The following words, terms and phrases, when used in this article, shall have the meanings ascribed to them in this section, except where the context clearly indicates a different meaning:
The actual user of a town sanitary sewer connection.
The distance of the lot line or tract side to which sewer mains are connected.
Sewer mains totally outside of and not adjacent to a tract of land to be subdivided and developed for resale.
Sewer mains totally within or adjacent to a tract of land to be subdivided and developed for resale.
A charge made against the consumer or property owner to pay for a portion of the cost of installation or extension of sanitary sewer mains, as provided for in this article.
The record title holder of premises served with sanitary sewer by the town.
The Town of Copper Canyon, Texas, together with all its governing and operating bodies.
That portion of the town designated as the town center in the Copper Canyon Master Plan, as amended, and shall never include any property located outside the corporate limits of the town.
(Ordinance 14-005 adopted 6/9/14)