Permit and inspection fee: $50.00 each.
(Ordinance 21-53 adopted 9/7/21; Ordinance 22-46 adopted 9/6/2022; Ordinance 23-63 adopted 9/19/2023; Ordinance 24-43 adopted 8/20/2024)
(a) 
Initial fees: $100.00.
(b) 
Renewal fees: $100.00.
(c) 
Registration suspension appeal fee: $100.00.
(d) 
Lapsed registration fee: $50.00.
(Ordinance 21-53 adopted 9/7/21; Ordinance 22-46 adopted 9/6/2022; Ordinance 23-63 adopted 9/19/2023; Ordinance 24-43 adopted 8/20/2024)
(a) 
Fees for building permits double if work on the project begins prior to issuance of the permit. All permit fees are to be paid in advance by the licensed party who applies for the permit. Building valuation is determined by the International Code Council (ICC) Building Valuation Data Table (BVD). This calculation takes the total square feet of a structure multiplied by the amount found on the BVD table for the building group and construction type.
(b) 
Other inspections and fees.
(1) 
Inspections outside of business hours: $100.00 per hour (minimum charge-two hours).
(2) 
Reinspection fees: $50.00 per hour.
(3) 
Inspections for which no fee is specifically indicated: $50.00 per hour.
(4) 
Commercial plan review: $75.00 per hour.
(5) 
Additional plan review required by changes, additions or revisions to plans: $50.00 per hour.
(6) 
For use of outside consultants for plan checking and inspections or both: Actual costs.
(7) 
Residential plan review: $50.00 per hour.
(8) 
Permit issuance fee: $30.00.
(c) 
Miscellaneous.
(1) 
Carport, garages, sheds, patio covers, portable buildings: $50.00 + $0.03 per sq. ft.
(2) 
Sprinkler/irrigation system:
(A) 
Residential: $40.00 each.
(B) 
Commercial: $40.00 each + $7.00 per spray zone.
(3) 
Approach (pouring drive): $70.00 each.
(4) 
Curb cut: $30.00 each.
(5) 
Tent permit: $50.00 each.
(6) 
Temporary and seasonal sales permit: $75.00 each.
(7) 
Storm shelter:
(A) 
Less than 201 sq. ft.: $50.00.
(B) 
Greater than 200 sq. ft.: $100.00.
(8) 
Reroofing:
(A) 
Residential:
(i) 
Up to 3,000 sq. ft.: $100.00.
(ii) 
Over 3,000 sq. ft.: $150.00.
(B) 
Commercial:
(i) 
1–5,000 sq. ft.: $150.00.
(ii) 
5,001–10,000 sq. ft.: $250.00.
(iii) 
10,001–25,000 sq. ft.: $350.00.
(iv) 
Over 25,000 sq. ft.: $500.00.
(9) 
Not securing permit prior to beginning construction: 2 x permit fee.
(10) 
Removal of a stop-work order: $100.00.
(11) 
Commercial certificates of occupancy (CO):
(A) 
CO fee: $100.00.
(B) 
CO reinspection fee after 2nd inspection: $50.00.
(C) 
Temporary CO (temporary certificate of occupancies are valid for 180 days): $200.00.
(D) 
Temporary CO for seasonal sales (temporary certificate of occupancies are valid for 180 days): $30.00.
(E) 
Safety inspections: $50.00.
(F) 
Extension of temporary CO (extensions on temporary certificate of occupancies are valid for 90 days): $300.00.
(G) 
Duplicate or recreation of a CO: $75.00.
(12) 
Fence permit: $10.00.
(13) 
Retaining wall permit: $50.00.
(14) 
Construction trailer: $50.00.
(15) 
Sales trailer: $50.00.
(16) 
Floodplain development permit: $100.00.
(d) 
Fire.
(1) 
Fire sprinkler: $250.00 each.
(2) 
Fire hood (fire supp. system): $100.00 each.
(3) 
Licensed facility inspections:
(A) 
Hospital: $200.00 per building.
(B) 
Assisted living/nursing home: $150.00 per building.
(C) 
Day-care/foster home: $100.00 per building.
(D) 
Group home: $50.00 per building.
(4) 
Fire sprinkler underground: $100.00.
(e) 
Replacement or installation of a new gasoline diesel tank.
(1) 
Underground: $100.00.
(2) 
Aboveground: $100.00.
(3) 
Removal only: $50.00.
(4) 
Storage of hazmat over 110 gallons: $150.00 per year.
(f) 
Replacement or installation of a compressed natural gas or propane gas tank.
(1) 
Underground: $50.00.
(2) 
Aboveground: $50.00.
(3) 
Removal only: $0.00.
(Ordinance 20-40 adopted 9/1/20; Ordinance 21-53 adopted 9/7/21; Ordinance 21-68 adopted 11/16/21; Ordinance 22-46 adopted 9/6/2022; Ordinance 23-63 adopted 9/19/2023; Ordinance 24-43 adopted 8/20/2024)
(a) 
Residential/single- or two-family unit: $50.00 + $0.03 per sq. ft.
(b) 
Commercial or multifamily (3+) units:
(1) 
1–2,000 sq. ft.: $100.00 each.
(2) 
2,001–5,000 sq. ft.: $150.00 each plus $0.03 per sq. ft.
(3) 
5,001 sq. ft. or more: $215.00 each plus $0.045 per sq. ft.
(c) 
Alterations/repairs:
(1) 
Minimum fee:
(A) 
Residential unit (single- or two-family) first fixture: $40.00 each.
(B) 
Commercial or multifamily (3+) units first fixture: $75.00 each.
