(a) Contractors
that must register with the city are building contractors, electrical
contractors, plumbing contractors, mechanical contractors, sign contractors,
general contractors, roofing contractors, and irrigation and backflow
contractors. Each registered contractor must provide city with proof
of liability insurance.
(b) Commercial
permit table:
Total Building Areas
(Square Foot)
|
Fee
|
---|
Up to 2,500
|
$965.00
|
2,501 to 10,000
|
$260.00 + $0.28/sq. ft
|
10,001–50,000
|
$645.00 + $0.25/sq. ft
|
50,001–100,000
|
$1,940.00 + $0.22/sq. ft
|
100,001–300,000
|
$3,220.00 + $0.21/sq. ft
|
Over 300,001
|
$7,110.00 + $0.20/sq. ft
|
(1) New
residential structure: $0.70 per square foot of all floor area under
roof.
(2) Commercial
structures - new, repairs to, and alterations to: Per commercial permit
table.
(3) New
multifamily complex: Per commercial permit table.
(4) Investigation
fee for working w/o permits: Double the permit fee.
(5) Permit
renewal fee: 75% of the original permit fee.
(6) Residential
plan review fee: 25% of the building permit or $50.00, whichever is
greater.
(7) Commercial/multifamily
plan review fee: 40% of the building permit or $150.00, whichever
is greater.
(8) Reinspection
fee - 1st: $50.00.
(9) Reinspection
fee - subsequent: $75.00.
(10) Inspections outside of regular business hours: $65.00/hr. (min. 2
hours).
(11) Drive approach fee: $60.00.
(12) Cement/asphalt work: $0.10 per total pad square footage.
(13) Commercial certificate of occupancy: $100.00.
(14) Demolition permit - Res: $60.00.
(15) Demolition permit - Com: $100.00.
(16) Demolition deposit: $200.00 (will be returned after a final inspection
if all trash, rubbish, etc has been cleared.
(17) Residential additions: $0.60 per square footage of addition.
(18) Residential alterations and repairs: $0.35 per square footage; minimum
fee $100.00.
(19) Residential windows and doors just window/door and frame): $10.00
per window/door.
(20) Detached garages: $0.60 per square footage of structure.
(22) Portable and accessory buildings: $0.42 per total building square
footage.
(23) In-ground swimming pool: $450.00.
(24) Above-ground swimming pool, spas, and Jacuzzi: $50.00.
(26) Mobile home (move in or out): $40.00.
(27) Roofing decking: $100.00.
(28) Unauthorized cover up fee: $75.00.
(Ordinance 758-2019, sec. 2, adopted 6/20/19; Ordinance 760-2019, sec. 2, adopted 7/18/19)
(a) Subcontractor
permits - electrical, mechanical, and plumbing
Base fee
|
$60.00
|
New residential structures
|
$0.06/total sq. ft.
|
New commercial structures
|
$0.08/total sq. ft.
|
Res. remodels, addition, & alterations
|
$0.06/total sq. ft.
|
Com. remodels, addition, & alterations
|
$0.08/total sq. ft.
|
Electrical temp poles
|
$60.00
|
Upgrade electrical service
|
$100.00
|
Sign electrical
|
$60.00
|
Swimming pool electrical/plumbing
|
$60.00
|
Contractor registration
|
$100.00
|
New mechanical system
|
$60.00/air handling unit
|
(b) Irrigation
system: $60.00.
(c) Seasonal
permits: $50.00.
(d) Temporary
use and sales: $25.00.
(e) Mobile
home park annual permits: $100.00.
(g) Investigation
fee for working without permits: Double permit fee.
(Ordinance 691-2017 adopted 9/7/17; Ordinance 760-2019, sec. 3, adopted 7/18/19)
(a) Permanent
Type: Canopy, marquee, projections, ground, monument, pole, wall,
& roof:
4–25 sq. ft.
|
$60.00
|
25–50 sq. ft.
|
$100.00
|
50 sq. ft. & over
|
$200.00
|
(b) Nonpermanent
type: search light, banner, balloon or inflatable, & portable:
$25.00.
(c) Sign
recovery fee: $25.00.
(d) Sign
plan review: 25% of permit.
(e) Contractor
registration: $50.00.
(f) Sign
waiver from city council: $150.00.
(Ordinance 691-2017 adopted 9/7/17)
(a) Culvert
installation:
(1) City purchases culvert.
Cost of culvert + cost of equipment
& supplies: $40.00 per hour/per crew.
(2) Applicant purchases culvert:
Cost of equipment &
supplies: $40.00 per hour/per crew.
(b) Street
construction: 3% of total cost of project, $75.00 minimum.
(c) Street
cut: $5.00 @ linear foot, $75.00 minimum.
(d) Sidewalks:
3% of total cost, $60.00 minimum.
(e) Storm
sewers: 3% of total cost of project, $75.00 minimum.
(Ordinance 494-2010 adopted 1/21/10)