A.
A fee schedule
shall be established by resolution of the Board of Trustees of this
Village. Such fee schedule may thereafter be amended from time to
time by like resolutions. The fees set forth in, or determined in
accordance with, such fee schedule or amended fee schedule shall be
charged and collected.
B.
The following schedule of fees shall apply to new construction or
alterations of existing structures:
[Amended 12-21-2015 by Res. No. 10-2015-16; 5-9-2016 by Res. No. 18-2015-16; 7-8-2019 by Res. No. 27-2018-19]
New single-family homes or $20 minimum
| |||
900 to 1,400 square feet
|
$250
| ||
1,401 to 2,000 square feet
|
$450
| ||
2,000 square feet and over
|
$750
| ||
Accessory structures, (sheds, decks, etc.) per square foot or
$20 minimum
|
$0.15
| ||
Gas wells
|
$20
| ||
Swimming pools
|
$35
| ||
Fence
|
$20
| ||
Demolition
|
$20
| ||
Detached garage per square foot or $20 minimum
|
$0.20
| ||
Residential additions per square foot or $20 minimum
|
$0.20
| ||
Requested inspections
|
$25
| ||
Additional review as required by revisions to plans - additional
charge
|
$10
| ||
Certificate of occupancy or compliance
|
$25
| ||
Temporary certificate of occupancy or compliance
|
$25
| ||
Late fee for a permit application filed after the start of construction:
| |||
Property owner
|
$50
| ||
Contractor
|
$150
| ||
Renewal of a building permit
|
20% of original fee or $20 minimum
|
Roof replacement
| ||||
Residential
|
$35
| |||
Commercial or industrial
| ||||
0 to 10,000 square feet
|
$100
| |||
10,001 to 20,000 square feet
|
$150
| |||
20,001+ square feet
|
$200
|
Commercial — Industrial
|
New construction/additions/alterations — fee based on
project cost/valuation
|
Includes all plumbing, mechanical, electrical, water/sewer upgrades
and improvements. Also includes any change of occupancy classification
and/or change of use. Valuation will be based on the ICC (International
Code Council) Building Valuation Table.
|
Building permit fee = Minimum charge times square foot charge
based on total project valuation
|
Project cost calculation to determine fee:
|
New construction: Gross floor area times square foot construction
cost**
|
Alterations: Construction cost shall be based upon the contract
bid price or a sound estimate that includes all fair market labor,
material and equipment costs for building, electrical, plumbing, mechanical,
fire prevention and energy. (If a contract bid price or sound estimate
is not available, the fee shall be calculated based on the rate for
new construction.)
|
**square foot construction cost calculation: total square footage
of construction times square foot construction cost from Building
Valuation Table published by the ICC (International Code Council)
biannually as an average construction cost. (To determine the appropriate
square foot construction using the Building Valuation Table, determine
the applicable building use group located in the left column and follow
that row to the right over to the appropriate construction type column
along the top of the table.)
|
Valuation
|
Fee
|
---|---|
$0.00 to $5,000
|
$25
|
$5,001 to $25,000
|
$75 plus $0.20 per square foot
|
$25,001 to $100,000
|
$150 plus $0.20 per square foot
|
$100,001 to $250,000
|
$300 plus $0.20 per square foot
|
$250,001 to $500,000
|
$500 plus $0.25 per square foot
|
$500,001 to $1,000,000
|
$1,000 plus $0.25 per square foot
|
$1,000,001 to $5,000,000
|
$4,000 plus $0.25 per square foot
|
$5,000,001 and over
|
$8,000 plus $0.25 per square foot
|
C.
Fire inspections.
[Amended 5-9-2016 by Res.
No. 18-2015-16]
Structure
|
Fee
| |
---|---|---|
Multiple dwellings
| ||
3 to 4 apartments
|
$50
| |
5 to 9 apartments
|
$100
| |
10 and over apartments
|
$110 plus $10 per additional apartment
| |
Commercial buildings
| ||
0 to 5,000 square feet
|
$50
| |
5,001 to 10,000 square feet
|
$75
| |
Over 10,001 square feet
|
$150
| |
Areas of public assembly
| ||
Occupancy 0 to 49
|
$50
| |
Occupancy 50 and above
|
$100
|
D.
Floodplain development permit: $100.
[Amended 5-9-2016 by Res.
No. 18-2015-16]
E.
Operating permit: $50.
[Amended 5-9-2016 by Res.
No. 18-2015-16]
F.
Peddling and soliciting: $50 plus $10 per day, not to exceed $500
per calendar year.
[Amended 5-9-2016 by Res.
No. 18-2015-16; 9-11-2017 by Res. No. 38-2016-17]
G.
Public hearing: $75.
[Amended 5-9-2016 by Res.
No. 18-2015-16]
H.
Returned check fee: $30.
[Amended 5-9-2016 by Res.
No. 18-2015-16]
L.
Street excavating permits.
[Added 4-10-2017 by Res.
No. 13-2016-17]
(1)
Street excavating permit, per address: $75.
(a)
The contractor/entity will make application to the Village of
Celoron Highway Department for each individual permit required. An
individual permit is required for each Village address upon which
work is to be performed, or upon which access is required for any
business purpose, in the Village's right-of-way. Upon review
and approval of the application, a permit or, in the case of multiple
addresses, permits will be issued, for a period not to exceed two
weeks. If the work in the right-of-way exceeds two weeks, the contractor/entity
must pay an additional $75 for each individual permit and for each
additional two-week period.
(b)
Failure to apply for and pay for the individual right-of-way
permit(s) will result in a doubling of the permit fee for a first
occurrence and a mandatory penalty of $250 for each subsequent occurrence.
Additionally, any entity or individual contractor who violates this
subsection may forfeit any future ability to work in the Village of
Celoron right-of-way at the discretion of the Highway Superintendent.
(2)
Annual street excavating permits: utility companies:
(a)
Board of Public Utilities: $5,000.
(b)
National Fuel Gas Distribution Corporation: $2,600.
(c)
Windstream: $1,300.
(d)
Charter Communications (formerly Time Warner Cable): $800
(e)
Notwithstanding the foregoing, the above-named utility companies
can annually elect to either pay the annual right-of-way fee set forth
above or pay on a per-instance/-address basis by obtaining individual
right-of-way permits for all work or business conducted in the Village's
rights-of-way as necessary.
(f)
The permit year shall be July 1 through June 30. The entity
electing to pay the annual right-of-way permit fee will pay the full
amount of the annual fee on or before June 30 of the year preceding
the year for which the annual permit is to be issued. Failure to pay
by June 30 will be interpreted as an election to pay on a per-instance/-address
basis, and the entity will be subject to the requirements applicable
to the issuance of individual right-of-way permits with respect to
all work or business conducted in the Village's rights-of-way.
An entity can elect to pay its annual fee after June 30; however,
the entity will be responsible for the full amount of the annual fee,
regardless of the date paid, and will not be entitled to any credit
for any individual permit fees paid.
M.
Unified solar energy permit: $75.
[Added 9-11-2017 by Res.
No. 38-2016-17]
N.
Waterfront
assessment form: $75.
[Added 5-14-2018 by Res.