Exciting enhancements are coming soon to eCode360! Learn more 🡪
Town of Fishkill, NY
Dutchess County
By using eCode360 you agree to be legally bound by the Terms of Use. If you do not agree to the Terms of Use, please do not use eCode360.
Table of Contents
Table of Contents
[1]
Editor's Note: This article was renumbered from Art. XIV to Art. XIVA 10-20-2021 by L.L. No. 6-2021.
As required by § 239-y of the General Municipal Law, a subdivision plan, site plan or special permit application shall be submitted to the Town Conservation Board for review where the land in question appears within an open area shown on the Town Open Space and Natural Resource Index.
These open areas shall include the following:
A. 
All designated streams, intermittent streams, lakes, ponds and wetlands and lands adjacent to them.
B. 
All designated forest lands specifically outlined on the index as "open space."
C. 
All lands overlying those areas designated on the index as aquifers.
Each application shall be referred to the Town Conservation Board by the Building Inspector within five days of the date of application. Within 45 days of the date of referral, the Town Conservation Board shall make its review and forward its recommendations to the appropriate Town agency. The receiving agency shall take no action on said application within the forty-five-day period without having received and reviewed these recommendations.