A.
Permit applicability.
1.
An applicant for a Sign Permit must submit the application to the Planning Director or designee.
2.
All signs erected or installed in the City of Bee Cave or its ETJ require a Sign Permit, other than those exempted in subsection 4.1.3.
3.
A Sign Permit may be used to authorize multiple signs on a single property; however, each of the signs must comply fully with the requirements of this Article 4 and the City's requirements for detail drawings and technical specifications.
4.
The Sign Permit must be issued before work begins to install the sign.
B.
Complete permit and fee required.
1.
All signs that require a permit in Section 4.3 are subject to a permit fee. The amount of the fee is consistent with the City's Fee Schedule.
2.
The applicant must submit a complete permit application before the City will issue a Sign Permit.
3.
Incomplete permit applications will not be accepted or issued a permit. Information in the application that changes before the construction on the sign must be updated on the permit and approved by the Planning Director.
C.
Process to issue sign permit.
1.
Within ten (10) calendar days of receiving an application for a Sign Permit, the Planning Director will review the application for completeness.
2.
If the Planning Director finds that the application is incomplete, the Planning Director will send to the applicant a notice of the specific issues or deficiencies that prevent the Planning Director from issuing the permit, with citations to applicable portions of this Article 4.
(i)
The application will remain valid for 45 calendar days. If the applicant does not submit all required information within 45 days of the original submittal date of the permit, the permit is void and a new permit is required unless the Planning Director approves a written request for extension.
4.
Once the Planning Director has approved a Sign Permit, the applicant must erect or install the sign within 180 calendar days in accordance with the approved permit. If construction has not been completed within 180 calendar days, the permit is void and a new permit is required unless the Planning Director approves a written request for extension.
D.
Inspection required.
1.
The Planning Director may inspect the sign at any time during construction.
2.
At least one inspection is required before the Permit can be closed.
(i)
If construction is complete and the sign is in full compliance with the requirements of this Article 4, the Planning Director will issue a Certificate of Inspection and Compliance.
(ii)
If construction is complete but the sign is not in full compliance with the requirements of this Article 4, the Planning Director will notify the applicant within ten (10) calendar days of the specific issues or deficiencies that prevent the Planning Director from issuing a Certificate of Inspection and Compliance.
(iii)
The applicant must address each deficiency no later than thirty (30) calendar days after the Planning Director issues notice. If any deficiencies remain after thirty (30) days, the City will hold the applicant and property owner in violation and the sign will be subject to abatement proceedings, including removal of the sign at the expense of the property owner (see subsection 4.4.1).
(iv)
For a Sign Permit authorizing multiple signs, the Planning Director may issue a partial Certificate of Inspection and Compliance for individual signs as they are completed.
(Ordinance 475 adopted 6/28/22)