Albion by furthering the installation of solar energy systems and solar energy farms. Albion finds a growing need to properly site and regulate solar energy systems and solar energy farms within Albion to protect residential, commercial, business and other areas or land uses, to preserve the overall beauty, nature and character of Albion to promote the effective and efficient use of solar energy resources and to protect the health, safety and general welfare of the citizens of Albion. Solar energy systems and/or solar energy farms deplete land available for other uses, introduce industrial usage into other nonindustrial areas and can potentially pose environmental challenges. Solar energy systems and/or solar energy farms need to be regulated for removal when no longer utilized and/or useful in order to prevent environmental problems and/or abandonment of industrial properties and/or such solar energy systems and/or solar energy farms.
As used in this chapter, the following terms shall have the meanings indicated hereinbelow:
BUILDING-INTEGRATED PHOTOVOLTAIC SYSTEM
A combination of photovoltaic building components integrated into any building envelope system such as vertical facades, including glass and other facade material, semitransparent skylight systems, roofing materials and shading over windows.
GROUND-MOUNTED SOLAR ENERGY SYSTEM
A solar energy system that is anchored to the ground and attached to a pole or other mounting system, detached from any other structure for the primary purpose of producing electricity for on-site consumption.
LARGE-SCALE SOLAR ENERGY SYSTEM
A solar energy system that is ground-mounted and produces energy primarily for the purpose of on-site usage or consumption not to exceed 15 kilowatts (kw) direct current (dc) or more when operating at maximum efficiency.
ROOF-MOUNTED SOLAR ENERGY SYSTEM
A solar panel system located on the roof of any legally permitted building or structure for the purpose of producing electricity for on-site or off-site consumption.
SOLAR ENERGY EQUIPMENT
Electrical energy storage devises, material, hardware, inverters or other electrical equipment and conduit of photovoltaic devices associated with the production of electrical energy.
SOLAR ENERGY SYSTEM
An electrical generating system composed of a combination of both solar panels and solar energy equipment.
SOLAR FARM
The use of land where a series of one or more solar collectors are placed in an area on a parcel of land for the purpose of generating photovoltaic power and said series of one or more solar collectors placed in an area on a parcel of land collectively has nameplate generation capacity of at least 15 kilowatts (kw) direct current (dc) or more when operating at maximum efficiency, for the purpose of off-site sale, usage and/or consumption. The term "solar farm" shall not be construed to include, so as to prohibit, or have the effect of prohibiting, the installation of a solar collector that gathers solar radiation as a substitute for traditional energy for water heating, active space heating and cooling, passive heating or generating electricity for a residential property. The term "solar farm" shall also not be construed in such a way as to prohibit the installation or mounting of a series of one or more solar collectors upon the roofs of residential and/or commercial structures regardless of whether said series of one or more solar collectors collectively has a total nameplate generation of at least 15 kilowatts (kw) direct current (dc) or more when operating at maximum efficiency.
SOLAR PANEL
A photovoltaic device capable of collecting and converting solar energy into electrical energy.
The requirements of this chapter shall apply to all solar energy systems and/or solar energy farms proposed, installed, operated, maintained, modified or constructed in Albion after the effective date, excluding general maintenance and repair and/or building-integrated photovoltaic systems, with the proviso that same comport with any and all noise and glare regulations contained in the Albion Town Code currently or in the future.
A. 
Roof-mounted solar energy systems.
(1) 
Roof-mounted solar energy systems that use the electricity on site or off site are permitted as an accessory use in all zoning districts when attached to any lawfully permitted building or structure.
(2) 
Height. Solar energy systems shall not exceed the maximum height restrictions of the zoning district within which they are located and are provided the same height exemptions granted to building-mounted mechanical devices or equipment.
(3) 
Aesthetics. Roof-mounted solar energy system installations shall incorporate, when feasible, the following design requirements: panels facing the front yard must be mounted at the same angle as the roof's surface with a maximum distance of 18 inches between the roof and highest edge of the system.
(4) 
Roof-mounted solar energy systems that use the energy on site shall be exempt from site plan review under the local zoning code[1] or other land use regulations. Roof-mounted installations can be installed in all properties regardless of zoning, subject to applicable permit requirements to do so and applicable New York State building codes.
[1]
Editor's Note: See Ch. 103, Zoning.
B. 
Ground-mounted solar energy systems.
(1) 
Ground-mounted solar energy systems that use the electricity primarily on site are permitted as accessory structures in Albion.
