As used in this article, the following terms shall have the respective meanings ascribed to them. Words and terms used in this article, but not defined in this article shall have the meaning ascribed to them in the subdivision ordinance. Words and terms defined in both the subdivision ordinance and this article shall be read in harmony unless there exists an irreconcilable conflict in which case the definition contained in this article shall control.
City.
The City of Westworth Village, Texas.
Developer.
The owner of land proposed to be developed, or the person or entity filing an application for development of land, or their representatives.
Development.
Any activity that requires the submission of a subdivision plat (excluding a one-lot replat), development plan or the securing of a building permit.
Escrow.
Money placed in the possession of the city to accomplish the purposes set out in this article, including, but not limited to, the following:
(1) 
Purchase of right-of-way; and
(2) 
The design and construction of public utilities and streets.
(Ordinance 375 adopted 7/14/15)
The purpose of this article is to provide for the orderly, safe and healthy development of the area both within the city and within its extraterritorial jurisdiction and to promote the health, safety and general welfare of the community. It is also the purpose of this article to establish responsibilities for the extension of water and sewer mains and other public utility improvements into the various drainage basins located within the city limits and its extraterritorial jurisdiction, to provide a procedure for acquiring necessary easements and rights-of-way, and to establish responsibilities for paying for the cost of constructing the water and sewer improvements, preparing the engineering and survey work necessary to design and install the water and sewer improvements and the cost of inspecting any and all construction undertaken pursuant to this article. This article is designed to be used in conjunction with the subdivision ordinance to ensure an orderly development plan for the growth of the community, and to ensure the creation and effective operation of a utility infrastructure appropriate in size and character to support reasonable levels of development within the community.
(Ordinance 375 adopted 7/14/15)
(a) 
Development within the city and its extraterritorial jurisdiction within the city’s certificate of convenience and necessity (CCN) shall be provided with an approved water supply and distribution system and with an approved sewage collection and disposal system. Connection with the city’s sanitary sewer system shall be required except where the city engineer determines that such connection will require unreasonable expenditures when compared with other methods of sewage disposal.
(b) 
The developer shall pay all costs attributable to the installation of water and sewer facilities as are needed to fulfill the basic criteria requirements of the city for service within the subdivision.
(c) 
The construction of all water and sewer infrastructure for a subdivision shall be covered by a written agreement prepared or approved by the city attorney which clearly defines the scope and details of the proposed improvements and particularly contains the developer’s agreement to abide by all regulations of the city and to deliver to the city clear and unencumbered title to all the proposed improvements at the time of acceptance by the city, which must be prior to commencing service.
(d) 
The city intends to extend public utility service to all areas within its corporate limits and its extraterritorial jurisdiction within the city’s CCN at some point in the future. Public utility system extensions will be made in conformance with the city’s adopted capital improvement program and are projected to occur over many years based upon the fiscal capability of the city and the growth characteristics of each area of the city.
(Ordinance 375 adopted 7/14/15)
It shall be unlawful for any person to provide water or sewer service to any lot or tract of land or any part thereof unless and until a plat of such lot or tract of land meeting the platting requirements of the city, has been approved by the planning and zoning commission and the city council and has been filed for record with the county. Before consideration of a final plat by the planning and zoning commission, the developer of the tract or subdivision shall submit to the city engineer for his approval a map or plat showing the location of water and sanitary sewer mains which will be required to ensure adequate service and fire protection for the lots specified in the proposed tract or subdivision.
(Ordinance 375 adopted 7/14/15)
(a) 
In the event that a development proposal is submitted which will require the use of a public water and/or sewer system, and no such public system has yet been extended into the area where the proposed development is located, it will be the responsibility of the developer to comply with the terms and conditions of this article in order to ensure availability of service.
(b) 
It is, and shall remain, the responsibility of each individual developer to undertake those construction activities necessary to tie his or her development project into the water or sewer main serving that specific drainage basin or service area. Should a lift station and/or force main be required in order to utilize a proposed off-site service location, such lift station and/or force main shall be installed at the developer’s cost. In order to promote economic development, the city and/or the economic development corporations (“type A EDC” and/or “type B EDC”) of the city may participate in construction of water and sewer mains and infrastructure, provided that the city and/or the type A EDC and type B EDC may share in pro-rata reimbursement described in section 13.06.009.
(Ordinance 375 adopted 7/14/15)
(a) 
When a developer plans to undertake a specific development project within the city or its extraterritorial jurisdiction and the development will require service through a public water and/or sewer system, it will be the responsibility of the developer to contact the city to determine system availability. The developer will advise the city in writing of the specific location of his development, the total size of the development in acreage, living units and/or square feet of commercial or industrial space, the type of development and land use to occur within the subdivision and the approximate time when public utilities will be required. The information may be incorporated into a preliminary plat or development plan application submitted to the city.
