1.
Survey monuments, bench marks and lot pins shall be provided in all subdivisions. Permanent concrete or durable stone monuments 30 inches by six inches shall be set at all boundary corners, angle points of boundary and such intermediate points as may be required by the Borough Engineer. Bench marks shall be placed on all monuments in the streets based on the U.S. Coast and Geodetic Sandy Hook Datum. All lot corners shall be staked and plainly marked with oak or metal pins, where feasible.
2.
The installation and certification shall be made by a registered surveyor prior to the approval of the subdivision. In lieu of such prior installation, the applicant shall furnish a cash deposit in the form of a certified check to guarantee the proper installation of the required monuments and bench marks. The refundable deposit shall be in the amount of $200 per required survey monument.
3.
The location and tie-in dimensions of all monuments shall be shown on the plan for recording. No public improvements shall be accepted by the Borough until all monuments have been set and certified to by a registered surveyor.