Inspections of systems by the Health Agent prior to back filling are required.
Request for inspections require a minimum of 48 hours' prior notice.
All engineers must submit an as-built plan prior to the inspection. Engineers and installers shall certify, in writing, that the septic system was installed according to the original plan and meets all the requirements of Title V and local regulations.
The installer will have sufficient water at the site to test distribution box water flow.
A certificate of compliance is necessary in order to obtain an occupancy permit from the Building Inspector.