(a) General contractor (annual): $150.00.
(b) Water well driller (annual): $100.00.
(d) Irrigation contractor (annual): $100.00.
(Ordinance 06-225, sec. 1, adopted 6/12/06; Ordinance 19-014, sec. 3, adopted 10/14/19; Ordinance 24-009 adopted 10/28/2024)