There is hereby adopted by the city council a prevailing wage
schedule for contracted work performed on municipally owned facilities
at thresholds above $25,000.00 for construction and above $15,000.00
for maintenance, alteration, repair and demolition work, attached
to the ordinance from which this section is derived as exhibit A and
made a part hereof, including appendices thereto, save and except
such portions as are herein deleted, modified or amended, and to the
same extent are hereby adopted and incorporated as fully as if set
out at length herein, and the provisions thereof shall be controlling,
and the same is hereby adopted.
(Ordinance 14-735, sec. 1, adopted 6/3/14; 2007 Code, sec. 2-271)