Standard
|
Requirement
| |
---|---|---|
Lot width
|
250 feet
| |
Front yard setback
| ||
Town highway
|
100 feet
| |
County highway
|
125 feet
| |
State highway
|
150 feet
| |
Side yard setback (each)
|
75 feet
| |
Rear yard setback
|
75 feet
| |
Building height
|
35 feet
| |
Maximum height of solar collectors
|
12 feet
| |
Maximum height of fencing
|
8 feet
|
*
|
If the lot or lots of the proposed solar energy system front(s)
on two or more streets, then each of those yards shall be deemed the
front yard. The required side and rear yard setbacks shall be measured
to the visible structural component of the solar energy system nearest
the side lot line or rear lot line, respectively.
|