Both the materials and the source of the supply must be approved by the Engineer or the designated representative of the Engineer prior to the delivery of any materials.
(Ordinance 2007-106, App. B, adopted 3/20/07)
A.A.S.H.T.O. | ||||
|---|---|---|---|---|
Test Method | 135 | 175 | 230 | |
Penetration at 77° F, 100 gms. 5 sec. | T-49 | 120–150 | 150–200 | 210–250 |
Ductility at 77° F, cms., not less than | T-51 | 100 | 70 | 70 |
Flash Point, degrees F, not less than | T-79 | 450 | 450 | 450 |
Melting Point, degrees F | T-53 | 104–140 | 95–130 | 86–122 |
Solubility in Carbon Tetrachloride not less than | T-44 1 | 99.5% | 99.5% | 99.5% |
Loss on heating at 325° F 5 hrs. not more than | T-47 | .75% | .75% | .75% |
Penetration of residue from loss on heating 77° F, 100 gpms., 5 sec. as compared to penetration before heating not less than | T-49 | 70% | 90% | 125% |
Oliensis Spot Test | T-102 | Neg. | Neg. | Neg |
1 Except CCL 4 is used instead of CS 2 |
SEAL COAT | ||
|---|---|---|
Aggregate - | Retained on 3/8" screen..... | 0% |
Retained on 1/4" screen..... | 2-20% | |
Retained on 10 mesh sieve..... | 70–100% | |
Retained on 20 mesh sieve..... | 95–100% | |