Any new industrial user wishing to connect to the public sewerage
system within the City shall be required to complete an industrial
request to discharge before applying for a plumbing permit. The City
will determine whether or not the proposed industrial user must provide
further information to the City. If no further information is needed,
the prospective industrial user may apply for a plumbing permit.
Any existing industrial user that desires to increase the amount,
or change the nature, of the waste discharged to the City sewer system
shall submit an industrial request to discharge to the City. The request
will be evaluated to determine if further information is required.
Upon request of the City, each industrial user may be required
to submit to the City a baseline monitoring report. The report shall
contain data on the characteristics of the wastewater discharged from
the industrial user, such as projected flows, concentrations of compatible
pollutants, oils and grease, and any toxic substances as defined by
this chapter. The purpose of the baseline monitoring report is to
determine whether the wastewater discharged by an industrial user
is compatible with the City's wastewater facilities or should be regulated
through the use of a permit.