[1]
Editor's Note: Ord. No. 558-2016 dissolved the Woodbine Port Authority.
Volume of Water — Gallons | Rate Per Gallons |
|---|---|
0 — 6,000 | $35 (Minimum) |
6,001 — 20,000 | $2.25 |
20,001 — 100,000 | $2.50 |
100,001 and over | $3 |
Water Main Connection Size | Charge |
|---|---|
4 inch to and including 6 inch | $60 per month |
Water mains greater than 6 inch | $120 per month |
Meter Size | Charges per Month |
|---|---|
1 inch to and including 3 inches | $60 |
Greater than 3 inches | $120 |
Volume of Water — Gallons Metered per Quarter | Rate per 1,000 Gallons |
|---|---|
0 — 6,000 | $35 (Minimum) |
6,001 — 20,000 | $2.25 |
20,001 — 100,000 | $2.50 |
100,001 and over | $1.75 |