A deposit is required in the amount listed in section A2.002 before professional or contracted services commence. These include legal, engineering, landscaping, fire, septic, and other similar services.
(Ordinance 2021-0907-01 adopted 9/7/21; Ordinance 2023-12 adopted 9/18/2023)
 
Deposit
(in addition to fee)
Fees
Annexation fees
 
 
$2,850.00
Zone change or text amendment (no planned development)
N/a
 
$1,450.00
Zone change (MU or PD), includes concept plan
 
 
 
0 to 5 acres
$1,500.00
 
$2,500.00
Excess of 5 acres
$2,000.00
 
$3,000.00
Special use permit
$1,000.00
 
$2,000.00
Zone change case withdrawal
 
 
 
Before publication of a notice of public hearing
Balance not used for review.
 
50% refund
After publication
Balance not used for review.
 
No refund
Minor plat or replat
$1,000.00
 
$1,000.00
Preliminary plat
 
 
 
Property zoned to a (SF) single-family district
$3,000.00
$15.00 per lot plus
$1,400.00
Commercial property or (MF) multifamily
$3,000.00
$25.00 per acre plus
$1,400.00
Final plat
 
 
 
Property zoned to a (SF) single-family district
$1,500.00
$15.00 per lot plus
$1,400.00
Commercial property or (MF) multifamily
$1,500.00
$25.00 per acre plus
$1,400.00
Civil construction plan review (fee based on minimum of 14.25 hours of review time by staff)
 
 
 
Property zoned to a (SF) single-family district
$2,000.00
$15.00 per lot plus
$2,117.12
Commercial property or (MF) multifamily
$2,000.00
$25.00 per acre plus
$2,117.12
Commercial site plan
 
 
 
New site with no prior development
$3,500.00
 
$1,750.00
Pre-engineered pad site
$1,500.00
 
$1,750.00
Vacating plat
 
 
$1,000.00
Application for property excluded from plat
 
 
$300.00
Appeal to board of adjustment
 
 
$850.00
Variance from zoning regulations considered by board of adjustments
 
 
$850.00
Waiver request of certain ordinance requirements to the town council
 
 
$450.00
Pre-submittal conference fee (consultants e.g. engineer, inspector, building clerk). Must be paid at least 3 business days before meeting
 
Per hour (one hour min)
$550.00
Drainage study, downstream assessment or detention pond construction
Submission in prior to a preliminary plat or site plan application
$2,500.00
No fee
Review without development application
$2,500.00
$500.00
(Ordinance 2021-0907-01 adopted 9/7/21; Ordinance 2023-12 adopted 9/18/2023)