Exciting enhancements are coming soon to eCode360! Learn more 🡪
City of Bridgman, MI
Berrien County
By using eCode360 you agree to be legally bound by the Terms of Use. If you do not agree to the Terms of Use, please do not use eCode360.
Table of Contents
Table of Contents
All stormwater detention facilities other than rooftops, parking lots and/or underground storage shall be located not less than 75 feet from any building or structure to be occupied unless otherwise approved by the City Engineer.
A. 
Detention basin storage volume shall be determined in accordance with the requirements of the City Engineer and compensate for 100% of the calculated stormwater volume generated.
B. 
Detention basins with permanent ponds shall be designed in accordance with specifications approved by the City Engineer.