[2-28-2022 by Ord. No. 08-2022]
The Public Works Director shall examine all final plats within the Village and may make, or cause to be made by a professional land surveyor under the supervision or direction of the Public Works Director, field checks for the accuracy and closure of survey, proper type and location of monuments, and liability and completeness of the drawing. In addition:
(a) The maximum error of closure before adjustment of the survey of the exterior boundary of the subdivision shall not exceed that which is permitted by §
236.15(2) of the Wisconsin Statutes. When a satisfactory closure of the field measurements has been obtained, the survey of the exterior boundary shall be adjusted to form a closed geometric figure.
(b) All street, block, and lot dimensions shall be computed as closed geometric figures based upon the control provided by the closed exterior boundary survey.
(c) The Village Board shall receive the results of the Public Works Director's examination prior to approving the final plat. The Public Works Director may, however, in accordance with §
74-2.7(c) of this Ordinance, waive the placing of monuments for a reasonable time, not to exceed one year, on condition that the subdivider provide a letter of credit, certified check, or surety bond equal to the estimated cost of installing the monuments, to ensure the placing of such monuments within the time required by statute. In that case, the Public Works Director's examination required under this section and any related field checks shall be made after the required monuments have been installed. The letter of credit, certified check, or surety bond concerned shall not be released until the Public Works Director is satisfied with the accuracy of the land surveying concerned.