Each and all applications for zoning amendments, variances, special exceptions, appeals, and approval of preliminary and final plats and construction plans shall be accompanied by their respective fees as identified below, including legal fees which may be incurred by the city in defending their application in a judicial or administrative proceeding. The applicant will post a deposit with the city at the time the application is given to the city. The initial deposit will be used to offset legal, administrative, and advertising costs of each application. If the total cost for each application is less than the deposit, the difference will be refunded to the applicant. If the cost for each application is more than the deposit, the applicant must pay the difference before any final approval is granted. The city reserves the right to request additional deposits from the applicant to offset additional costs for each of their applications. Such additional costs may include any administrative, legal, and advertising costs associated with a challenge to, or defense of, each application by the state or affected person who may wish to contest the application. If an applicant wishes to withdraw any of their applications, their deposit will be refunded less any costs incurred by the city.
APPLICATION | FEE |
|---|---|
Zoning amendment request | $300.00 |
Special exceptions | $100.00 |
Single use site plan: | |
Duplexes, apartment houses, townhouses, condominium developments, mobile home parks, etc., commercial uses, industrial uses | |
One (1) acre or less | Current engineering rates |
More than one (1) acre | Current engineering rates |
Re-evaluation or inspection of a site plan: | |
Preliminary site plan | Current engineering rates |
Final site plan | Current engineering rates |
Subdivision plats and plans: | |
Preliminary residential plats | Current engineering rates |
Plus per lots | Current engineering rates |
Preliminary Residential/Multifamily | Current engineering rates |
Plus per lots | Current engineering rates |
Preliminary Commercial/Industrial | Current engineering rates |
Plus per lots | Current engineering rates |
Final Residential Plats | Current engineering rates |
Plus per lots | Current engineering rates |
Final Residential/Multifamily | Current engineering rates |
Plus per lots | Current engineering rates |
Final Commercial/Industrial | Current engineering rates |
Plus per lots | Current engineering rates |
Minor Subdivision Plats: | |
Four (4) lots or less | Current engineering rates |
Re-evaluation or inspection of a plat: | |
Preliminary plat | Current engineering rates |
Final plat | Current engineering rates |
(Ordinance 13-1022-01 adopted 10/22/13; Am. Ordinance 15-0127-02 adopted 1/27/15; Am. Ordinance 15-0428-01 adopted 4/28/15; Am. Ordinance 16-0927-06 adopted 9/27/16; Am. Ordinance 19-0122-03 adopted 1/22/19; Am. Ordinance 19-0528-01 adopted 5/28/19; Am. Ordinance 19-0603-01 adopted 6/3/19; Am. Ordinance 22-0625-02 adopted 6/28/22)