If corrective action is necessary, within a reasonable period of
time, not to exceed 30 days, the owner shall take such corrective
action. If the owner does not take the required corrective action,
the Municipality may either perform the work, or contract for the
performance of the work and bill the owner for the cost of the work
plus a penalty of 10% of the cost of the work. If the owner does not
pay such bill within 30 days, the Municipality may file a municipal
claim against the property upon which the work was performed in accordance
with the applicable laws.