(a)
Required; application; fee.
No person shall move any building or structure, except portable storage buildings not greater than 12 feet in width and not greater than 24 feet in length, and not greater than 12 feet in height, over, across or along any street, public way or public place or across any lot line within the corporate limits of the city until a permit for such work has been issued by the building official. Written application for such permit shall be filed with the building official at least 24 hours prior to the actual moving of the structure. Said application shall contain a description of the building or structure to be moved, with the extreme dimensions of its width, length and height, its present location and proposed new location by lot, block, subdivision and street number. The fee for such permit shall be as prescribed in appendix A of this code.
(b)
Conditions.
The following conditions must be met for all moving of buildings or structures:
(1)
No building or structure shall be moved within the city limits from one location to another, nor shall any building or structure be moved from outside the city limits to within, unless such structure meets all applicable codes and has been approved by the building official.
(1988 Code, ch. 3, sec. 9.01; Ordinance adopted 12/14/59; Ordinance 1986-30, adopted 12/23/86; 2010 Code, sec. 10-379)