[Added 11-7-1994 by Ord. No. 94-5]
Applicants shall be required, as a condition for approval of a subdivision, site plan or conditional use, to pay their pro rata share of the cost of providing reasonable and necessary street improvements and/or water, sewerage and drainage facility improvements, and any necessary easements therefor, located outside the property limits of the subject premises but indicated in the Township Master Plan and necessitated or required by construction or improvements within such subdivision or development.
[Amended at time of adoption of Code (see Ch. 1, General Provisions, Art. I)]
In cases where the need for an off-tract improvement is reasonably created by the proposed subdivision or development and where no other property owners receive a special benefit thereby (as opposed to a mere incidental benefit), the applicant may be required, as a condition of approval and at the applicant's sole expense, to acquire and/or improve lands outside the tract and dedicate such lands to the Township of Elsinboro or Salem County or, in lieu thereof, the subdivider or developer may be required to deposit with the Township a sum of money sufficient to allow the Township to acquire and/or improve such lands on conditions it may deem appropriate under the circumstances.
In cases where the need for any off-tract improvement to be implemented now or in the future is reasonably necessitated by the proposed development application, and where it is determined that properties outside the development also will be benefited by the improvement, the following criteria, together with the provisions of rules and regulations of the Township of Elsinboro or any department thereof, may be utilized in determining the developer's proportionate share of such improvements:
A. 
Sanitary sewers. For distribution facilities, including the installation, relocation or replacement of collector, trunk and interceptor sewers and the installation, relocation or replacement of other appurtenances associated therewith, the applicant's proportionate share shall be computed as follows:
(1) 
The capacity and the design of the sanitary sewer system shall be based on the Rules and Regulations for the Preparation and Submission of Plans for Sewerage Systems, New Jersey State Department of Environmental Protection, and all Elsinboro Township sewer design standards, including infiltration standards.
(2) 
Developer's pro rata share.
(a) 
The capacity of the existing system to serve the entire improved drainage area shall be computed. If the system is able to carry the total development drainage basin, no improvement or enlargement cost will be assigned to the developer, although some charges, including but not limited to capacity charges, may be imposed. If the existing system does not have adequate capacity for the total development drainage basin, the prorated enlargement or improvement share shall be computed as follows:
Developer's Prorated Share
=
Development gpd
Total Enlargement or Improvement Cost
Total Tributary gpd
(b) 
If it is necessary to construct a new system in order to develop the subdivision or development, the prorated enlargement share to the developer shall be computed as follows:
Developer's Prorated Share
=
Development Tributary gpd
Total Project Cost
Total Tributary gpd to New System
(c) 
Specific plans for the improved system or the extended system shall be prepared by the developer's engineer and submitted to the Planning Board during the time period when the Board is reviewing the proposed subdivision and/or site plan application. The total cost for the improvement and the developer's prorated share of the total cost shall be calculated by the developer's engineer, submitted to the Board, reviewed by the Township Engineer, and approved by the Planning Board, with any reasonable adjustments to the estimated costs at the time when preliminary approval of the application for development is granted.
[Amended at time of adoption of Code (see Ch. 1, General Provisions, Art. I)]
B. 
Roadways. For street widening, alignment, channelization of intersections, construction of barriers, new or improved traffic signalization, signs, curbs, sidewalks, trees, utility improvement uncovered elsewhere, the construction or reconstruction of new or existing streets and other associated streets or traffic improvements, the applicant's proportionate cost shall be determined as follows:
(1) 
The applicant's engineer shall provide the Township Engineer with the existing and anticipated peak-hour volumes which impact the off-tract areas in question, which volumes shall analyze pedestrian, bicycle and motor vehicle traffic.
(2) 
The applicant shall furnish a plan for the proposed off-tract improvements, which shall include the estimated peak-hour traffic generated by the proposed development. The ratio of the peak-hour traffic shall form the basis of the proportionate share. The prorated share shall be computed as follows:
Developer's Prorated Share
=
Additional Peak-Hour Traffic Generated by the Development
Total Cost of Roadway Improvement and/or Extension
Future Total Peak-Hour Traffic
(3) 
Specific plans for the roadway improvement and/or extension shall be prepared by the developer's engineer and submitted to the Planning Board during the time period when the Board is reviewing the proposed subdivision and/or site plan application. The total cost for the improvement and/or extension and the developer's prorated share of the total cost shall be calculated by the developer's engineer, submitted to the Board, reviewed by the Township Engineer, and approved by the Planning Board, with any reasonable adjustments to the estimated costs, at the time when preliminary approval of the application for development is granted.
[Amended at time of adoption of Code (see Ch. 1, General Provisions, Art. I)]
C. 
