[Ord. No. 338, 1/10/2011]
For any of the activities regulated by this chapter and not eligible for the exemptions provided in §
23-302, the final approval of subdivision and/or land development plans, the issuance of any building or occupancy permit, or the commencement of any land disturbance activity may not proceed until the property owner or developer or his/her agent has received written approval of an SWM site plan from the municipality.
[Ord. No. 338, 1/10/2011]
1. The SWM site plan and SWM site report shall consist of all applicable
calculations, maps and plans. All SWM site plan materials shall be
submitted to Elizabethville Borough in a format that is clear, concise,
legible, neat and well organized; otherwise, the SWM site plan shall
be rejected.
2. Appropriate sections from the Municipal Subdivision and Land Development
Ordinance, and other applicable local ordinances, shall be followed
in preparing the SWM site plan.
A. The SWM site plan shall include (but not be limited to):
(1)
Plans no larger then twenty-four-inch by thirty-six-inch sheets
and in a form that meets the requirements for recording in the office
of the Recorder of Deeds of Dauphin County.
(2)
The name of the development; name and location address of the
property site; name, address, and telephone number of the applicant/owner
of the property; and name, address, telephone number, e-mail address,
and engineering seal of the individual preparing the SWM site plan.
(3)
The date of submission and dates of all revisions.
(4)
A graphical and written scale on all drawings and maps.
(5)
A North arrow on all drawings and maps.
(6)
A location map at a minimum scale of one inch equals 1,000 feet.
(7)
A metes-and-bounds description of the entire tract perimeter.
(8)
Existing and final contours at intervals of two feet.
(9)
Existing water bodies within the project area, including streams,
lakes, ponds, field-delineated wetlands or other bodies of water,
sinkholes, flood hazard boundaries (FEMA-delineated floodplains and
floodways), areas of natural vegetation to be preserved, the total
extent of the upstream area draining through the site, and overland
drainage paths.
(10)
The location of all existing and proposed utilities, on-lot
wastewater facilities, water supply wells, sanitary sewers, and water
lines on and within 50 feet of property lines.
(11)
A key map showing all existing man-made features beyond the
property boundary that may be affected by the project.
(12)
Soil names and boundaries with identification of the hydraulic
soil group classification.
(13)
The proposed limit of disturbance line and associated proposed
disturbed acres.
(14)
Proposed structures, roads, paved areas, and buildings, including
plans and profiles of roads and paved areas and floor elevations of
buildings.
(15)
Horizontal alignment, vertical profiles, and cross sections
of all open channels, pipes, swales and other BMPs.
(16)
The location and clear identification of the nature of permanent
stormwater BMPs.
(17)
The location of all erosion and sedimentation control facilities.
(18)
A minimum twenty-foot-wide access easement around all stormwater
management facilities that would provide ingress to and egress from
a public right-of-way. In lieu of providing an easement to the public
right-of-way, a note may be added to the plan granting the municipality
or its designees access to all easements via the nearest public right-of-way.
(19)
Construction details for all drainage and stormwater BMPs.
(20)
Construction details of any improvements made to sinkholes.
(21)
Identification of short-term and long-term ownership, operations,
and maintenance responsibilities.
(22)
Notes and Statements:
(a)
A statement, signed by the landowner, acknowledging that the
stormwater BMPs are fixtures that cannot be altered or removed without
prior approval by Elizabethville Borough.
(b)
A statement referencing the operation and maintenance (O&M)
agreement and stating that the O&M agreement is part of the SWM
site plan.
(c)
A note indicating that record drawings will be provided for
all stormwater management facilities prior to occupancy, or the release
of financial security.
(d)
The following signature block for the qualified professional
preparing the SWM site plan:
"I, __________, hereby certify that the stormwater management
plan meets all design standards and criteria of Elizabethville Borough's
Stormwater Management Ordinance."
B. The SWM site report shall include (but not be limited to):
(1)
The name of the development; name and location address of the
property site; name, address, and telephone number of the applicant/owner
of the property; and name, address, telephone number, e-mail address,
and engineering seal of the individual preparing the SWM site report.
(2)
A project description narrative, including expected project
time schedule.
(3)
A location map showing the project site and its location relative
to release rate districts.
(4)
Drainage area maps for all watersheds and inlets depicting the
time-of- concentration paths.
(5)
A detailed description of the existing site conditions. A detailed
site evaluation shall be completed for projects proposed in areas
of carbonate geology or karst topography and other environmentally
sensitive areas such as brownfields.
(6)
Complete hydrologic, hydraulic and structural computations,
calculations, assumptions, and criteria for the design of all stormwater
BMPs.
(7)
A description of, justification, and actual field results for
infiltration testing with respect to the type of test and test location
for the design of infiltration BMPs.
