Contractor shall provide a completed course of treated subgrade material containing a consistent lime mixture, having no loose or segregated areas, of uniform density and moisture, well compacted to its full depth, and having a smooth surface adequate for placing additional subbase, base or surface courses. The Contractor shall be responsible for regulating the sequence of the work, for processing a sufficient quantity of material to provide a full depth stabilized subgrade as shown on the plans, using the appropriate amount of lime, maintaining the work, and performing any reworking of the courses if necessary to meet the requirements.