(a)
General application requirement.
Construction plans shall be prepared by or under the supervision of a professional engineer or architect licensed in the state as required by state law governing such professions. Plans submitted for review by the city shall be dated and bear the responsible engineer’s or architect’s name, serial number and the designation of “engineer,” “professional engineer” or “P.E.” or “architect” and an appropriate stamp or statement near the engineer’s or architect’s identification, stating that the documents are for preliminary review and are not intended for construction. Final plans shall bear the seal and signature of the engineer or architect and the date signed on all sheets of the plans. Public works construction in streets, alleys or easements which will be maintained by the city shall be designed by a professional engineer licensed in the state.
(b)
Construction plan review procedure.
Copies of the construction plans, and the required number of copies of the preliminary plat, shall be submitted to the city engineer for final approval. The plans shall contain all necessary information for construction of the project, including screening walls and other special features. All materials specified shall conform to the standard specifications and standard details of the city. Each sheet of the plans shall contain a title block including space for the notation of revisions. This space is to be completed with each revision to the plan sheet and shall clearly note the nature of the revision and the date the revision was made. The city engineer will release the plans for construction, after approval of the preliminary plat by the commission subject to review and approval by city council and payment of all inspection fees. Upon such release, each contractor shall maintain one set of plans, stamped with city release, at the project site at all times during construction.
(c)
Failure to commence construction.
If commencement of construction has not occurred within one (1) year after approval of the plans, resubmittal of plans may be required by the city engineer for meeting current standards and engineering requirements. For purposes of this section “commencement of construction” shall mean (i) issuance of construction permit(s); and (ii) grading of the land.
(Ordinance 2006-07-00567, sec. 1, adopted 7/7/06; Ordinance 2021-11-00939 adopted 11/4/21)