(2) 
Height and setback. Ground-mounted solar energy systems shall adhere to the setback requirements of the underlying zoning district. All ground-mounted panels shall not exceed 12 feet in height.
(3) 
Lot coverage. A ground-mounted solar energy system shall not exceed 50% of the lot on which it is installed. The lot coverage percentage used by any ground-mounted solar energy system, shall include all aspects necessary or required for the system (i.e., fences, shrubbery, roadways, parking) and said percentage shall be in conformity with any Albion Town Code regulations concerning same, including zoning regulations.[2]
[2]
Editor's Note: See Ch. 103, Zoning.
(4) 
All such systems are permitted in commercial or industrial zones only (and not in residential zones) and shall be installed on the side or rear portion of the subject property. Any request to install a ground-mounted solar energy system on property zoned residential and/or property contained in a agricultural farm district must either be done by an appropriate application to the Zoning and/or Planning Board(s).
A. 
Large-scale solar energy systems are permitted through approval by Albion, subject to the requirements set forth in this section, including site plan approval. Applications for the installation of a large-scale solar energy system are to be initiated and processed by the Albion Town Planning Board. Thereafter, after appropriate review by said Board, appropriate review action, approval, conditional approval and/or denial can be made.
B. 
Application requirements. For any application, same is to include the following provisions:
(1) 
If the property of the proposed project is to be leased, legal consent between all parties specifying the use(s) of the land for the duration of the project, including easements and other agreements, shall be submitted.
(2) 
Blueprints showing the layout of the solar energy system signed by a professional engineer or registered architect shall be required.
(3) 
The equipment specification sheets shall be documented and submitted for all photovoltaic panels, significant components, mounting systems and inverters that are to be installed.
(4) 
Property operations and maintenance plan. Such plan shall describe continuing photovoltaic maintenance property upkeep such as mowing and trimming.
C. 
Application standards.
(1) 
Height and setback. Large-scale solar energy systems shall adhere to the setback requirements of the underlying zoning district as follows herein. Any large-scale solar energy systems that are ground-mounted shall not exceed a height of 15 feet. The retail business/commercial and/or recreational front setback shall be 75 feet, the rear setback shall be 25 feet and the side setback shall be 25 feet. The residential and light industrial front setbacks shall be 100 feet; the rear and side setbacks shall be 200 feet when abutting residential property and shall be 100 feet when abutting business commercial zones.
(2) 
Lot size. Large-scale solar energy systems shall be located on lots with a minimum lot size of 10 acres.
(3) 
Lot coverage. A large-scale solar energy system that is ground-mounted shall not exceed 50% of the lot on which it is installed. The lot coverage percentage used by any ground-mounted solar energy system shall include all aspects necessary or required for the system (i.e., fences, shrubbery, roadways, parking) and said percentage shall be in conformity with any Albion Town Code regulations concerning same, including zoning regulations.[1]
[1]
Editor's Note: See Ch. 103, Zoning.
(4) 
All large-scale energy systems shall be enclosed by fencing to prevent unauthorized access. Warning signs with the owner's contact information shall be placed on the entrance and perimeter of the fencing. The type of fencing shall be determined by Albion. The fencing and the system may be further screened by any landscaping needed to avoid adverse aesthetic impacts.
(5) 
All applications shall meet any substantive provisions contained in local site plan requirements in the zoning code[2] that, in the judgment of Albion, are applicable to the system being proposed.
[2]
Editor's Note: See Ch. 103, Zoning.
(6) 
Albion may impose conditions on its approval of any special use permit in order to enforce the standards referred to herein or in order to discharge its obligations under the State Environmental Quality Review Act (SEQRA).
A. 
The requirements of this section are established for the purpose of allowing the development of solar farms in Albion and to provide standards for the placement, design, construction, operation, monitoring, modification and removal of these systems.
B. 
The term "solar farm" shall not be construed to include, so as to prohibit, or have the effect of prohibiting, the installation of a solar collector that gathers solar radiation as a substitute for traditional energy for water heating, active space heating and cooling, passive heating or generating electricity for a residential property. The term "solar farm" shall also not be construed in such a way as to prohibit the installation or mounting of a series of one or more solar collectors upon the roofs of residential and/or commercial structures regardless of whether said series of one or more solar collectors collectively has a total nameplate generation of at least 15 kilowatts (kw) direct current (dc) or more when operating at maximum efficiency.
C. 
