Exciting enhancements are coming soon to eCode360! Learn more 🡪
Township of Collier, PA
Allegheny County
By using eCode360 you agree to be legally bound by the Terms of Use. If you do not agree to the Terms of Use, please do not use eCode360.
Table of Contents
Table of Contents
[Ord. No. 703, 11/14/2018]
1. 
The municipality shall make the final determination on the continuing maintenance responsibilities prior to final approval of the SWM site plan. The municipality may require a dedication of such facilities as part of the requirements for approval of the SWM site plan. Such a requirement is not an indication that the municipality will accept the facilities. The municipality reserves the right to reject or accept the ownership and operating responsibility for any portion of the stormwater management controls.
2. 
Facilities, areas, or structures used as SWM BMPs shall be enumerated as permanent real estate appurtenances and recorded as deed restrictions or conservation easements that run with the land.
3. 
The O&M plan shall be recorded as a restrictive deed covenant that runs with the land.
4. 
The municipality may take enforcement actions against an owner for any failure to satisfy the provisions of this Part.
[Ord. No. 703, 11/14/2018]
1. 
Prior to final approval of the SWM site plan, the property owner shall sign and record an operation and maintenance (O&M) agreement (see Appendix B[1]) covering all stormwater control facilities which are to be privately owned.
A. 
The owner, successor and assigns shall maintain all facilities in accordance with the approved maintenance schedule in the O&M agreement.
B. 
The owner shall convey to the municipality conservation easements to assure access for periodic inspections by the municipality and maintenance, as necessary.
C. 
The owner shall keep on file with the municipality the name, address, and telephone number of the person or company responsible for maintenance activities; in the event of a change, new information shall be submitted by the owner to the municipality within 10 working days of the change.
D. 
The O&M agreement shall be substantially the same as the agreement in Appendix B. Other items may be included in the agreement where determined by the municipality to be necessary to effectuate the satisfactory operation and maintenance of the BMPs, including but not limited to the addition of homeowners' associations as signatories where BMPs are located on a privately owned lot and serve other lots within the development.
E. 
If BMPs servicing a development are located off site, then both the owner of the property being served and the owner of the property where the BMPs are located shall sign the O&M agreement.
F. 
If the property owner fails to record the O&M agreement, the municipality may do so at the owner's expense.
2. 
The owner is responsible for operation and maintenance (O&M) of the SWM BMPs. If the owner fails to adhere to the O&M agreement, the municipality may perform the services required and charge the owner appropriate fees. Nonpayment of fees may result in a lien against the property.
[Ord. No. 703, 11/14/2018]
For SWM site plans that involve subdivision and land development, the applicant shall provide a financial guarantee to the municipality for the timely installation and proper construction of all stormwater management controls as required by the approved SWM site plan and this chapter in accordance with the provisions of Sections 509, 510, and 511 of the Pennsylvania Municipalities Planning Code.[1]
[1]
Editor's Note: See 53 P.S. §§ 10509, 10510 and 10511.