Variances may be granted by the board of adjustment to the provisions of this chapter in accordance with the rules and conditions of this division. A variance may not be granted, however, to authorize a change of use. Variances run with the land, but each variance is specific to the project for which it was granted.
(Ordinance 2021-004, att. G, adopted 6/23/21; Ordinance 379 adopted 9/25/19)