When a preliminary plat of a proposed manufactured home park is approved in accord with the provisions of this part, a final plat thereof must be filed with the fire marshal, or his designee, within not more than thirty (30) days after the date of preliminary approval, unless an extension of filing time is requested by the applicant and granted by the city council prior to the expiration of such thirty (30) days. The final plat shall meet all requirements of a preliminary plat filed under this part and shall be on reproducible film, linen or other materials safe and suitable for reproduction. Accompanying the final plat shall be a complete set of plans and specifications, scaled no smaller than 1" = 100', prepared by a registered professional engineer of the state, for the construction of streets, parking areas, storm drainage, waterlines and hydrants, sewer lines, gas lines, underground utilities, buildings and other facilities required by this article, which shall establish alignment and grades, type of construction and other requirements in accordance with the manufactured home park standards prescribed in this article.
(Ordinance adopted 4/10/01)