(2) 
Additional fixtures: $3.00 each.
(3) 
Mobile home/trailer H/U: $15.00 + $10.00 each additional unit.
(4) 
Installation of wiring: $15.00 + $10.00 each additional unit.
(5) 
Service change out 200 amps or less: $40.00.
(6) 
Service change out over 200 amps: $75.00.
(7) 
Panel replacement: $40.00.
(8) 
Installation of solar panels: $50.00.
(d) 
Electric meter base charges:
(1) 
100 amp single phase overhead: $65.00.
(2) 
200 amp single phase overhead: $100.00.
(3) 
200 amp single phase underground: $100.00.
(4) 
200 amp three phase 7 prong: $225.00.
(5) 
320 amp single phase 4 prong: $535.00
(6) 
320 amp three phase 7 prong: $535.00
(7) 
6 prong single phase CT socket: $155.00.
(8) 
13 prong three phase CT socket: $385.00.
(9) 
Current transformer metering (CTs) - 400/5, 500/5: Actual cost.
(e) 
Electric meter set fees:
(1) 
Form 1S, 2S: $345.00 each.
(2) 
Form 2SE, 12S, 14S, 15S: $575.00 each.
(3) 
Form 3S, 4S, 6S, 8S, 9S, 16S, 16SE, 36S: Actual cost.
(f) 
Other electric fees:
(1) 
Pool: $50.00.
(2) 
New service: $25.00.
(3) 
Electric temporary pole inspection: $25.00.
(4) 
Temporary cut-in inspection: $75.00.
(5) 
[Reserved.]
(6) 
Install of a disconnect: $50.00.
(Ordinance 20-40 adopted 9/1/20; Ordinance 22-46 adopted 9/6/2022; Ordinance 23-63 adopted 9/19/2023; Ordinance 24-43 adopted 8/20/2024)
(a) 
Total square feet:
(1) 
0–500 sq. ft.: $40.00.
(2) 
501–1,500 sq. ft.: $60.00.
(3) 
1,501–2,000 sq. ft.: $80.00.
(4) 
2,001–2,500 sq. ft.: $100.00.
(5) 
2,501–3,000 sq. ft.: $120.00.
(6) 
Over 3,000 sq. ft.: $120.00 + $25.00 for each additional 1,000 sq. ft. or fraction thereof.
(b) 
Installation or change out (water heater change out, water softener install, grease trap, grinder pump, water line, sewer line, etc.): $40.00.
(c) 
Annual gas test: $50.00 per building.
(Ordinance 20-40 adopted 9/1/20; Ordinance 22-46 adopted 9/6/2022; Ordinance 23-63 adopted 9/19/2023; Ordinance 24-43 adopted 8/20/2024)
(a) 
Residential (single- or two-family units):
(1) 
Residential: $75.00 each.
(2) 
Repairs or change-out of unit: $45.00 each.
(b) 
Commercial or multifamily (3+) units:
(1) 
Multifamily (3+) per unit: $40.00 each.
(2) 
Commercial:
(A) 
0–3,000 sq. ft.: $75.00.
(B) 
3,001–10,000 sq. ft.: $125.00.
(C) 
10,001 + sq. ft.: $150.00 each + $25.00 for each additional 1,000 sq. ft. or fraction thereof.
(c) 
Change-out of units: $45.00 each unit.
(Ordinance 20-40 adopted 9/1/20; Ordinance 22-46 adopted 9/6/2022; Ordinance 23-63 adopted 9/19/2023; Ordinance 24-43 adopted 8/20/2024)
(a) 
New construction:
(1) 
Nonilluminated: $9.00 + $0.50 per sq. ft. ($25.00 minimum).
(2) 
Illuminated: $9.00 + $1.00 per sq. ft. ($25.00 minimum).
(3) 
Portable/temporary: $10.00 each.
(4) 
Banners/flags: $10.00 each.
(5) 
Outline lighting: $25.00 each.
(6) 
Inspections: $9.00 each.
(7) 
Miscellaneous renovations: $25.00 each.
(b) 
Alterations: Same as new construction.
(c) 
Fee for return of illegally placed sign:
(1) 
First offense: $50.00.
(2) 
Second offense: $100.00.
(3) 
Additional offenses: $100.00 + admin. costs.
Political campaign signs during appropriate seasons are exempt.
(d) 
Sign removal administrative fee pursuant to zoning ordinance, section 7.2.G: $350.00.
(Ordinance 19-88 adopted 12/3/19; Ordinance 20-40 adopted 9/1/20; Ordinance 21-53 adopted 9/7/21; Ordinance 22-46 adopted 9/6/2022; Ordinance 23-63 adopted 9/19/2023; Ordinance 24-43 adopted 8/20/2024)
$100.00 per hour (minimum charge for two (2) hours).
(Ordinance 20-40 adopted 9/1/20; Ordinance 22-46 adopted 9/6/2022; Ordinance 23-63 adopted 9/19/2023; Ordinance 24-43 adopted 8/20/2024)
House moving/demolition permit: $65.00 + any costs incurred to remove power lines.
(Ordinance 20-40 adopted 9/1/20; Ordinance 22-46 adopted 9/6/2022; Ordinance 23-63 adopted 9/19/2023; Ordinance 24-43 adopted 8/20/2024)
Appeal processing fee: $25.00 per appeal.
(Ordinance 20-40 adopted 9/1/20; Ordinance 22-46 adopted 9/6/2022; Ordinance 23-63 adopted 9/19/2023; Ordinance 24-43 adopted 8/20/2024)