The engineer representing the subdivider shall present to the planning and zoning commission reproducible complete "as-built plans" for all paving, drainage structures, water lines and sewer lines within 30 days after completion of each contract.
(Ordinance 3-3-01, sec. 4.1, adopted 3/13/2001; 1997 Code, sec. 153.60)