A.
Whenever a subdivision of land or land development is desired to be affected in the Township of Upper Allen, Cumberland County, Pennsylvania, a plan of the layout shall be prepared, filed and processed with the Planning Commission and the Board of Commissioners of Upper Allen Township according to the requirements of this chapter.
(1)
A lot add-on subdivision plan that does not create any additional lots may receive Township Planning Commission approval. The Planning Commission, upon approval or denial, shall give notice to the developer in accordance with the Pennsylvania Municipalities Planning Code.[1] The lot add-on shall meet the following requirements:
(a)
The existing parcel of land may be added, in whole or in part, to another existing lot for the sole purpose of increasing the lot size, provided that:
[1]
The parcel to be added shall be contiguous to the existing lot; and
[2]
The lot created shall be conveyed to the adjoining property owner and shall be considered an extension of that property owner's original lot; and
[3]
The plan shall not create a nonconforming lot; and
[4]
The plan shall not alter street alignments, drainage easements, stormwater management facilities, storm sewer facilities, or other rights-of-way; and
[5]
Access to all affected lots are not changed.
(b)
The plan shall be prepared in accordance with applicable final plan requirements of this chapter, except a separate preliminary plan need not be filed.
(c)
If a waiver or modification of this chapter has been requested, then review by the Board of Commissioners of Upper Allen Township is mandatory.
[1]
Editor's Note: See 53 P.S. § 10101 et seq.
B.
Each applicant shall follow the procedures for the submission and processing of plans and specifications for such plans as set forth in this article.