Drainage improvements. For the stormwater and drainage improvements, including the installation, relocation or replacement of storm drains, culverts, catch basins, manholes, riprap or improved drainage ditches and appurtenances thereto and the relocation or replacement of other storm drainage facilities or appurtenances associated therewith, the applicant's prorated share shall be determined as follows:
(1) 
The capacity and design of the drainage system to accommodate stormwater runoff shall be computed by the developer's engineer and approved by the Township Engineer and shall be based on a method either described in Urban Hydrology for Small Watersheds, Technical Release 55, Soil Conservation Service USDA, January 1986, as amended, or as described in American Society of Civil Engineers Manuals and Reports on Engineering Practice No. 37, 1974, as amended, or as otherwise approved by the Township Engineer.
(2) 
The capacity of the enlarged, extended or improved system required for the subdivision or development and areas outside of the subdivision or development shall be computed by the developer's engineer and be subject to the approval of the Township Engineer. The plans for the improved system shall be prepared by the developer's engineer and the estimated cost of the enlarged system shall be calculated by the Township Engineer. The prorated share for the proposed improvement shall be computed as follows:
Developer's Prorated Share
=
Development cfs
Total Enlargement or Improvement Cost of Drainage Facilities
Total Tributary cfs
(3) 
Specific plans for the enlargement or improvement of the drainage facilities shall be prepared by the developer's engineer and submitted to the Planning Board during the time period when the Board is reviewing the proposed subdivision and/or site plan application. The total cost for the enlargement or improvement and the developer's prorated share of the total cost shall be calculated by the developer's engineer, submitted to the Board, reviewed by the Township Engineer, and approved by the Planning Board, with any reasonable adjustments to the estimated costs, at the time when preliminary approval of the application for development is granted.
[Amended at time of adoption of Code (see Ch. 1, General Provisions, Art. I)]
D. 
Water.
(1) 
Regarding all nonresidential developments and all planned developments, and regarding subdivisions where public water is accessible, water mains shall be constructed and connected to the existing public water supply systems by the applicant, at the applicant's sole expense, and in such a manner as to make adequate water service available to each lot or building within the development. The entire system shall be designed in accordance with the requirements and standard of the local and/or state agency having approval authority and shall be subject to its approval. The system also shall be designed with adequate capacity and sustained pressure and in a looped system with no dead-end lines, whenever possible. For the purpose of this section, "accessible" shall mean that the property to be developed is no further from an existing water main than the number of feet calculated by multiplying the number of lots in the proposed subdivision by 200 or, in the case of subdivisions in which more than 15 lots are proposed, "accessible" shall mean that the property to be developed is within one mile of an existing water main.
(2) 
Where no public water is accessible to a subdivision as defined hereinabove, water shall be furnished on an individual lot basis. If wells are installed on each lot and the lot also contains its own sewage disposal facilities, the wells shall be of the drilled type with a minimum 100 feet of casing where possible or, where such minimum footage of casing is not possible, the well shall be drilled at least 20 feet into unweathered rock. Well installation, sealing and testing shall be in accordance with the New Jersey Standards for Construction of Water Supply Systems in Realty Improvements (Chapter 199 of the Public Laws of 1954),[1] as amended, and in accordance with the guidelines and resolutions adopted by the County Health Department. Prior to being placed in consumer use and prior to issuance of a certificate of occupancy for any building served by the well, the developer shall certify to the County Health Department that he/she has complied with all applicable state, county and local regulations.
[Amended at time of adoption of Code (see Ch. 1, General Provisions, Art. I)]
[1]
Editor's Note: See N.J.S.A. 58:11-23 et seq.
(3) 
Where no public water is accessible to a subdivision as defined hereinabove, in addition to complying with the other applicable provisions of this chapter, the applicant shall deposit funds in escrow with the Township of Elsinboro in an amount equal to the cost of connecting the subdivision to an existing public water supply system calculated on the basis of 200 feet per unit. The escrow amount shall be calculated by determining the costs of providing such water main extension as charged by the public water utility for such service, including, but not limited to, materials, installation, taxes, appurtenances and surcharges, if any.
(4) 
In lieu of depositing the aforesaid escrow funds, the applicant may, at his/her option, elect to install water main extensions in the subdivision, even though public water may not be accessible as defined hereinabove.
Where the proposed off-tract improvement is to be undertaken at a future date, funds required for the improvement shall be deposited to the credit of the Township of Elsinboro in a separate account until such time as the improvement is constructed. In lieu of a cash escrow account, developers may present irrevocable letters of credit for the term required in a form acceptable to the Township Attorney. If the off-tract improvement is not begun within 10 years of the deposit, all monies and interest shall be returned to the applicant or the letter of credit, as the case may be, surrendered. An off-tract improvement shall be considered "begun" if the Township of Elsinboro has taken legal steps to provide for the design and financing of such improvements.
