For the purpose of this article, the following terms, phrases, words, and their derivations shall have the meanings given herein:
Any person making written application for the permit hereinafter mentioned.
A concrete, block or asphalt edging along a road used to direct surface water runoff.
Any alteration, change or impact to property.
A privately owned access from the road to the property.
To dig up, break, tunnel or undermine in any manner any type of surface.
The document approving any construction/alteration or working within the right-of-way as defined herein.
Any person who has been granted and has in full force and effect an excavation permit issued hereunder.
The area designated under the Map Filing Law, Land Use regulation or other established legal document as reserved for property access, public improvements and public utilities.
Any street, avenue, terrace, court, way, alley, cartway, or public thoroughfare that is within the right-of-way.
An activity involving physical effort including but not limited to excavation, digging, tunneling, backfilling, placement of material, concrete pouring and paving or construction of any type in order to achieve a purpose or result.