The following application information is required:
(1) 
Blueprints or drawings of the solar photovoltaic installation signed by a licensed professional engineer showing the proposed layout of the system and any potential shading from nearby structures.
(2) 
Proposed changes to the landscape of site, grading, vegetation clearing and planting, exterior lighting, screening vegetation or structures. Additionally, any vegetation clearing can or may be considered to be a negative impact for SEQRA purposes depending upon the scope of same.
(3) 
A description of the solar farm facility and the technical, economic and other reasons for the proposed location and design shall be prepared and signed by a licensed professional engineer that the solar farm complies with all applicable federal and state standards.
(4) 
One- or three-phase line electrical diagram detailing the solar farm layout, solar collector installation, associated components, and electrical interconnection methods, with all National Electrical Code compliant disconnects and overcurrent devices.
(5) 
Documentation of the major system components to be used, including the PV panels, mounting system and inverter.
(6) 
An operation and maintenance plan which shall include measures for maintaining safe access to the installation, stormwater controls, as well as general procedures for operational maintenance of the installation.
(7) 
Information on noise (inverter) and reflectivity/glare of solar panels and identify potential impacts to abutters.
(8) 
If the property of the proposed project is to be leased, legal consent between all parties specifying the use(s) of the land for the duration of the project, including easements and other agreements shall be submitted.
D. 
In addition to any site plan approval required by the Albion Planning Board herein, a special use permit is required for a solar farm. The development shall conform to the following standards which shall be regarded as minimum requirements:
(1) 
Solar farms of at least 15 kw shall be on a parcel of not less than 10 acres.
(2) 
Solar farms shall adhere to the height and setback requirements of the underlying zoning district except as follows herein. Any solar farms that are ground-mounted shall not exceed a height of 15 feet. The retail business/commercial and/or recreational front setback shall be 75 feet, the rear setback shall be 25 feet and the side setback shall be 25 feet. The residential and light industrial front setback shall be 100 feet; the rear and side setback shall be 200 feet when abutting residential property and shall be 100 feet when abutting business/commercial zones.
(3) 
All mechanical equipment on a solar farm, including any structure for batteries or storage cells, are completely enclosed by a minimum eight-foot-high fence with a self-locking gate.
(4) 
The total surface area of all ground-mounted and freestanding solar collectors, including solar voltaic cells, panels and arrays, shall not exceed 50% of the total parcel area.
(5) 
The installation of a vegetated perimeter buffer to provide year-round screening of the system from adjacent properties.
(6) 
Because of neighborhood characteristics and topography, Albion shall examine the proposed location on a case-by-case basis, ensuring the potential impact to its residents, business or traffic are not a detriment.
(7) 
All solar energy production systems are designed and located in order to prevent reflective glare toward any habitable buildings, as well as streets and rights-of-way.
(8) 
All on-site utility and transmission lines are, to the extent feasible, placed underground.
(9) 
The installation of a clearly visible warning sign concerning voltage must be placed at the base of all pad-mounted transformers and substations.
(10) 
The system is designed and situated to be compatible with the existing uses on adjacent and nearby properties.
(11) 
All solar energy system components shall conform with the setback requirements set forth in the Albion Town Code for the particular district.
(12) 
Solar modular panels shall not contain hazardous materials.
(13) 
All appurtenant structures, including but not limited to equipment shelters, storage facilities, transformers and substations shall be architecturally compatible with each other and shall be screened from the view of persons not on the parcel.
(14) 
Lighting of solar farms shall be consistent with all state and federal laws. Lighting of appurtenant structures shall be limited to that required for safety and operational purposes and shall be reasonably shielded from abutting properties. Where feasible, lighting of the solar photovoltaic installation shall be directed downward and shall incorporate full cutoff fixtures to reduce light pollution.
(15) 
There shall be no signs except announcement signs, such as "no trespassing" signs or any signs required to warn of danger. A sign is required that identifies the owner and operator with an emergency telephone number where the owner and operator can be reached on a twenty-four-hour basis. Any signage, laws, regulations and/or ordinances, including the National Electrical Code and/or Emergency Services, shall prevail over the requirements contained in the previous two sentences of this subsection in the event that a conflict arises.
(16) 
There shall be a minimum of one parking space to be used in connection with the maintenance of the solar photovoltaic facility and the site. However, it shall not be used for the permanent storage of vehicles.
E. 
