A.
A permit is required for all development in any floodplain zone. It shall be granted only after all necessary permit applications are submitted to federal and state agencies. The Town of Delmar will not allow new structures to be built within the 100-year floodplain zone. Receipt of federal and state permits does not exempt development from the provisions of this chapter.
B.
Any application for a permit must demonstrate that no structure will be placed in the 100-year floodplain zone by showing the location of all proposed structures in relation to the floodplain zone boundary if the property is within the 100-year floodplain zone.
C.
Subdivision of land does not exempt the land from the prohibition that no new structure will be placed in the floodplain zone.
D.
Additions are only allowed within the original building footprint design and must not constitute a substantial improvement.