(b) 
The city shall review the city’s current water and sanitary sewer system and determine whether service is currently available to the development. If service is available through an existing main, the city shall identify the point on that main where the development will be permitted to tie into the system and will advise the developer in writing of the location where a tie-in will be permitted. The city shall support such written notice with such map exhibits as are necessary to clearly delineate the point of tie-in.
(c) 
In the event that a connection to an existing utility main is possible, the city will determine if the utility main has been installed by the city as a portion of its capital improvement program or whether it was installed by a prior developer under the approach main extension policies of this article. In the event that the utility main was installed by the city as a portion of its capital improvement program, the developer will be advised that there will be no pro-rata reimbursement charge to tie into the utility main, the developer will be responsible for the entire cost of the approach main or service line connecting his development to the utility main.
(d) 
If the utility main or a portion of the utility system serving the development was previously installed anticipating future reimbursement per this article, the city will advise the developer of his pro-rata share of costs for connection to this line. The developer shall pay the pro-rata charge to the city prior to making a tie-in to the system.
(Ordinance 375 adopted 7/14/15)
If the city should determine that utility service to a proposed development is not available at the present time, the developer will be so advised in writing. In this situation, the developer must select among the following alternatives:
(1) 
Discontinue his proposed development until such time as a utility system has been installed within the drainage basin or service area;
(2) 
Petition the city council to expedite the construction of a utility system capable of serving the proposed development under its regular capital improvement program; or
(3) 
Install the necessary utilities to the point necessary to serve the development. The developer will be responsible for all costs associated with the installation of necessary utilities, including but not limited to engineering, attorney fees, surveying, testing, easement preparation, easement acquisition, construction and inspection. The public utilities will be designed and constructed to city standards and specifications as the city determines to be applicable. The developer may install the public utilities himself or may contract with the city to secure construction of the utilities by the city. All financial arrangements, including any necessary bonding, shall be completed prior to the execution of a developer agreement. In the event that a developer elects to pursue this alternative, he will be eligible to receive a pro-rata reimbursement, for a period of ten (10) years, from future developers who tie into these specific utilities. If the city and/or the type A EDC and type B EDC have participated with the developer in the costs associated with the installation of the necessary utilities, the city and/or the type A EDC and type B EDC will be eligible to receive a pro-rata reimbursement from future developers who tie into these specific utilities.
(Ordinance 375 adopted 7/14/15)
All water and sewer systems constructed within dedicated public right-of-way in connection with the development shall be and shall remain the property of the city and, after expiration of the maintenance bonds, shall be maintained by the city. Maintenance bonds shall be required for a period of two (2) years after acceptance of the water and sewer system.
(Ordinance 375 adopted 7/14/15)
(a) 
If a public utility system is installed within a drainage basin or service area by a developer, each subsequent development within the drainage basin or service area which ties into the public utility system shall pay a pro-rata share of the cost of the utility system installed by the initial developer. The pro-rata fee shall be paid prior to connection to the utility system. The pro-rata fee for each subsequent development seeking service shall be determined on a cost per acre basis by calculating the proportional area of the new development to the total area within the drainage basin or service area served by the public utility system, multiplied by the total cost of the public utility system installed by the initial developer. Total cost of the utilities may include construction, engineering, attorneys’ fees, surveying, testing, easement preparation, easement acquisition, and inspection costs.
(b) 
Provided the city collects the funds, each initial developer shall be entitled to a rebate of the pro-rata charge against subsequent developers for a period of ten (10) years following completion and acceptance of the utilities, or until the initial developer has been paid all allowable reimbursable charges, whichever occurs first. At the expiration of the tenth year, the developer will no longer be entitled to receive any reimbursement. At no time shall the developer be entitled to receive reimbursement for a sum greater than the initial cost of the public utilities less the pro-rata share of capacity of that utility system that would have been attributable to the initial development for its proportionate share of capacity in the system.
(c) 
The developer shall be responsible for providing to the city, and maintaining with the city, an accurate current address. When funds are available for disbursement, the city shall notify the developer at the address on file with the city. If the developer fails to pick up the funds within six (6) months of the date the city notifies the developer that the funds are available, the funds shall be forfeited to the city’s water and sewer fund.
(d) 
If the city and/or the type A EDC and type B EDC have participated in the costs associated with the installation of such public utilities, the city and/or the type A EDC and type B EDC will be eligible to receive a pro-rata reimbursement.
(Ordinance 375 adopted 7/14/15)
In order to provide appropriate capacity for reasonably anticipated development in a drainage basin or service area, the city, with the approval of the city council, may require a developer to install a utility line or system improvement larger than necessary to support the developer’s specific development. In the event that the city council requires the installation of a utility line or system improvement larger than required to serve the development, the developer installing the line will be reimbursed by the city for the difference in cost between the size of the line required by the city and the line size or system improvement required to serve the development. The size of the facilities required to serve the development shall be determined by the city.
(Ordinance 375 adopted 7/14/15)