Minimum fee for any permit is $100.00 unless otherwise specified.
(b)
No refunds will be issued for permit fees.
(c)
100% of any outside service costs will be charged, including but not limited to engineering plan review.
(d)
All fees (building permit, impact fee, meter, etc.) will be paid prior to each building permit being issued.
(e)
Work started without a permit: Permit fee $ x 2.
(f)
Stop-work order - red tag: $50.00.
(g)
Permit replacement: $25.00.
(h)
Re-stamp fee: $30.00/hour (minimum $30.00).
(i)
Addendum review fee: $50.00/hour/inspector (minimum $50.00).
(j)
Structure demolition: $100.00.
(k)
Interior finish demolition: $100.00.
(l)
Structure moving permit: $150.00. If applicable, plumbing, electrical and mechanical permits are required. A bond in the amount of $50,000.00 shall be required. For further bond information see section 16.04.062 of the Code of Ordinances.
(m)
Commercial fence permit: $150.00.
(n)
Residential one- and two-family dwellings, new, additions, remodels:
(1)
Building permit: $0.64 per total square feet of structure (minimum $100.00). Calculate the permit fee by multiplying $0.64 x square footage.
(2)
Service inspection certificate fee of $30.00 for each single-family residence permit.
(3)
Mechanical, electrical, plumbing fees for trade permits: $100.00.
(4)
Residential flatwork, new, addition, alteration permit: $100.00.
(5)
Residential irrigation: $150.00.
(7)
New additions, remodels, alterations: $0.64 per total square feet of structure (minimum $100.00).
(8)
Antenna's: $150.00.
(9)
Arbor/patio covers: $100.00.
(10)
Deck: $100.00.
(11)
Foundation repair: $75.00.
(12)
Outdoor fire pit or fireplace: $100.00.
(13)
Outdoor kitchen: $100.00.
(14)
Retaining wall/screen wall: $100.00.
(15)
Roof replacement: $150.00.
(16)
Solar panels: $100.00.
(17)
Window replacement: $150.00.
(18)
Fence permit: $100.00.
(o)
Commercial projects: new, addition, alteration, or interior finish and multifamily dwellings:
(1)
Building permit: $10.00 per $1,000.00 valuation of work (minimum $100.00). Calculate the building permit fee by multiplying the valuation of work by 0.010.
(2)
When applicable, add mechanical, electrical, plumbing fees to building permit. MEP fees are calculated by the addition of the following for each trade:
Calculated by Square Footage Per Trade | |
|---|---|
0–100,000 square feet | $100.00 |
Over 100,001 square feet | $120.00 |
(3)
Mechanical, electrical, plumbing fees for single trade permits: $100.00.
(4)
Commercial irrigation: $250.00.
(p)
City initiated capital projects:
(Ordinance 13-05-949, sec. 2.100, adopted 5/7/13; Ordinance adopting 2015 Code; Ordinance 16-09-1022 adopted 9/20/16; Ordinance 18-09-1100 adopted 9/18/18; Ordinance 19-06-1132 adopted 6/18/19; Ordinance 19-11-1147 adopted 11/19/19; Ordinance 20-09-1175 adopted 9/15/20; Ordinance 22-09-1281 adopted 9/6/2022; Ordinance 24-09-1368 adopted 9/3/2024; Ordinance 25-09-1391 adopted 9/2/2025; Ordinance 25-09-1394 adopted 9/16/2025)