(8)
Calculations showing the total drainage area and impervious
area loading rates to each BMP.
(9)
The effect of the project (in terms of runoff volumes, water
quality, and peak flows) on surrounding properties and aquatic features
and on any existing municipal stormwater collection system that may
receive runoff from the project site.
(10)
A description of the proposed changes to the land surface and
vegetative cover, including the type and amount of impervious area
to be added.
(11)
All applicable worksheets from Chapter
8 of the BMP Manual when establishing volume controls.
(12)
Identification of short-term and long-term ownership, operation,
and maintenance responsibilities as well as schedules and costs for
inspection and maintenance activities for each permanent stormwater
or drainage BMP, including provisions for permanent access or maintenance
easements.
C. Supplemental information to be provided prior to recording of the
SWM site plan, as applicable:
(1)
Signed and executed operations and maintenance agreement (Appendix
A).
(2)
Signed and executed easements, as required for all on-site and
off-site work.
(3)
An erosion and sedimentation control plan and approval letter
from the Dauphin County Conservation District.
(5)
Permits from PADEP and ACOE.
(7)
A wetlands delineation report.
(8)
A highway occupancy permit from PennDOT when utilization of
a PennDOT storm drainage system is proposed or when proposed facilities
would encroach onto a PennDOT right-of-way.
[Ord. No. 338, 1/10/2011]
1. The applicant shall submit the SWM site plan and report for the regulated
activity.
2. Three copies of the SWM site plan and report shall be submitted to
Elizabethville Borough and may be distributed as follows:
A. Two copies for the Borough accompanied by the requisite review fee,
as specified in this chapter.
B. One copy for the Municipal Engineer.
3. Additional copies shall be submitted as requested by the Borough,
Tri-County Regional Planning Commission, Dauphin County Conservation
District or PADEP.
[Ord. No. 338, 1/10/2011]
1. Elizabethville Borough shall require receipt of a complete SWM site
plan and report as specified in this chapter. Elizabethville Borough
shall review the SWM site plan and report for consistency with the
purposes, requirements and intent of this chapter.
2. The municipality shall not approve any SWM site plan and report that
is deficient in meeting the requirements of this chapter. At its sole
discretion and in accordance with this Part, when an SWM site plan
and report is found to be deficient, Elizabethville Borough may disapprove
the submission and require a resubmission; or in the case of minor
deficiencies, the Borough may accept submission of modification.
3. Elizabethville Borough shall notify the applicant, in writing, within
45 calendar days whether the SWM site plan and report is approved
or disapproved if the SWM site plan and report is not part of a subdivision
or land development plan. If the SWM site plan and report involves
a subdivision or land development plan, the timing shall follow the
subdivision and land development process according to the Borough's
Planning Code.
4. Elizabethville Borough's Building Permit Office shall not issue
a building permit for any regulated activity if the SWM site plan
and report has been found to be inconsistent with this chapter, as
determined by the Borough. All required permits from PADEP must be
obtained prior to issuance of a building permit.
[Ord. No. 338, 1/10/2011]
1. A modification to a submitted SWM site plan and report for a development
site that involves a change in stormwater management facilities or
techniques, or that involves the relocation or redesign of stormwater
management facilities, or that is necessary because soil or other
conditions are not as stated on the SWM site plan as determined by
Elizabethville Borough, shall require a resubmission of the modified
SWM site plan in accordance with this chapter.
[Ord. No. 338, 1/10/2011]
1. A disapproved SWM site plan and report may be resubmitted, with the
revisions addressing the Borough's concerns documented in writing,
to the Borough in accordance with this chapter. The applicable review
fee must accompany a resubmission of a disapproved SWM site plan and
report.
[Ord. No. 338, 1/10/2011]
1. Elizabethville Borough's approval of an SWM site plan and report
authorizes the regulated activities contained in the SWM site plan
for a maximum term of validity of five years following the date of
approval. The Borough may specify a term of validity shorter than
five years in the approval for any specific SWM site plan. Terms of
validity shall commence on the date the Borough signs the approval
for an SWM site plan. If stormwater management facilities included
in the approved site have not been constructed, or if a record drawing
of these facilities has not been approved within this time, then the
Borough may consider the SWM site plan disapproved and may revoke
any and all permits or approvals.
[Ord. No. 338, 1/10/2011]
1. The applicant shall be responsible for providing record drawings
of all stormwater BMPs included in the approved SWM site plan. The
record drawings and an explanation of any discrepancies with the approved
SWM site plan shall be submitted to Elizabethville Borough.
2. The record drawings shall include a certification of completion signed
by a qualified professional verifying that all permanent stormwater
BMPs have been constructed according to the SWM site plan and report.
3. After receipt of the record drawings and certification of completion,
the Borough may conduct a final inspection.