[Amended at time of adoption of Code (see Ch. 1, General Provisions, Art. I)]
A. 
Where applications for development suggest the need for off-tract improvements, whether to be installed in conjunction with development in question or otherwise, the Planning Board shall forthwith forward to the Township Committee a list and description of all such improvements, together with a request that the Township Committee determine and advise the Board of the procedure to be followed in construction or installation thereof, including timing. The Board shall defer final action upon the subdivision or site plan until receipt of the Township Committee determination or the expiration of 90 days after the forwarding of such list and description to the Township Committee without determination having been made, whichever comes sooner.
B. 
The Township Committee, within 90 days of receipt of said list and description, shall determine and advise the Planning Board concerning the procedure to be followed and advise the Board with regard to suggested conditions of approval, if any, to adequately protect the municipality.
C. 
In the event that the Planning Board is required by statute to act upon the application prior to receipt of the Township Committee's determination as to construction of off-tract improvements, it shall request the applicant to consent to an extension of time within which to act, of sufficient duration to enable the Township Committee to make the aforesaid determination. In the event that the applicant is unwilling to consent to the requested extension of time, the Planning Board shall, in its discretion, either itself determine the procedure to be followed in constructing the aforesaid improvements or shall condition its approval upon the subsequent determination of the Township Committee.
A. 
In all cases, developers shall be required to enter into an agreement or agreements with the Township Committee in regard to off-tract improvements within one year from the date of municipal subdivision or site plan approval and in accordance with this chapter and any other ordinances, polices, rules and regulations of the Township of Elsinboro, Salem County and the State of New Jersey and any departments, authorities or agencies thereof. Should such an agreement or agreements not be entered into within the aforesaid one-year time period, or within such extended time period as may be granted by the Township Committee, the municipal subdivision and/or site plan approval shall be deemed null and void.
B. 
Where properties outside the subject tract will be benefitted by the improvements, the Township Committee may require the applicant to escrow sufficient funds, in accordance with § 115-98 hereinabove, to secure the developer's pro rata share of the eventual cost of providing future structural improvements based upon the standards expressed herein.
C. 
Where properties outside the subject tract will benefit by the improvements, the Township Committee may determine that the improvement or improvements are to be installed by the municipality as a general improvement, the cost of which is to be borne as a general expense. If the Township Committee shall determine that the improvement or improvements shall be constructed or installed as a general improvement, the Township Committee may direct the Planning Board to estimate, with the aid of the Township Engineer or such other persons who have pertinent information or expertise, the amount, if any, by which all properties, including the subject tract, will be specifically benefitted thereby, and the subdivider or developer shall be liable to the municipality for such expense.
D. 
If the Township Committee shall determine that the improvement or improvements shall be constructed or installed as a local improvement, all or a part of the cost of which is to be assessed against properties benefitted thereby in proportion to the benefits conferred by the improvements in accordance with Chapter 56 of Title 40 of the Statutes of the State of New Jersey, the developer may be required to sign an agreement acknowledging and agreeing to this procedure and, in addition, the Township Committee may require that the developer shall be liable to the municipality, in addition to the amount of any special assessments against the subject property for benefits conferred by the improvement or improvements, the difference between the total cost actually incurred and the total amount by which all properties, including the subject tract, are specially benefitted by the improvement as the same may be determined by the Township Tax Assessor.
[Amended at time of adoption of Code (see Ch. 1, General Provisions, Art. I)]
E. 
If the Township Committee shall determine that the improvements are to be constructed or installed by the applicant, such agreement may contain provisions, consistent with the standards in this chapter and any other rules, regulations or policies of the Township of Elsinboro, County of Salem and the State of New Jersey and any departments, authorities or agencies thereof with jurisdiction therein, whereby the applicant shall be reimbursed by the municipality or otherwise, as a result of any participation fees, connection charges, charges paid in regard to developer's agreements with other applicants and the like, all in accordance with an agreement between the Township Committee and the applicant.
F. 
In determining the procedures to be followed in the event of the submission of a list and request from the Planning Board, the Township Committee shall be guided by the following standards and considerations:
(1) 
The local trends in regard to the probability of development within the drainage or circulation area in question and the intensity of such development;
(2) 
The risk and exposure that neighboring areas are subject to in the event that the improvements to be required are delayed;
(3) 
The extent to which temporary measures may sufficiently alleviate the condition or conditions requiring the off-tract improvement and the likelihood that larger, regional or subregional facilities will be required in the future to serve the development tract and the general area of the municipality in which the same is located; and
(4) 
The extent to which the health, safety and welfare of the residents, both current and future, depend upon the immediate implementation of the off-tract improvement.