A. 
Fees have been established by the Township as adopted by resolution or as otherwise allowed by law to defray plan review and construction inspection costs incurred by the Township. All fees listed in § 170-602A shall be paid by the applicant at the time of SWM site plan submission.
B. 
A review and inspection fee schedule has been established by resolution of the based on the size of the regulated activity and based on the Township's costs for reviewing SWM site plans, O&M plans and agreements and as-built plans, and conducting inspections pursuant to § 170-501. The Township shall periodically update the review and inspection fee schedule to ensure that review costs are adequately reimbursed.
A. 
The fees required of the applicant by this chapter shall, at a minimum, cover:
(1) 
Administrative costs;
(2) 
The review of the SWM site plan by the Township, the Township Engineer and other Township consultants;
(3) 
Coordination and meetings with the applicant;
(4) 
The inspection of erosion and sediment control measures, BMPs, conveyances and other related improvements during construction;
(5) 
Review of project communications, reports, and additional supporting information;
(6) 
Other site inspections;
(7) 
The final inspection upon completion of the BMPs, conveyances, and other stormwater management facilities and related improvements presented in the SWM site plan; and
(8) 
Review of final as-built plan submission and revised calculations, and inspections as needed.
B. 
The applicant shall also reimburse all expenses incurred by the Township for any additional work or Township consultant fees required to enforce any permit provisions regulated by this chapter, correct violations, and ensure proper completion of remedial actions.