(a)
Whenever the required repair, vacation or demolition is not commenced within thirty (30) days after the effective date of any order, the building, structure or premises shall be posted as follows:
UNSAFE BUILDING DO NOT OCCUPY It shall be punishable by law to occupy this building or remove or deface this Notice (Specify the applicable ordinance and the penalty for violation thereof) Building Official City of Brenham |
(b)
Subsequent to posting the building, the building official may cause the building to be repaired to the extent required to render it safe, or if the notice required demolition, to cause the building or structure to be demolished and all debris removed from the premises. The cost of repair or demolition shall constitute a lien on the premises as provided in this article.
(c)
Any monies received from the sale of a building or from the demolition thereof, over and above the cost incurred, shall be paid to the owner of record or other persons lawfully entitled thereto.
(Ordinance O-24-019 adopted 8/15/2024)