Exciting enhancements are coming soon to eCode360! Learn more 🡪
Township of North Strabane, PA
Washington County
By using eCode360 you agree to be legally bound by the Terms of Use. If you do not agree to the Terms of Use, please do not use eCode360.
[Ord. No. 376, 7/24/2018]
Rezoning can be initiated to protect the safety, capacity and efficiency of the Township's existing infrastructure systems; to maintain fiscal responsibility; and to uphold the objectives of the North Strabane Township Comprehensive Plan. See also the Pennsylvania Municipalities Planning Code § 27-609.
[Ord. No. 376, 7/24/2018]
Rezoning applications are completed on the official forms provided by the Zoning Officer. All applicants submitting rezoning applications are required to prepare a series of plans, analyses and reports as enumerated below to demonstrate the compatibility of a rezoning proposal.
[Ord. No. 376, 7/24/2018]
1. 
The Zoning Officer:
A. 
Will perform a review of the application and packet for completeness. An incomplete or insufficient application and packet will be returned to the applicant. A completed application and packet will be forwarded to the Township Planning Commission for review.
B. 
Will provide the applicant a letter within seven business days stating that the application has been submitted with all required information attached.
2. 
As part of the rezoning approval process, the Township Planning Commission and Board of Supervisors can consider the motivation and implications of each plan, analysis and report.
3. 
The Township Planning Commission:
A. 
Will consider any projected beneficial and/or detrimental effects on the Township and may hold a public hearing on the application, if they deem it applicable.
B. 
Will submit a written recommendation either in favor or not in favor of the rezoning proposal including a specific statement as to whether or not the proposed rezoning is in accordance with the objectives of the North Strabane Township Comprehensive Plan.
C. 
Will forward Township Board of Supervisors a recommendation for the nature of action regarding rezoning.
4. 
The Township Board of Supervisors will hold a public hearing on the application and compose a brief summary explanation of its decision and forward the decision and explanation to the applicant. Upon rezoning approval, the Zoning Officer will update the Zoning Map accordingly.
5. 
Washington County Planning Commission shall review such requests and provide comments, as necessary.
[Ord. No. 376, 7/24/2018]
1. 
Application Requirements. The plans and reports that a landowner and/or developer are to submit shall include:
A. 
Conceptual site development plan.
B. 
Topographic survey.
C. 
Site conditions report.
D. 
Estimated infrastructure (sanitary sewer and potable water) demands (gallons per day).
E. 
Off-street parking projections (number of parking spaces) available on site.
F. 
A summary of anticipated impacts on adjoining lots including but not limited to noise, vibration, night-time lighting, service area locations and visibility, hours of operation.
G. 
Existing zoning of surrounding parcels and closest adjacency of zoning district identical to request.
H. 
Classifications of existing roadways/streets adjacent to and within 300 feet of the perimeter of the proposed site.
I. 
Calculation of average daily trips and peak hour trips proposed to be generated by development on the lot as presented on a proposed sketch plan as enabled by the PA Municipalities Planning Code. The most current edition of the Institute of Transportation Engineers' Trip Generation Manual shall be used as part of said calculation.
J. 
Calculation of average daily trips and peak hour trips proposed to be generated based upon proposed conceptual site development plan.
K. 
The percentage of proposed dwelling units and any associated limitations that are specific to a particular segment of potential residential demographics/socioeconomics.
L. 
Depending upon the location of lot access, infrastructure service/demands and impacts identified on adjoining lots, the Township may require a landowner and/or developer to prepare other potential related studies such as:
(1) 
Traffic-related studies.
(2) 
Fiscal impact analysis.
(3) 
Density comparison to base zoning.
(4) 
Geotechnical/stormwater analysis.
2. 
The Township will evaluate the proposed development of the proposed zoning in relationship to the potential development in the existing zoning. The Township Planning Commission and Township Board of Supervisors reserve the right to require additional information as part of the review and approval processes in order to evaluate the applicability of the rezoning.