(a) 
Permit fees shall be as follows:
(1) 
Septic (new or replacement system) $500.00.
(2) 
Septic repair or modification $300.00.
(3) 
Septic reinspection (per inspection):
(A) 
New installs: $300.00.
(B) 
Repair or modifications: $275.00.
(4) 
Water samples $300.00.
(5) 
Complaints (per complaint) $225.00.
(6) 
Administrative duties (per hour) $30.00.
(b) 
The above fees may require additional reinspections and are subject to 100 percent of all engineering fees incurred by the applicant. Final approval of on-site sewage disposal systems shall not be granted until all fees are paid.
(Ordinance 21-02 adopted 1/19/21)