(e)
Distributed generation.
(1)
The city electric utility will determine the delivered kWh and the received kWh on an ongoing, monthly basis.
(2)
Delivered KWh (energy) will be billed on the standard applicable rate schedule.
(3)
Received kWh (energy) will be multiplied by the utility's avoided cost of generation rate (ACGR).
(4)
The ACGR is based on the actual cost of generation from the city's wholesale supplier(s) divided by the total retail sales by the city for the billing period.
(5)
Any credit related to the ACGR shall be remitted by the city utility billing service to the customer in the billing period that the energy received was metered.
(6)
A one-time non-refundable installation set up fee of $50.00 will be required.
(7)
A monthly meter data processing fee will be charged at the rate of $3.00 per billing cycle.
(8)
The actual cost of the specialized DG meter will be charged to the customer.
(9)
Penalty: $1,000.00 if solar company starts work or energizes without inspections and approvals.
(Ordinance 1314 adopted 9/15/20; Ordinance 1328 adopted 9/21/2021; Ordinance 1349 adopted 10/18/2022; Ordinance 1366 adopted 9/19/2023; Ordinance 1386 adopted 9/17/2024; Ordinance 1401 adopted 9/16/2025; Ordinance 1405 adopted 11/18/2025)