All installation hereafter installed within the corporate limits of the city shall be done in a first class workmanlike manner in accordance with the 2015 edition of the International Plumbing Code as adopted by the International Code Council, and said International Plumbing Code and incorporated references and appendixes is made of part of this article, with the additions and deviations therefrom contained in this code.
(Ordinance 17-3650, sec. II, adopted 3/28/17)
All plumbing systems hereafter installed shall conform with the provisions of the 2015 edition of the International Plumbing Code, as amended.
(Ordinance 17-3650, sec. II, adopted 3/28/17)
(Ordinance 11-3542, sec. II (20-132), adopted 1/25/11; Ordinance 17-3650, sec. II, adopted 3/28/17)
[1]
Editor’s Note: The 2015 IPC amendments are included as an attachment to this chapter.