The following additional conditions shall apply to solar farms:
(1) 
The solar farm owner or operator shall provide a copy of the project summary, electrical schematic and site plan to the local Fire Chief. Upon request, the owner or operator shall cooperate with local emergency services in developing an emergency response plan. All means of shutting down the solar farm facility shall be clearly marked. The owner or operator shall identify a responsible person for public inquiries through the life of the installation.
(2) 
No solar farm shall be approved or constructed until evidence has been given to Albion that the utility company operating the electrical grid where the installation is to be located has authorized the interconnected customer-owner generator.
(3) 
A solar farm owner or operator shall maintain the facility in good condition. Maintenance shall include, but not be limited to, painting, structural repairs and integrity of security measures. Site access shall be maintained to a level acceptable to the local Fire Chief and emergency medical services. The owner or operator shall be responsible for the cost of maintaining the solar farm and any access road(s), unless accepted as a public way.
A. 
Any large-scale solar energy systems and/or solar energy farms are considered abandoned after six months without electrical energy generation and must be removed from the property. Applications for extensions subsequent to such an abandonment as described in the previous sentence can be reviewed by the Albion Planning Board for a period of up to six months after such abandonment.
B. 
All applications for any large-scale solar energy system and/or solar energy farm shall include and be accompanied by a decommissioning plan to be implemented upon abandonment and/or in conjunction with the removal of same and shall:
(1) 
Include an affirmative obligation that after any large-scale solar energy system and/or solar energy farm can no longer be used it shall be removed by the applicant and/or any subsequent owner.
(2) 
Demonstrate how the removal of all infrastructure and the remediation of soil and vegetation shall be conducted to return the parcel to its original state prior to construction.
(3) 
Include an expected time line for execution and completion.
(4) 
Include a cost estimate detailing the projected expense of executing the decommissioning plan to be prepared by a professional engineer or registered architect.
(5) 
Obligate the owner, operator and/or successors in interest to remove any ground-mounted solar collectors which have reached the end of their useful life or have been abandoned; they shall physically remove the installation no more than six months after the date of discontinued operations and they shall notify Albion by certified mail of the proposed date of discontinued operations and plans for removal.
(6) 
An obligation to physical removal of all ground-mounted solar collectors, structures, equipment, security barriers and transmission lines from the site.
(7) 
Include an obligation to dispose of all solid and hazardous waste in accordance with local, state and federal waste disposal regulations.
C. 
Absent notice of a proposed date of decommissioning and written notice of extenuating circumstances, any large-scale solar energy system and/or any solar energy farm shall be considered abandoned when it fails to operate (as set forth in Subsection A of this section) for more than six months without the written consent of the Albion Planning Board. If the owner or operator of any large-scale solar energy system and/or any solar farm fails to remove the installation in accordance with the requirements of this section within six months of abandonment or the proposed date of decommissioning, Albion may enter the property and physically remove the installation upon application to a court of appropriate jurisdiction to obtain access to said property for that purpose.
D. 
In the event the Albion Planning Board grants an application for a solar farm, said Board shall require that the applicant and/or property owner provide or establish a bond, surety bond, financial deposit, undertaking, financial escrow and/or other financial security, the amount, substance and character of which is to be determined by and at the sole discretion of said Board, the spirit and intent of same being to ensure that sufficient funds are available to remove the installation and restore landscaping consistent with the best interests of the landowner and/or Albion in the event the applicant fails to comply with its decommissioning obligations with same to be annually reviewed for financial sufficiency (with any decision relating to continued financial sufficiency also to be in the sole discretion of said Board). As a part of the foregoing review process, an owner or operator shall provide financial documentation, financial statements or any other information requested by said Board on an annual basis. Albion reserves the right to request reasonable access to the property upon notice and consent.
Any violation of this chapter shall be subject to the same civil and criminal penalties provided for in the Albion Town Code, including any applicable zoning regulations,[1] and/or the laws of the State of New York.
[1]
Editor's Note: See Ch. 103, Zoning.
If any clause, sentence, paragraph, subdivision, section or part of this chapter, or the application thereof to any person, individual, firm or corporation, or circumstance, shall be adjudged by any court of competent jurisdiction to be invalid or unconstitutional, such order or judgment shall not affect impair or invalidate the remainder thereof, but shall be confined in its operation to the clause, sentence, paragraph, subdivision, section or part of this chapter, or in its application to the person, individual, firm or corporation, or circumstance, directly involved in the controversy in which said order or judgment shall be rendered.
This chapter shall take effect upon the date it is filed in the Office of the New York State Secretary of State in accordance with the Municipal Home Rule Law § 27.