[HISTORY: Adopted by the Borough Council of the Borough of
Prospect as indicated in article histories. Amendments noted where
applicable.]
Table of Contents
Table of Contents
- Administrative Legislation
- Ch 1 General Provisions
- Ch 6 Auditor
- Ch 18 Emergency Management
- Ch 25 Fire Company
- Ch 27 Firemen's Relief Association
- Ch 44 Planning Commission
- General Legislation
- Ch 90 Animals
- Ch 95 Buildings, Demolition of
- Ch 97 Burning, Open
- Ch 103 Businesses, Sex and Drug-Oriented
- Ch 114 Construction Codes, Uniform
- Ch 120 Curfew
- Ch 145 Firearms and Weapons
- Ch 152 Floodplain Management
- Ch 159 Grading and Excavations
- Ch 168 Housing
- Ch 186 Municipal Claims and Liens
- Ch 193 Noise
- Ch 201 Numbering of Buildings
- Ch 209 Parks and Recreation Areas
- Ch 220 Property Maintenance
- Ch 226 Public Property
- Ch 237 Sewers and Sewage Disposal
- Ch 251 Solid Waste
- Ch 257 Stormwater Management
- Ch 262 Streets and Sidewalks
- Ch 262 Art I Excavations and Openings
- ยงย 262-1 Definitions and interpretation.
- ยงย 262-2 Permit required.
- ยงย 262-3 Application for permit.
- ยงย 262-4 Permit fee.
- ยงย 262-5 Issuance of permits restricted.
- ยงย 262-6 Information contained on permit.
- ยงย 262-7 Permit approval.
- ยงย 262-8 Responsibility to contact utilities.
- ยงย 262-9 Refilling and restoration of surface; responsibility for defects.
- ยงย 262-10 Responsibility of work; costs.
- ยงย 262-11 Maintenance of traffic.
- ยงย 262-12 Requirements for work; correction of unsatisfactory work; completion of work.
- ยงย 262-13 Emergency openings.
- ยงย 262-14 Restrictions regarding trees and shrubbery.
- ยงย 262-15 Work necessitating opening or excavation to be done prior to street improvement and not until five years thereafter; exception.
- ยงย 262-16 Permittee responsibilities for future relocation of work.
- ยงย 262-17 Conditions for laying and extending utility lines.
- ยงย 262-18 Bond required; guarantee; correction of defects.
- ยงย 262-19 Payment for work done by Borough.
- ยงย 262-20 Violations and penalties.
- ยงย 262-21 Applicability.
- ยงย 262-22 Insurance.
- Ch 262 Art II Befouling by Motor Vehicles
- ยงย 262-23 Proper operation of vehicles.
- ยงย 262-24 Befouling of streets unlawful.
- ยงย 262-25 Violations and penalties.
- Ch 262 Art III Sidewalk Obstructions
- ยงย 262-26 Responsibility for keeping clear and safe.
- ยงย 262-27 Sidewalks to be kept clear of obstructions.
- ยงย 262-28 Snow and ice removal.
- ยงย 262-29 Abatement of nuisance by Borough.
- ยงย 262-30 Violations and penalties.
- Ch 262 Art IV Sidewalk and Curb Maintenance
- ยงย 262-31 Sidewalk Master Plan Report.
- ยงย 262-32 Compliance required.
- ยงย 262-33 Maintenance obligations.
- ยงย 262-34 Inspections; notices.
- ยงย 262-35 Property owner to repair; time limits.
- ยงย 262-36 Construction and repair on initiative of property owner.
- ยงย 262-37 Repair and maintenance specifications.
- ยงย 262-38 Supports under sidewalks and curbs.
- ยงย 262-39 Permit required.
- ยงย 262-40 Action upon failure to repair.
- ยงย 262-41 Violations and penalties.
- Ch 262 Art V Driveways
- ยงย 262-42 Title.
- ยงย 262-43 Definitions.
- ยงย 262-44 Permit requirements.
- ยงย 262-45 Fees.
- ยงย 262-46 Location restriction; number of driveways; driveway approaches.
- ยงย 262-47 Design standards.
- ยงย 262-48 Correction of improper work.
- ยงย 262-49 Violations and penalties.
- Ch 268 Subdivision and Land Development
- Ch 275 Taxation
- Ch 282 Transient Retail Business
- Ch 289 Vehicles and Traffic
- Ch 310 Zoning
- Derivation Table
- Ch DT Derivation Table
- Disposition List
- Ch DL Disposition List